# 742101215262
Unscheduled inspection
Start date: 2021-10-20, end date: —, duration: —
Authority: —
Purpose of inspection:
# 742100435562
Unscheduled inspection
Start date: 2021-08-30, end date: —, duration: —
Authority: —
Purpose of inspection:
# 742100383234
Unscheduled inspection
Start date: 2021-07-28, end date: —, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection:
# 742005246268
Unscheduled inspection
Start date: 2020-12-01, end date: 2020-12-28, duration: 20
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Verification of the completed facility 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 742005179714
Unscheduled inspection
Start date: 2020-10-19, end date: 2020-10-23, duration: 5
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work on the construction of intersections and junctions after completion of the work with measures to organize traffic safety and the construction materials used during the construction reconstruction of the capital construction facility, as well as the results of such work, with the requirements of the project documentation approved in accordance with Parts 15 152 and 153 of Article 48 of this Code, taking into account the changes made to the project documentation in accordance with parts 38 and 39 of Articles 49 of this Code and or the information model, if the formation and maintenance of an information model are mandatory in accordance with the requirements of this Code, including energy efficiency requirements, with the exception of capital construction facilities to which energy efficiency requirements do not apply and the requirements for equipping the capital construction facility with metering devices for used energy resources 2 The availability of a permit for construction 3 Meeting the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 742004484259
Unscheduled inspection
Start date: 2020-08-17, end date: 2020-08-21, duration: 5
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the construction of the pavement during the execution of the work with the construction of intersections and junctions during the execution of the work and the construction materials used during the construction reconstruction of the capital construction facility as well as the results of such work with the requirements of the project documentation approved in accordance with parts 15 152 and 153 of Article 48 of the Urban Planning Code, taking into account the changes made to the project documentation in in accordance with parts 38 and 39 of Article 49 of the Urban Planning Code and or the information model, if the formation and maintenance of the information model are mandatory in accordance with the requirements of the Urban Planning Code, including energy efficiency requirements, with the exception of capital construction facilities to which energy efficiency requirements do not apply and the requirements for equipping the capital construction facility with metering devices for used energy resources2 The presence of building permits3 Meeting the requirements of HH 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 742004462310
Unscheduled inspection
Start date: 2020-07-29, end date: 2020-08-04, duration: 5
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work on paving during the work and the construction materials used during the construction reconstruction of the capital construction facility as well as the results of such work with the requirements of the project documentation approved in accordance with Parts 15 152 and 153 of Article 48 of this Code, taking into account the changes made to the project documentation in accordance with parts 38 and 39 of Article 49 this Code and or the information model, if the formation and maintenance of the information model are mandatory in accordance with the requirements of this Code, including energy efficiency requirements, with the exception of capital construction facilities for which energy efficiency requirements do not apply and the requirements for equipping the capital construction facility with metering devices for used energy resources 2 The availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 742004432857
Unscheduled inspection
Start date: 2020-06-22, end date: —, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection:
# 742004411950
Unscheduled inspection
Start date: 2020-05-27, end date: 2020-06-02, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work on the construction of artificial structures of bypass roads during the work and the construction materials used during the construction reconstruction of the capital construction facility as well as the results of such work with the requirements of the project documentation approved in accordance with Parts 15 152 and 153 of Article 48 of this Code, taking into account the changes made to the project documentation in accordance with parts 38 and 39 of Article 49 of this Code and or an information model, if the formation and maintenance of an information model are mandatory in accordance with the requirements of this Code, including energy efficiency requirements, with the exception of capital construction facilities for which energy efficiency requirements do not apply and the requirements for equipping the capital construction facility with metering devices for energy resources used2 The availability of a construction permit 3 The implementation of requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 741802301725
Unscheduled inspection
Start date: 2018-12-19, end date: 2019-01-23, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Verification of the completed construction of the facility 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 741801936744
Unscheduled inspection
Start date: 2018-10-23, end date: 2018-10-29, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1The compliance of the work on testing the gas pipeline and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation 2 The availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 ct52 of the Urban Planning Code of the Russian Federation
# 741801635261
Unscheduled inspection
Start date: 2018-10-04, end date: 2018-10-10, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1The compliance of the work on the development of the trench and the laying of the pipe from the GRPSh 4 and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation 2 The availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 741800616822
Unscheduled inspection
Start date: 2018-08-17, end date: 2018-08-23, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1The compliance of the work on the development of the trench and the laying of the pipe from the GRPSh 3 and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation 2 The availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 74170802758393
Unscheduled inspection
Start date: 2017-10-27, end date: 2017-11-23, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Verification of the completed construction object2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 74170802757852
Unscheduled inspection
Start date: 2017-10-27, end date: —, duration: —
Authority: —
Purpose of inspection:
# 74170802754916
Unscheduled inspection
Start date: 2017-10-26, end date: —, duration: —
Authority: —
Purpose of inspection:
# 74170802582797
Unscheduled inspection
Start date: 2017-10-04, end date: 2017-10-10, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1The compliance of the work on the installation of PGB 1 GRPSh 3 4 5, the testing of the gas pipeline, the commissioning and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation2the need for a construction permit3compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 74170802453141
Unscheduled inspection
Start date: 2017-09-18, end date: 2017-09-22, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the construction of the roadbed of the upper and lower layers of pavement from hot dense fine-grained asphalt mixture from PK 0+00 to PK 12+00 and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation2 Availability of a construction permit 3 Compliance with the requirements of HR 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 74170802512923
Unscheduled inspection
Start date: 2017-09-29, end date: —, duration: —
Authority: —
Purpose of inspection:
# 74170701853918
Unscheduled inspection
Start date: 2017-08-08, end date: 2017-08-14, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the trench development, pipe laying, and construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 74170701907260
Unscheduled inspection
Start date: 2017-08-23, end date: —, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection:
# 74160701243481
Unscheduled inspection
Start date: 2016-12-21, end date: 2017-01-24, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Verification of the completed construction object2 Availability of a construction permit 3 Compliance with the requirements of hh 23 st52 of the Urban Planning Code of the Russian Federation
# 74160701077153
Unscheduled inspection
Start date: 2016-11-08, end date: —, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection:
# 74160701011808
Unscheduled inspection
Start date: 2016-10-24, end date: 2016-10-28, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the excavation work, installation of high-pressure low-pressure gas pipelines and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation2 Receipt of a construction permit3 Compliance with the requirements of hh 23 st52 of the Urban Planning Code of the Russian Federation
# 74160601767118
Unscheduled inspection
Start date: 2016-08-10, end date: —, duration: —
Authority: —
Purpose of inspection: