Found 100 inspections:

# 772101419391
Unscheduled inspection
Start date: 2021-12-06, end date: 2021-12-13, duration: 6
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The purpose of the audit: carrying out control measures in connection with the verification of compliance with the instruction; The tasks of the audit: prevention, detection and suppression of violations of the requirements of project documentation, legislation on urban development by the audited person; The subject of the audit: verification of the elimination of violations specified in the instruction issued by Mosgosstroynadzor


# 772101426825
Unscheduled inspection
Start date: 2021-12-06, end date: 2021-12-17, duration: 10
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The purpose of the audit: carrying out control measures in connection with the verification of compliance with the instruction; The tasks of the audit: prevention, detection and suppression of violations of the requirements of project documentation, legislation on urban development by the audited person; The subject of the audit: verification of the elimination of violations specified in the instruction issued by Mosgosstroynadzor


# 772101470705
Unscheduled inspection
Start date: 2021-12-15, end date: —, duration:
Authority:
Purpose of inspection:


# 772101470706
Unscheduled inspection
Start date: 2021-12-15, end date: —, duration:
Authority:
Purpose of inspection:


# 772101162751
Unscheduled inspection
Start date: 2021-10-06, end date: —, duration:
Authority:
Purpose of inspection:


# 772101143232
Unscheduled inspection
Start date: 2021-10-04, end date: —, duration:
Authority:
Purpose of inspection:


# 772101209536
Unscheduled inspection
Start date: 2021-10-18, end date: —, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection:


# 772100700499
Unscheduled inspection
Start date: 2021-09-13, end date: —, duration:
Authority:
Purpose of inspection:


# 772100547226
Unscheduled inspection
Start date: 2021-09-03, end date: —, duration:
Authority:
Purpose of inspection:


# 772100749882
Unscheduled inspection
Start date: 2021-09-20, end date: —, duration:
Authority:
Purpose of inspection:


# 772100850119
Unscheduled inspection
Start date: 2021-09-20, end date: —, duration:
Authority:
Purpose of inspection:


# 772100439422
Unscheduled inspection
Start date: 2021-08-10, end date: 2021-08-23, duration: 10
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The purpose of the audit: carrying out control measures in connection with the verification of compliance with the instruction; The tasks of the audit: prevention, detection and suppression of violations of the requirements of project documentation, legislation on urban development by the audited person; The subject of the audit: verification of the elimination of violations specified in the instruction issued by Mosgosstroynadzor


# 772100439623
Unscheduled inspection
Start date: 2021-08-10, end date: —, duration:
Authority:
Purpose of inspection:


# 772100289173
Unscheduled inspection
Start date: 2021-06-16, end date: 2021-06-29, duration: 10
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit: carrying out control measures in connection with the receipt of a notification from the developer (customer); The objectives of the audit: prevention, detection and suppression of violations of the requirements of project documentation, legislation on urban development by the audited person; The subject of the audit: compliance of the work and the construction materials used in the construction process, reconstruction of the capital construction facility, as well as the results such works meet the requirements of the design documentation, including the requirements of energy efficiency and the requirements of equipping the capital construction facility with metering devices for the energy resources used, including checking the elimination of violations of compliance of the completed works with the requirements of the design documentation identified during construction control and state construction supervision


# 772100321305
Unscheduled inspection
Start date: 2021-06-29, end date: 2021-07-12, duration: 10
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The purpose of the audit: carrying out control measures in connection with the verification of compliance with the instruction; The tasks of the audit: prevention, detection and suppression of violations of the requirements of project documentation, legislation on urban development by the audited person; The subject of the audit: verification of the elimination of violations specified in the instruction issued by Mosgosstroynadzor


# 772100197248
Unscheduled inspection
Start date: 2021-05-12, end date: 2021-05-31, duration: 14
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit: carrying out control measures in connection with the implementation of the inspection program; The tasks of the audit: prevention, detection and suppression of violations of the requirements of project documentation, legislation on urban development by the audited person; The subject of the audit: checking the elimination of violations specified in the instruction issued by Mosgosstroynadzor compliance of the work and the construction materials used in the construction, reconstruction process the capital construction facility, as well as the results of such work, meet the requirements of design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used, including checking the elimination of violations of compliance of completed works with the requirements of design documentation identified during construction control and state construction supervision


# 772100197247
Unscheduled inspection
Start date: 2021-05-12, end date: —, duration:
Authority:
Purpose of inspection:


# 772100232393
Unscheduled inspection
Start date: 2021-05-21, end date: —, duration:
Authority:
Purpose of inspection:


# 772100108473
Unscheduled inspection
Start date: 2021-04-05, end date: 2021-04-30, duration: 20
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit: carrying out control measures in connection with the implementation of the inspection program; The tasks of the audit: prevention, detection and suppression of violations of the requirements of project documentation, legislation on urban development by the audited person; The subject of the audit: checking the elimination of violations specified in the instruction issued by Mosgosstroynadzor compliance of the work and the construction materials used in the construction, reconstruction process the capital construction facility, as well as the results of such work, meet the requirements of design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used, including checking the elimination of violations of compliance of completed works with the requirements of design documentation identified during construction control and state construction supervision


# 772100171258
Unscheduled inspection
Start date: 2021-04-22, end date: 2021-04-28, duration: 5
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The purpose of the audit: carrying out control measures in connection with the verification of compliance with the instruction; The tasks of the audit: prevention, detection and suppression of violations of the requirements of project documentation, legislation on urban development by the audited person; The subject of the audit: verification of the elimination of violations specified in the instruction issued by Mosgosstroynadzor


# 772100062617
Unscheduled inspection
Start date: 2021-03-18, end date: 2021-04-09, duration:
Authority: Glavnoe upravlenie gosudarstvennogo stroitelnogo nadzora Moskovskoi oblasti
Purpose of inspection: provedenie proverki na osnovanii izvescheniya ob okonchanii stroitelstva № P001-3727495220-43420252 ot 09.03.2021


# 772100046773
Unscheduled inspection
Start date: 2021-03-04, end date: 2021-03-31, duration: 19
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit: carrying out control measures in connection with the implementation of the inspection program; The tasks of the audit: prevention, detection and suppression of violations of the requirements of project documentation, legislation on urban development by the audited person; The subject of the audit: checking the elimination of violations specified in the instruction issued by Mosgosstroynadzor compliance of the work and the construction materials used in the construction, reconstruction process the capital construction facility, as well as the results of such work, meet the requirements of design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used, including checking the elimination of violations of compliance of completed works with the requirements of design documentation identified during construction control and state construction supervision


# 772100083535
Unscheduled inspection
Start date: 2021-03-22, end date: 2021-04-02, duration: 10
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The purpose of the audit: carrying out control measures in connection with the verification of compliance with the instruction; The tasks of the audit: prevention, detection and suppression of violations of the requirements of project documentation, legislation on urban development by the audited person; The subject of the audit: verification of the elimination of violations specified in the instruction issued by Mosgosstroynadzor


# 772100013223
Unscheduled inspection
Start date: 2021-02-15, end date: —, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection:


# 772105325745
Unscheduled inspection
Start date: 2021-02-01, end date: —, duration:
Authority:
Purpose of inspection:


# 772105300109
Unscheduled inspection
Start date: 2021-02-01, end date: —, duration:
Authority:
Purpose of inspection:


# 772005280469
Unscheduled inspection
Start date: 2020-12-17, end date: —, duration:
Authority:
Purpose of inspection:


# 772005268832
Unscheduled inspection
Start date: 2020-12-11, end date: —, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection:


# 502005292255
Unscheduled inspection
Start date: 2020-12-30, end date: 2021-01-29, duration:
Authority: Glavnoe upravlenie gosudarstvennogo stroitelnogo nadzora Moskovskoi oblasti
Purpose of inspection: provedenie proverki na osnovanii izvescheniya ob okonchanii stroitelstva P001354974027341660561 ot 24122020


# 772005210537
Unscheduled inspection
Start date: 2020-11-02, end date: —, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection:


# 772005209042
Unscheduled inspection
Start date: 2020-11-02, end date: —, duration:
Authority:
Purpose of inspection:


# 772005210482
Unscheduled inspection
Start date: 2020-11-03, end date: —, duration:
Authority:
Purpose of inspection:


# 772005154271
Unscheduled inspection
Start date: 2020-10-19, end date: 2020-11-13, duration: 19
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit are to carry out control measures in connection with the implementation of the audit program The tasks of the audit are to prevent identify and suppress violations of the requirements of the design documentation of the legislation on urban development by the audited person The subject of verification is the compliance of the work and the construction materials used during the construction reconstruction of the capital construction facility as well as the results of such work with the requirements of the design documentation, including the requirements of energy efficiency and the requirements of equipping the capital construction facility with metering devices for energy resources used, including checking the elimination of violations of compliance of completed works with the requirements of project documentation identified during construction control and state construction supervision


# 772004451093
Unscheduled inspection
Start date: 2020-08-04, end date: —, duration:
Authority:
Purpose of inspection:


# 772004469006
Unscheduled inspection
Start date: 2020-08-10, end date: —, duration:
Authority:
Purpose of inspection:


# 772004450687
Unscheduled inspection
Start date: 2020-07-07, end date: —, duration:
Authority:
Purpose of inspection:


# 772004450714
Unscheduled inspection
Start date: 2020-07-15, end date: —, duration:
Authority:
Purpose of inspection:


# 772004340322
Unscheduled inspection
Start date: 2020-03-09, end date: 2020-03-16, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit are to carry out control measures in connection with the receipt of a notification from the developer of the customer's task of verification, to prevent the identification and suppression of violations of the requirements of the design documentation of the legislation on urban planning activity by the audited person, to check and verify the elimination of violations specified in the order issued by Mosgosstroynadzor


# 772004327798
Unscheduled inspection
Start date: 2020-03-05, end date: 2020-04-02, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit are to carry out control measures in connection with the verification of compliance with the requirements of the task of the audit, to prevent the identification and suppression of violations of the requirements of the design documentation of the legislation on urban planning activity by the audited person, to verify the elimination of violations specified in the order issued by Mosgosstroynadzor


# 772004321239
Unscheduled inspection
Start date: 2020-03-02, end date: —, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection:


# 772004317326
Unscheduled inspection
Start date: 2020-03-02, end date: —, duration:
Authority:
Purpose of inspection:


# 772004307530
Unscheduled inspection
Start date: 2020-03-04, end date: —, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection:


# 772004367726
Unscheduled inspection
Start date: 2020-03-18, end date: 2020-04-03, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit are to carry out control measures in connection with the implementation of the verification program verification tasks prevention identification and suppression of violations of the requirements of the design documentation of the legislation on urban planning activity by the audited person, subject to verification of compliance of the work and construction materials used during the construction reconstruction of the capital construction facility as well as the results of such work with the requirements of the design documentation, including energy efficiency requirements and equipment requirements of the capital construction facility metering devices for energy resources used


# 772004249454
Unscheduled inspection
Start date: 2020-02-03, end date: —, duration:
Authority:
Purpose of inspection:


# 772004296731
Unscheduled inspection
Start date: 2020-02-21, end date: 2020-02-28, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit are to carry out control measures in connection with the verification of compliance with the requirements of the task of the audit, to prevent the identification and suppression of violations of the requirements of the design documentation of the legislation on urban planning activity by the audited person, to verify the elimination of violations specified in the order issued by Mosgosstroynadzor


# 772004166634
Unscheduled inspection
Start date: 2020-01-09, end date: —, duration:
Authority:
Purpose of inspection:


# 772004166619
Unscheduled inspection
Start date: 2020-01-13, end date: —, duration:
Authority:
Purpose of inspection:


# 772004210338
Unscheduled inspection
Start date: 2020-01-20, end date: 2020-01-24, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit are to carry out control measures in connection with the verification of compliance with the requirements of the task of the audit, to prevent the identification and suppression of violations of the requirements of the design documentation of the legislation on urban planning activity by the audited person, to verify the elimination of violations specified in the order issued by Mosgosstroynadzor


# 772004206916
Unscheduled inspection
Start date: 2020-01-20, end date: —, duration:
Authority:
Purpose of inspection:


# 771904047050
Unscheduled inspection
Start date: 2019-12-02, end date: 2019-12-27, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: Celi proverkiprovedenie meropriyatii po kontrolyu v svyazi s vypolneniem programmy proverok na osnovanii utverzhdennoi programmy proverok ot 24102018 1 Zadachi proverkipreduprezhdenie vyyavlenie i presechenie dopuschennyh proveryaemym licom narushenii trebovanii proektnoi dokumentacii zakonodatelstva o gradostroitelnoi deyatelnostiPredmet proverkisootvetstvie vypolneniya rabot i primenyaemyh stroitelnyh materialov v processe stroitelstva rekonstrukcii obekta kapitalnogo stroitelstva a takzhe rezultatov takih rabot trebovaniyam proektnoi dokumentacii v tom chisle trebovaniyam energeticheskoi effektivnosti i trebovaniyam osnaschennosti obekta kapitalnogo stroitelstva priborami ucheta ispolzuemyh energeticheskih resursov


# 771904075573
Unscheduled inspection
Start date: 2019-12-09, end date: 2019-12-18, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit are to carry out control measures in connection with the verification of compliance with the requirements of the task of the audit, to prevent the identification and suppression of violations of the requirements of the design documentation of the legislation on urban planning activity by the audited person, to verify the elimination of violations specified in the order issued by Mosgosstroynadzor


# 771904099342
Unscheduled inspection
Start date: 2019-12-12, end date: 2019-12-18, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit are to carry out control measures in connection with the verification of compliance with the requirements of the task of the audit, to prevent the identification and suppression of violations of the requirements of the design documentation of the legislation on urban planning activity by the audited person, to verify compliance with the instructions of the Moscow State Construction Supervision


# 771904126861
Unscheduled inspection
Start date: 2019-12-18, end date: —, duration:
Authority:
Purpose of inspection:


# 771903644100
Unscheduled inspection
Start date: 2019-10-04, end date: —, duration:
Authority:
Purpose of inspection:


# 771903628920
Unscheduled inspection
Start date: 2019-10-04, end date: —, duration:
Authority:
Purpose of inspection:


# 771903643787
Unscheduled inspection
Start date: 2019-09-23, end date: —, duration:
Authority:
Purpose of inspection:


# 771903643661
Unscheduled inspection
Start date: 2019-09-23, end date: 2019-09-27, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit are to carry out control measures in connection with the implementation of the verification program verification tasks prevention identification and suppression of violations of the requirements of the design documentation of the legislation on urban planning activity by the audited person, subject to verification of compliance of the work and construction materials used during the construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of the design documentation, including energy efficiency requirements and equipment requirements of the facility capital construction with metering devices for energy resources used, verification of the elimination of violations specified in the order issued by Mosgosstroynadzor


# 77190803487712
Unscheduled inspection
Start date: 2019-08-30, end date: —, duration:
Authority:
Purpose of inspection:


# 77190803478553
Unscheduled inspection
Start date: 2019-08-14, end date: —, duration:
Authority:
Purpose of inspection:


# 77190803461322
Unscheduled inspection
Start date: 2019-08-01, end date: 2019-08-14, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used, verification of the elimination of violations specified in the order issued by Mosgosstroynadzor


# 77190803456781
Unscheduled inspection
Start date: 2019-07-12, end date: 2019-07-25, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor


# 77190803444851
Unscheduled inspection
Start date: 2019-07-04, end date: —, duration:
Authority:
Purpose of inspection:


# 77190803456708
Unscheduled inspection
Start date: 2019-07-09, end date: 2019-07-29, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor


# 77190803432245
Unscheduled inspection
Start date: 2019-06-10, end date: 2019-06-12, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor


# 77190803432243
Unscheduled inspection
Start date: 2019-06-17, end date: —, duration:
Authority:
Purpose of inspection:


# 77190803427405
Unscheduled inspection
Start date: 2019-06-03, end date: —, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection:


# 77190803419918
Unscheduled inspection
Start date: 2019-05-27, end date: 2019-06-07, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor


# 77190803423889
Unscheduled inspection
Start date: 2019-05-28, end date: —, duration:
Authority:
Purpose of inspection:


# 77190803397187
Unscheduled inspection
Start date: 2019-05-06, end date: —, duration:
Authority:
Purpose of inspection:


# 77190803400977
Unscheduled inspection
Start date: 2019-04-18, end date: 2019-04-24, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor


# 77190803379568
Unscheduled inspection
Start date: 2019-04-01, end date: —, duration:
Authority:
Purpose of inspection:


# 77190803406818
Unscheduled inspection
Start date: 2019-04-26, end date: 2019-04-29, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor


# 77190803391732
Unscheduled inspection
Start date: 2019-04-08, end date: 2019-04-10, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor


# 77190803370050
Unscheduled inspection
Start date: 2019-03-12, end date: 2019-03-13, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used


# 77190803380472
Unscheduled inspection
Start date: 2019-03-22, end date: 2019-04-05, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used


# 77190803359038
Unscheduled inspection
Start date: 2019-03-04, end date: —, duration:
Authority:
Purpose of inspection:


# 77190803321809
Unscheduled inspection
Start date: 2019-02-11, end date: 2019-02-22, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the capital construction facility with the requirements of technical regulations and design documentation prevention detection and suppression of violations of technical regulations and design documentation committed by the audited person compliance of work and construction materials used during construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of design documentation, including energy efficiency requirements and equipment requirements of the capital construction facility with devices accounting for the energy resources used


# 77190803343688
Unscheduled inspection
Start date: 2019-02-22, end date: —, duration:
Authority:
Purpose of inspection:


# 77190803317672
Unscheduled inspection
Start date: 2019-01-22, end date: 2019-01-25, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor prevention detection and suppression of violations of technical regulations and project documentation committed by the person being checked


# 77190803317671
Unscheduled inspection
Start date: 2019-01-22, end date: —, duration:
Authority:
Purpose of inspection:


# 77190803321865
Unscheduled inspection
Start date: 2019-01-28, end date: —, duration:
Authority:
Purpose of inspection:


# 77180803308075
Unscheduled inspection
Start date: 2018-12-25, end date: 2019-01-14, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used


# 77180803296413
Unscheduled inspection
Start date: 2018-12-11, end date: 2018-12-24, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used


# 77180803226854
Unscheduled inspection
Start date: 2018-09-13, end date: 2018-09-14, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor


# 77180803225979
Unscheduled inspection
Start date: 2018-09-12, end date: —, duration:
Authority:
Purpose of inspection:


# 77180803235914
Unscheduled inspection
Start date: 2018-09-25, end date: 2018-10-22, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used


# 77180803228216
Unscheduled inspection
Start date: 2018-09-21, end date: —, duration:
Authority:
Purpose of inspection:


# 77180803198216
Unscheduled inspection
Start date: 2018-08-13, end date: —, duration:
Authority:
Purpose of inspection:


# 77180803181839
Unscheduled inspection
Start date: 2018-07-16, end date: 2018-08-09, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor


# 77180803179854
Unscheduled inspection
Start date: 2018-07-16, end date: 2018-07-18, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the instruction issued by Mosgosstroynadzor, compliance of the work and construction materials used in the construction process of the reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used


# 77180803187158
Unscheduled inspection
Start date: 2018-07-24, end date: 2018-07-27, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used


# 77180803155170
Unscheduled inspection
Start date: 2018-06-05, end date: 2018-06-07, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used, verification of the elimination of violations specified in the order issued by Mosgosstroynadzor


# 77180803157775
Unscheduled inspection
Start date: 2018-06-06, end date: 2018-07-03, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the requirements established by the legislation on urban planning activities within the framework of the subject of state construction supervision


# 77180803143535
Unscheduled inspection
Start date: 2018-05-18, end date: 2018-05-24, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the instruction issued by Mosgosstroynadzor, compliance of the work and construction materials used in the construction process of the reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used


# 77180803121365
Unscheduled inspection
Start date: 2018-04-10, end date: 2018-04-12, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the instruction issued by Mosgosstroynadzor, compliance of the work and construction materials used in the construction process of the reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used


# 77180803114435
Unscheduled inspection
Start date: 2018-04-05, end date: 2018-04-12, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used, verification of the elimination of violations specified in the order issued by Mosgosstroynadzor


# 77180803108027
Unscheduled inspection
Start date: 2018-03-21, end date: 2018-03-27, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the instruction issued by Mosgosstroynadzor, compliance of the work and construction materials used in the construction process of the reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used


# 77180803105277
Unscheduled inspection
Start date: 2018-03-21, end date: 2018-04-04, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor


# 77180803108039
Unscheduled inspection
Start date: 2018-03-26, end date: 2018-04-20, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor


# 77180803087009
Unscheduled inspection
Start date: 2018-02-16, end date: —, duration:
Authority:
Purpose of inspection: