# 50170701660617
Unscheduled inspection
Start date: 2017-05-22, end date: 2017-06-19, duration: —
Authority: Glavnoe upravlenie gosudarstvennogo stroitelnogo nadzora Moskovskoi oblasti
Purpose of inspection: proverka ispolneniya predpisaniya ot 16022017 0213060424507
# 50160701291428
Unscheduled inspection
Start date: 2016-12-14, end date: —, duration: —
Authority: —
Purpose of inspection:
# 50160701291332
Unscheduled inspection
Start date: 2016-12-14, end date: 2016-12-20, duration: —
Authority: Glavnoe upravlenie gosudarstvennogo stroitelnogo nadzora Moskovskoi oblasti
Purpose of inspection: ispolnenie predpisaniya ot 171116 0213060424504
# 77160601801653
Unscheduled inspection
Start date: 2016-08-19, end date: 2016-08-25, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: the audit is carried out in order to ensure that the capital construction facility meets the requirements of technical regulations and design documentation on the basis of an approved verification program. The objectives of this audit are to prevent, identify and suppress violations of technical regulations and design documentation committed by the person being audited. The subject of this audit is the compliance of the work and construction materials used in the construction process of reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations design documentation, including requirements for energy efficiency and requirements for the equipment of the capital construction facility with metering devices for energy resources used