Found 73 inspections:

# 001802116815
Unscheduled inspection
Start date: 2018-11-15, end date: 2018-12-12, duration:
Authority: Glavnoe upravlenie MCHS Rossii po g Moskve
Purpose of inspection: Control regulations from 27062018 31.011


# 772100221944
Unscheduled inspection
Start date: 2021-05-14, end date: 2021-05-27, duration: 10
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: Objectives of the audit: elimination of violations specified in the order issued by Mosgosstroynadzor; Objectives of the audit: prevention, detection and suppression of violations of technical regulations and project documentation committed by the person being checked; Subject of the audit: verification of elimination of violations specified in the order issued by Mosgosstroynadzor


# 772100213566
Unscheduled inspection
Start date: 2021-05-14, end date: 2021-05-27, duration: 10
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: Objectives of the audit: elimination of violations specified in the order issued by Mosgosstroynadzor; Objectives of the audit: prevention, detection and suppression of violations of technical regulations and project documentation committed by the person being checked; Subject of the audit: verification of elimination of violations specified in the order issued by Mosgosstroynadzor


# 772100213587
Unscheduled inspection
Start date: 2021-05-14, end date: 2021-05-27, duration: 10
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: Objectives of the audit: elimination of violations specified in the order issued by Mosgosstroynadzor; Objectives of the audit: prevention, detection and suppression of violations of technical regulations and project documentation committed by the person being checked; Subject of the audit: verification of elimination of violations specified in the order issued by Mosgosstroynadzor


# 772005257949
Unscheduled inspection
Start date: 2020-12-02, end date: —, duration:
Authority:
Purpose of inspection:


# 772004378530
Unscheduled inspection
Start date: 2020-03-26, end date: 2020-03-26, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit are to carry out control measures in connection with the implementation of the verification program verification tasks prevention identification and suppression of violations of the requirements of the design documentation of the legislation on urban planning activity by the audited person, the subject of verification is the fulfillment by the person carrying out the construction of the requirements of part 3 of Article 52 of the Urban Planning Code compliance with the performance of works and construction materials used in the construction process of reconstruction of the capital construction facility as well as the results of such works with the requirements of design documentation, including the requirements of energy efficiency and the requirements of equipment of the capital construction facility with metering devices for energy resources used


# 772004280241
Unscheduled inspection
Start date: 2020-02-26, end date: —, duration:
Authority:
Purpose of inspection:


# 771903731747
Unscheduled inspection
Start date: 2019-10-01, end date: 2019-10-04, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The purpose of the audit is to carry out control measures in connection with the implementation of the verification program verification tasks prevention identification and suppression of violations of the requirements of the design documentation of the legislation on urban development activity by the audited person. The purpose of the audit is to verify the compliance of the work and the construction materials used during the construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of the design documentation, including energy efficiency requirements and requirements for the equipment of the capital construction facility with metering devices for used energy resources


# 771903807605
Unscheduled inspection
Start date: 2019-10-03, end date: 2019-10-07, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit are to carry out control measures in connection with the verification of compliance with the prescriptionthe tasks of the audit are to prevent the identification and suppression of violations of the requirements of the design documentation of the legislation on urban development by the person being audited, the subject of the audit is to verify the elimination of violations specified in the prescription issued by the Moscow City Construction Supervision Committee until 27092019


# 771903847533
Unscheduled inspection
Start date: 2019-10-09, end date: —, duration:
Authority:
Purpose of inspection:


# 771903865270
Unscheduled inspection
Start date: 2019-10-14, end date: 2019-11-08, duration:
Authority: Glavnoe upravlenie MCHS Rossii po g Moskve
Purpose of inspection: control of previously issued dated 12122018 672


# 77190803475461
Unscheduled inspection
Start date: 2019-08-07, end date: 2019-08-09, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor


# 77190803461368
Unscheduled inspection
Start date: 2019-07-19, end date: —, duration:
Authority:
Purpose of inspection:


# 77190803467757
Unscheduled inspection
Start date: 2019-07-26, end date: 2019-07-26, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor


# 77190803432034
Unscheduled inspection
Start date: 2019-06-06, end date: —, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection:


# 77190803434581
Unscheduled inspection
Start date: 2019-06-07, end date: —, duration:
Authority:
Purpose of inspection:


# 77190803417988
Unscheduled inspection
Start date: 2019-05-17, end date: —, duration:
Authority:
Purpose of inspection:


# 77190803419748
Unscheduled inspection
Start date: 2019-05-21, end date: 2019-05-24, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor


# 77190803404527
Unscheduled inspection
Start date: 2019-04-23, end date: 2019-04-25, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor


# 77190803377306
Unscheduled inspection
Start date: 2019-03-20, end date: 2019-03-20, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor


# 77190803378572
Unscheduled inspection
Start date: 2019-03-26, end date: 2019-03-29, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used, fulfillment by the person carrying out the construction requirements of part 3 of Article 52 of the Urban Planning Code


# 77190803366568
Unscheduled inspection
Start date: 2019-03-07, end date: —, duration:
Authority:
Purpose of inspection:


# 77190803328849
Unscheduled inspection
Start date: 2019-02-07, end date: 2019-02-08, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor


# 77190803347006
Unscheduled inspection
Start date: 2019-02-26, end date: 2019-02-28, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used


# 77190803313970
Unscheduled inspection
Start date: 2019-01-16, end date: —, duration:
Authority:
Purpose of inspection:


# 77190803320256
Unscheduled inspection
Start date: 2019-01-29, end date: 2019-01-29, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used


# 77180803296980
Unscheduled inspection
Start date: 2018-12-13, end date: 2018-12-18, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used


# 77180803268748
Unscheduled inspection
Start date: 2018-11-01, end date: 2018-11-06, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor


# 77180803271972
Unscheduled inspection
Start date: 2018-11-07, end date: —, duration:
Authority:
Purpose of inspection:


# 77180803289189
Unscheduled inspection
Start date: 2018-11-30, end date: 2018-11-30, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used


# 001802117037
Unscheduled inspection
Start date: 2018-11-15, end date: 2018-12-12, duration:
Authority: Glavnoe upravlenie MCHS Rossii po g Moskve
Purpose of inspection: control regulations from 07022018 1311


# 001802116815
Unscheduled inspection
Start date: 2018-11-15, end date: 2018-12-12, duration:
Authority: Glavnoe upravlenie MCHS Rossii po g Moskve
Purpose of inspection: Control regulations from 27062018 31.011


# 77180803274482
Unscheduled inspection
Start date: 2018-11-15, end date: —, duration:
Authority:
Purpose of inspection:


# 77180803251620
Unscheduled inspection
Start date: 2018-10-15, end date: 2018-10-15, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used


# 77180803229649
Unscheduled inspection
Start date: 2018-09-14, end date: 2018-09-17, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor


# 77180803223898
Unscheduled inspection
Start date: 2018-09-11, end date: 2018-09-14, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor


# 77180803194488
Unscheduled inspection
Start date: 2018-08-06, end date: —, duration:
Authority:
Purpose of inspection:


# 77180803163905
Unscheduled inspection
Start date: 2018-06-18, end date: 2018-06-22, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor


# 77180803148210
Unscheduled inspection
Start date: 2018-06-18, end date: 2018-06-22, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used


# 77180803159875
Unscheduled inspection
Start date: 2018-06-13, end date: 2018-06-15, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor


# 771800423003
Unscheduled inspection
Start date: 2018-06-14, end date: 2018-07-11, duration:
Authority: Glavnoe upravlenie MCHS Rossii po g Moskve
Purpose of inspection: Carrying out, in accordance with the procedure established by the legislation of the Russian Federation, verification of compliance with fire safety requirements at the protection facility established by federal laws and other regulatory legal acts of the Russian Federation adopted in accordance with them and taking measures based on the results of the audit


# 77180803167724
Unscheduled inspection
Start date: 2018-06-21, end date: 2018-06-28, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used


# 77180803127710
Unscheduled inspection
Start date: 2018-04-23, end date: 2018-05-07, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used


# 77180803130639
Unscheduled inspection
Start date: 2018-04-25, end date: 2018-05-10, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor


# 77180803114775
Unscheduled inspection
Start date: 2018-04-03, end date: 2018-04-11, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used


# 77180803103839
Unscheduled inspection
Start date: 2018-03-20, end date: —, duration:
Authority:
Purpose of inspection:


# 771800226449
Unscheduled inspection
Start date: 2018-03-22, end date: 2018-04-18, duration:
Authority: Gosudarstvennaya inspekciya truda v gorode Moskve
Purpose of inspection: The inspection is carried out for the purpose of federal state supervision over compliance with the requirements of labor legislation and other regulatory legal acts containing labor law norms on the basis of a reasoned submission dated 20032/2018 from the State Labor inspector of the State Labor Inspectorate in Moscow, SP Yagodinets


# 77180803089516
Unscheduled inspection
Start date: 2018-02-27, end date: 2018-02-28, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor


# 77180803081912
Unscheduled inspection
Start date: 2018-02-06, end date: 2018-02-06, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor


# 77180803077092
Unscheduled inspection
Start date: 2018-02-06, end date: 2018-02-06, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor


# 77170802905585
Unscheduled inspection
Start date: 2017-11-28, end date: —, duration:
Authority:
Purpose of inspection:


# 77170802905084
Unscheduled inspection
Start date: 2017-11-29, end date: —, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection:


# 77170802869838
Unscheduled inspection
Start date: 2017-11-17, end date: —, duration:
Authority:
Purpose of inspection:


# 77170802768064
Unscheduled inspection
Start date: 2017-10-23, end date: —, duration:
Authority:
Purpose of inspection:


# 77170802866860
Unscheduled inspection
Start date: 2017-10-17, end date: —, duration:
Authority:
Purpose of inspection:


# 77170802547699
Unscheduled inspection
Start date: 2017-09-19, end date: 2017-09-22, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used


# 77170701889595
Unscheduled inspection
Start date: 2017-08-17, end date: 2017-09-05, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used, verification of the elimination of violations specified in the order issued by Mosgosstroynadzor


# 77170701866779
Unscheduled inspection
Start date: 2017-08-08, end date: 2017-08-15, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used


# 77170701828300
Unscheduled inspection
Start date: 2017-07-19, end date: 2017-07-21, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor


# 77170701784851
Unscheduled inspection
Start date: 2017-07-07, end date: —, duration:
Authority:
Purpose of inspection:


# 77170701603349
Unscheduled inspection
Start date: 2017-05-05, end date: —, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection:


# 77170701589226
Unscheduled inspection
Start date: 2017-05-03, end date: —, duration:
Authority:
Purpose of inspection:


# 77170701531196
Unscheduled inspection
Start date: 2017-04-13, end date: —, duration:
Authority:
Purpose of inspection:


# 77170701469884
Unscheduled inspection
Start date: 2017-03-17, end date: 2017-03-31, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used, verification of the elimination of violations specified in the order issued by Mosgosstroynadzor


# 77170701397474
Unscheduled inspection
Start date: 2017-02-16, end date: —, duration:
Authority:
Purpose of inspection:


# 77170701372267
Unscheduled inspection
Start date: 2017-02-14, end date: —, duration:
Authority:
Purpose of inspection:


# 77170701416867
Unscheduled inspection
Start date: 2017-02-28, end date: 2017-03-01, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor


# 77160701227812
Unscheduled inspection
Start date: 2016-12-21, end date: 2016-12-23, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor


# 77160701048354
Unscheduled inspection
Start date: 2016-10-28, end date: —, duration:
Authority:
Purpose of inspection:


# 77160701044120
Unscheduled inspection
Start date: 2016-10-27, end date: 2016-11-01, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of this audit are to eliminate violations specified in the order issued by Mosgosstroynadzor based on the expiration of the deadline for the execution by a legal entity, an individual entrepreneur, of an order issued by the state construction supervision authority to eliminate an identified violation of mandatory requirements. The objectives of this audit are to prevent identify and suppress violations of technical regulations and project documentation committed by the person being audited. The purpose of this audit is to verify the elimination of violations specified in the order issued by Mosgosstroynadzor 9616p from 02092016


# 77160700088477
Unscheduled inspection
Start date: 2016-08-26, end date: —, duration:
Authority:
Purpose of inspection:


# 77160601696637
Unscheduled inspection
Start date: 2016-07-01, end date: 2016-07-04, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: elimination of violations specified in the order issued by Mosgosstroynadzor


# 77160601735357
Unscheduled inspection
Start date: 2016-07-22, end date: 2016-07-26, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: To establish that this inspection is carried out in order to eliminate violations specified in the order issued by Mosgosstroynadzor on the basis of the expiration of the deadline for the execution by a legal entity, an individual entrepreneur, of an order issued by the state construction supervision authority to eliminate violations of mandatory requirements. The objectives of this inspection are to prevent identify and suppress violations of technical regulations and design documentation committed by the person being audited. The subject of this inspection is to verify the elimination of violations specified in the order issued by Mosgosstroynadzor 652516 dated 21062016


Information about inspections