Found 100 inspections:

# 002005234256
Unscheduled inspection
Start date: 2020-10-16, end date: —, duration:
Authority: Privolzhskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection:


# 002004490350
Unscheduled inspection
Start date: 2020-08-24, end date: —, duration:
Authority: Centralnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection:


# 002004484621
Unscheduled inspection
Start date: 2020-08-25, end date: —, duration:
Authority: Centralnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection:


# 002004419406
Unscheduled inspection
Start date: 2020-06-01, end date: —, duration:
Authority: Privolzhskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection:


# 002004420272
Unscheduled inspection
Start date: 2020-05-21, end date: 2020-05-29, duration: 7
Authority: Centralnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: the real test is conducted in accordance with the notice of JSC "Transneftemash Volga" on the completion of reconstruction of capital construction object from 15042020 ТВВГ180419062 Rin 21017394 from 16042020 to control the compliance of the work performed with the mandatory requirements of the project documentation requirements on energy saving and increase of energy efficiency and other normative legal acts in the construction, reconstruction of capital construction object "OTP "of Horinouchi" inv 2411 mnpp "Nevirapine" inv 2402 PPP "second" Camera start taking SOD Dn500 Reconstruction" located at Vladimir region, Gorokhovetskiy rayon vyaznikovskiy rayon kovrovskiy rayon sudogodskiy rayon Kameshkovskiy rayon Guskhrustalny rajasuda of this review is to prevent detection and suppression approved developer technical customer and the person in charge of the construction on the basis of the contract with the developer or technical customer violations of the legislation on town-planning activities including project documentation requirements on energy saving and improving energy effektivnostpukola present validation of yavlyaetsyasredstvom works and construction materials used in the construction process of reconstruction of capital construction object and the results of such work requirements approved in accordance with paragraphs 152 and 153 of 15 of article 48 of the present town planning code of the project documentation to reflect changes made in the project documentation in accordance with paragraphs 38 and 39 of article 49 of this Code or information model including the energy efficiency standards with the exception of capital construction objects, for which the energy performance requirements shall not apply and the requirements of the equipment of a capital construction object metering devices of energy resources used


# 002004272389
Unscheduled inspection
Start date: 2020-02-10, end date: 2020-02-21, duration:
Authority: Privolzhskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: implementation of the previously issued regulation 43232019208 dated 24/122019 implementation of Article 52 of parts 5 and 6 of the Urban Planning Code of the Russian Federation notification of the elimination of violations bx 290715 dated 24012020 ex TSD051207091887 dated 24012020the tasks of this audit are to monitor the implementation of the previously issued prescription7 The subject of this audit is the fulfillment of the instruction issued by the state construction supervision authority on the elimination of identified violations of mandatory requirements


# 002004275689
Unscheduled inspection
Start date: 2020-02-11, end date: —, duration:
Authority: Priokskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection:


# 002004260462
Unscheduled inspection
Start date: 2020-01-31, end date: 2020-02-07, duration:
Authority: Privolzhskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: execution of the inspection program case number 15812020 dated 24012020 application to the Volga Administration of Rostechnadzor notice of completion of the capital construction facility "Replacement of the Surgut Polotsk DN 1000 190782 190849 km Reconstruction site" LLC "TRANSNEFTSD" ex TSD051207091619 dated 22012020 ex 2901209 dated 28012020the tasks of this inspection are the prevention identification and suppression of violations committed by the developer, the technical customer, as well as persons carrying out construction on the basis of a contract with a developer or a technical customer for violations of urban planning legislation, including technical regulations and project documentation7 The subject of this audit is the compliance of the work performed and the building materials used during the construction of the reconstruction of the capital construction facility, as well as the results of such work with the requirements of technical regulations, project documentation, including energy efficiency requirements and equipment requirements of the capital construction facility construction with metering devices for energy resources used, the need for a construction permit to comply with the requirements of Parts 2 3 and 3_1 of Article 52 of the Urban Planning Code of the Russian Federation


# 002004256232
Unscheduled inspection
Start date: 2020-01-20, end date: —, duration:
Authority: Privolzhskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection:


# 001903992502
Unscheduled inspection
Start date: 2019-11-20, end date: 2019-12-03, duration:
Authority: Centralnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: this inspection is carried out in accordance with the notice of completion of construction reconstruction of the capital construction facility in order to control the compliance of the completed works with the mandatory requirements of the design documentation requirements for energy conservation and energy efficiency improvement and other regulatory legal acts during the construction of the capital construction facility the task of this inspection is to prevent identify and suppress the mistakes made by the developer the technical customer as well as the person carrying out construction on the basis of an agreement with a developer or a technical customer for violations of legislation on urban planning activities, including design documentation requirements for energy conservation and energy efficiency improvement, the subject of this audit is the compliance of the work and construction materials used in the construction process of reconstruction of a capital construction facility as well as the results of such work with the requirements approved in accordance with parts 15 152 and 153 of Article 48 of this Urban Planning Code project documentation, taking into account the changes made to the project documentation in accordance with parts 38 and 39 of Article 49 of this Code and or the information model, including energy efficiency requirements, with the exception of capital construction projects for which energy efficiency requirements do not apply and the requirements for equipping the capital construction facility with metering devices for energy resources used


# 001903806378
Unscheduled inspection
Start date: 2019-10-07, end date: —, duration:
Authority:
Purpose of inspection:


# 001903183343
Unscheduled inspection
Start date: 2019-09-13, end date: 2019-10-10, duration:
Authority: Privolzhskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: implementation of the previously issued regulation 43232019144048 dated 14052019 implementation of Article 52 of parts 5 and 6 of the Urban Planning Code of the Russian Federation notification of the elimination of violations bx 34589c dated 01072019 ex TSD0512070920278 dated 29062019the objectives of this audit are to prevent identify and suppress violations of legislation on urban planning activities committed by the developer, the technical customer, as well as persons carrying out construction on the basis of a contract with the developer or the technical customer in including technical regulations and project documentation7 The subject of this audit is the compliance of the work performed and the building materials used during the construction of the reconstruction of the capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation, including the requirements for energy efficiency and the requirements for equipping the capital construction facility with metering devices for energy resources used, the need for a construction permit to comply with the requirements of Parts 2 3 and 3_1 Article 52 of the Urban Planning Code of the Russian Federation


# 001902855436
Unscheduled inspection
Start date: 2019-07-08, end date: 2019-07-19, duration:
Authority: Priokskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: The purpose of this audit is to verify that the legal entity has eliminated the violations identified in paragraphs 115 of the previously issued regulation dated 07062019 PR1019THE purpose of this audit is for the legal entity to comply with paragraphs 115 of the previously issued regulation dated 07062019 Pr1019


# 001902490084
Unscheduled inspection
Start date: 2019-02-04, end date: 2019-02-11, duration:
Authority: VolzhskoOkskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: verification of information about the threat of harm to the life and health of citizens


# 001902428645
Unscheduled inspection
Start date: 2019-01-14, end date: —, duration:
Authority: Federalnaya sluzhba po akkreditacii
Purpose of inspection:


# 001802056949
Unscheduled inspection
Start date: 2018-11-26, end date: 2018-11-30, duration:
Authority: ZapadnoUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: this inspection is carried out in order to evaluate the work performed and decide whether to issue an opinion on the compliance of the constructed capital construction facility or to refuse to issue such an opinion on the basis of the order of the West Ural Office of Rostechnadzor dated 24.012018 76pr the objectives of this inspection are to prevent identify and suppress violations committed by the developer or the technical customer, as well as by the person carrying out construction on the basis of a contract with the developer or by the technical customer of violations of the legislation on urban planning activities, including technical regulations and design documentation, the subject of this audit is to verify the compliance of the work performed and the building materials used during the construction of the reconstruction of the capital construction facility, as well as the results of such work with the requirements of technical regulations of the project documentation, including energy efficiency requirements and the requirements for equipping the capital construction facility with metering devices used energy resources


# 001800584623
Unscheduled inspection
Start date: 2018-07-30, end date: 2018-07-31, duration:
Authority: Regionalnaya sluzhba po tarifam Nizhegorodskoi oblasti
Purpose of inspection: This audit is conducted in order to monitor the implementation by JSC Transneft Verkhnyaya Volga of Regulation No. 1 on the elimination of identified violations issued as a result of a scheduled documentary audit on June 29, 2018. The objectives of this audit are to monitor the implementation by JSC Transneft Verkhnyaya Volga of Regulation No. 1 on the elimination of identified violations issued as a result of an unscheduled documentary audit on June 29, 2018. June 2018 The subject of the audit is the fulfillment of the instructions of the state control bodies supervision of municipal control bodies


# 001800074077
Unscheduled inspection
Start date: 2018-02-19, end date: 2018-03-21, duration:
Authority: Privolzhskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: The objectives of this audit are to prevent identify and suppress violations of legislation on urban development, including technical regulations and project documentation, committed by the developer, the technical customer, as well as by persons carrying out construction on the basis of a contract with the developer or the technical customer, including technical regulations and project documentation. The subject of this audit is the compliance of the work and the construction materials used during the construction of the reconstruction of the capital construction facility, as well as the results of such work, the requirements of the technical regulations of the project documentation, including the requirements for energy efficiency and the requirements for equipping the capital construction facility with metering devices for energy resources used, the availability of a construction permit, compliance with the requirements of Parts 2 3 and 3_1 of Article 52 of the Urban Planning Code of the Russian Federation


# 001800074172
Unscheduled inspection
Start date: 2018-02-22, end date: 2018-03-26, duration:
Authority: Privolzhskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: To establish that this audit is being conducted in order to implement the audit program of Case 11842016 dated 14112016 with amendments to the program dated 29122017 1576P. The objectives of this audit are to prevent identify and suppress violations of legislation on urban development, including technical regulations and project documentation, committed by the developer, the technical customer, as well as by persons carrying out construction on the basis of a contract with the developer or the technical customer The subject of this audit is the compliance of the work performed and the building materials used during the construction of the reconstruction of the capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used, the availability of a construction permit, compliance with the requirements of Parts 2 3 and 3_1 of Article 52 of the Urban Planning Code In the Russian Federation, the audit period is 20 working days. The audit will begin on February 21, 2018. The audit will be completed no later than March 23, 2018.


# 001800047674
Unscheduled inspection
Start date: 2018-02-01, end date: 2018-03-01, duration:
Authority: Privolzhskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: the purpose of the execution of the audit program of case 133292018 dated 12012018 The objectives of this audit are to prevent identify and suppress violations of urban planning legislation committed by the developer, the technical customer, as well as by persons carrying out construction on the basis of a contract with the developer or the technical customer, including technical regulations and project documentation 7 The subject of this audit is the compliance of the work and the construction materials used in the construction process, reconstruction of the capital construction facility, as well as the results of such work, meet the requirements of technical regulations and project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for used energy resources.


# 00170803010888
Unscheduled inspection
Start date: 2017-12-04, end date: 2017-12-08, duration:
Authority: VolzhskoOkskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: monitoring the compliance of completed construction works with the mandatory requirements of technical regulations, norms and rules of project documentation during the reconstruction of the capital construction facility "Reconstruction of the main pipeline system to increase the volume of transportation of petroleum products to the Moscow region of the Starolikeevo LPS Reconstruction Stage 2" at the address Nizhny Novgorod region Kstovsky ron in the area of Bolshoe Mokroye the objectives of this audit are to prevent identify and suppress by the developer, the technical customer , as well as by the person carrying out construction on the basis of a contract with the developer or the technical customer for violations of legislation on urban development, including technical regulations and project documentation


# 00170803009527
Unscheduled inspection
Start date: 2017-12-14, end date: 2017-12-20, duration:
Authority: Priokskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: this inspection is conducted in order to verify the completed work on the reconstruction of the capital construction facility "Reconstruction of the main pipeline system to increase the volume of transportation of petroleum products to the Moscow region GPS "Shilovo3 Construction" in accordance with the notice dated December 04, 2017 TVVA400272048 on the completion of construction reconstruction of capital repairs the objectives of this inspection are the prevention, detection and suppression of violations of legislation on urban development in including technical regulations and project documentation7 The subject of this audit is to verify the constructed facility in accordance with the requirements of Art 51 of parts 2 and 3 of Art 52 of Art 53 of the Urban Planning Code of the Russian Federation for Electrical Safety Civil and Emergency Situations fire safety environmental protection sanitary and epidemiological norms of labor legislation for compliance of the work performed and the construction materials used during the construction of the capital construction facility as well as the results of such work, the requirements of technical regulations, project documentation, and other regulatory legal acts, including energy efficiency requirements and requirements for equipping a capital construction facility with metering devices for energy resources used, and the availability of a construction permit.


# 00170803010501
Unscheduled inspection
Start date: 2017-12-15, end date: —, duration:
Authority: Priokskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This inspection is carried out in order to monitor the compliance of the completed works with the mandatory requirements of technical regulations and other regulatory legal acts of the project documentation with the requirements for energy conservation and energy efficiency improvement during the reconstruction of the capital construction facility "RiazanTulaOrel MNPP Telemechanization System" KP 919 Reconstruction site" based on the notice of completion of the reconstruction of the capital construction facility dated 17112017 bn vh dated 06122017 174168 The objectives of this audit are to prevent identify and suppress violations of legislation on urban development, including technical regulations of project documentation, committed by the developer, the customer, as well as by the person carrying out construction on the basis of a contract with the developer, the customer. The subject of this audit is to verify the construction of the facility in accordance with the requirements of art. 51 parts 2 and 3 of art. 52 art. 53 54 of the Urban Planning Code of the Russian Federation The Federation of Electrical Safety Civil Defense and Emergency Situations, Fire Safety, environmental Protection, sanitary and epidemiological standards of labor legislation for compliance of the work performed and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of technical regulations, project documentation, other regulatory legal acts, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used. building permits


# 00170803010591
Unscheduled inspection
Start date: 2017-12-15, end date: —, duration:
Authority: Priokskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This inspection is carried out in order to monitor the compliance of the completed works with the mandatory requirements of technical regulations and other regulatory legal acts of the project documentation with the requirements for energy conservation and energy efficiency improvement during the reconstruction of the capital construction facility "RiazanTulaOrel MNPP Telemechanization System" KP 2026 Reconstruction site" based on the notice of completion of the reconstruction of the capital construction facility dated 17112017 bn vh dated 06122017 174168 The objectives of this audit are to prevent identify and suppress violations of legislation on urban development, including technical regulations of project documentation, committed by the developer, the customer, as well as by the person carrying out construction on the basis of a contract with the developer, the customer. The subject of this audit is to verify the construction of the facility in accordance with the requirements of art. 51 parts 2 and 3 of art. 52 art. 53 54 of the Urban Planning Code of the Russian Federation The Federation of Electrical Safety Civil Defense and Emergency Situations, Fire Safety, environmental Protection, sanitary and epidemiological standards of labor legislation for compliance of the work performed and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of technical regulations, project documentation, other regulatory legal acts, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used. building permits


# 00170802986302
Unscheduled inspection
Start date: 2017-12-12, end date: —, duration:
Authority: Priokskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: this audit is conducted in order to monitor the implementation of paragraphs 117 of the regulation dated 15112017 5575S2017 the objectives of this audit are to verify that the legal entity has eliminated the violations set out in paragraphs 117 of the regulation dated 15112017 5575S2017 The subject of this audit is the implementation by the legal entity of paragraphs 117 of the regulation dated 15112017 5575S2017 of the Prioksky Department of Rostechnadzor


# 00170802986206
Unscheduled inspection
Start date: 2017-12-12, end date: —, duration:
Authority: Priokskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This audit is conducted in order to monitor the implementation of paragraphs 230 of the regulation dated 15112017 5475S2017. The objectives of this audit are to verify that the legal entity has eliminated the violations set out in paragraphs 230 of the regulation dated 15112017 5475S2017. The subject of this audit is the implementation by the legal entity of paragraphs 230 of the regulation dated 15112017 5475S2017 of the Prioksky Department of Rostechnadzor


# 00170802915502
Unscheduled inspection
Start date: 2017-11-27, end date: 2017-12-08, duration:
Authority: Privolzhskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: purpose verification of the previously issued regulation 4323085 dated 18102017the task is to control the execution of the previously issued prescriptionthe subject of verification is the fulfillment of the instruction issued by the state construction supervision authority on the elimination of identified violations of mandatory requirements


# 00170802767976
Unscheduled inspection
Start date: 2017-10-02, end date: 2017-10-06, duration:
Authority: VolzhskoOkskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: monitoring of the fulfillment by a legal entity of paragraphs pp110 of the previously issued instruction dated July 22, 2017 PR173416P23 of the Volga Federal District Administration of Rostechnadzor on the elimination of identified violations of mandatory requirements The objectives of this audit are to prevent identify and suppress violations of legislation on urban development by the developer, the technical customer, as well as the person carrying out construction on the basis of a contract with the developer or the technical customer, including technical regulations and project documentation. The purpose of this check is to comply with the instructions of the state control body.


# 00170802602325
Unscheduled inspection
Start date: 2017-10-02, end date: 2017-10-02, duration:
Authority: Departament lesnogo hozyaistva Nizhegorodskoi oblasti
Purpose of inspection: execution of regulation 5 of 27042017


# 00170802798257
Unscheduled inspection
Start date: 2017-10-16, end date: —, duration:
Authority: VolzhskoOkskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection:


# 00170802835446
Unscheduled inspection
Start date: 2017-10-30, end date: 2017-11-03, duration:
Authority: Priokskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: this inspection is carried out in order to verify the completed work on the reconstruction of the capital construction facility "MNPP "RyazanTulaOrel" Dn500 MNPP "NovkiRyazan" Dn500 Reconstruction of the Ryazan LPDS "First stage" in accordance with the notice dated October 18, 2017 TVVA400261386 on the completion of construction reconstruction of capital repairs the objectives of this inspection are the prevention detection and suppression of violations of legislation on urban development including technical regulations and project documentation7 The subject of this audit is to verify the reconstruction of the facility in accordance with the requirements of Art 51 of parts 2 and 3 of Art 52 of Art 53 54 of the Urban Planning Code of the Russian Federation for Electrical Safety Civil Defense and Emergency Situations fire safety environmental protection sanitary and epidemiological standards of labor legislation for compliance of the work performed and the construction materials used during the construction of the capital construction facility construction as well as the results of such work, the requirements of technical regulations, project documentation, and other regulatory legal acts, including energy efficiency requirements and requirements for equipping a capital construction facility with metering devices for energy resources used, and the availability of a construction permit


# 00170802713280
Unscheduled inspection
Start date: 2017-09-25, end date: —, duration:
Authority: VolzhskoOkskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection:


# 00170802016260
Unscheduled inspection
Start date: 2017-08-18, end date: 2017-08-31, duration:
Authority: Centralnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: compliance of the performed works with the mandatory requirements of technical regulations, norms and rules of project documentation, requirements for energy conservation and energy efficiency improvement and other regulatory legal acts during the reconstruction of a capital construction facility


# 00170701853674
Unscheduled inspection
Start date: 2017-08-14, end date: 2017-08-14, duration:
Authority: Departament lesnogo hozyaistva Nizhegorodskoi oblasti
Purpose of inspection: execution of regulation 5 of 27042017


# 00170701900456
Unscheduled inspection
Start date: 2017-08-09, end date: 2017-09-05, duration:
Authority: Privolzhskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: verification of compliance with the instruction of the Volga Administration of Rostechnadzor dated 21072017 43092017264 based on an appeal to the Volga Administration of Rostechnadzor notification of elimination of violations of bx 31927c dated 26072017 pursuant to the order of the head of the Volga Administration of Rostechnadzor dated 06062016 647P dated 11072017 999P dated 11072017 994P regarding the implementation of state construction supervision


# 00170802296441
Unscheduled inspection
Start date: 2017-08-28, end date: 2017-08-30, duration:
Authority: VolzhskoOkskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: in order to monitor the fulfillment by a legal entity of paragraphs pp19 of the previously issued instruction dated February 10, 2017 pr7817P23 of the Volzhskok Administration of Rostechnadzor on the elimination of identified violations of mandatory requirements, the objectives of this audit are to prevent identify and suppress violations of urban planning legislation committed by the developer, the technical customer, as well as the person carrying out construction on the basis of a contract with the developer or the technical customer, including technical regulations The subject of this audit is the fulfillment of the points of the regulation dated February 10, 2017 PR7817P23 of the state control and supervision authority.


# 00170801977041
Unscheduled inspection
Start date: 2017-08-29, end date: 2017-09-11, duration:
Authority: Privolzhskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: verification of compliance with the regulation dated 19062017 43092017193 on the basis of an application to the Privolzhsky Administration of Rostechnadzor notification of the elimination of violations


# 00170802016248
Unscheduled inspection
Start date: 2017-07-26, end date: 2017-07-31, duration:
Authority: Centralnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: compliance of the performed works with the mandatory requirements of technical regulations norms and rules of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for used energy resources and other regulatory legal acts


# 00170701701758
Unscheduled inspection
Start date: 2017-06-01, end date: 2017-06-05, duration:
Authority: VolzhskoOkskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: monitoring of compliance of completed construction works with the mandatory requirements of technical regulations, norms and rules of project documentation during the reconstruction of the capital construction facility "Reconstruction of the main pipeline system to increase the volume of transportation of petroleum products to the Moscow region of the Starolikeevo Reconstruction LPDS" at the address Nizhny Novgorod region, Kstovsky district in the area of Bolshoe Mokroye, the objectives of this audit are to prevent identify and suppress technical violations committed by the developer the customer as well as the person carrying out construction on the basis of a contract with the developer or a technical customer for violations of legislation on urban planning activities, including technical regulations and project documentation, the subject of this audit is the compliance of the work performed and the building materials used during the construction of the reconstruction of the capital construction facility, as well as the results of such work with the requirements of technical regulations and project documentation and the availability of a construction permit


# 00170701680426
Unscheduled inspection
Start date: 2017-05-29, end date: —, duration:
Authority: Priokskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection:


# 00170701625833
Unscheduled inspection
Start date: 2017-05-22, end date: 2017-05-26, duration:
Authority: Privolzhskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: monitoring the implementation of paragraphs 13 of regulation 431714615714396 of 26042016


# 00170701528867
Unscheduled inspection
Start date: 2017-04-13, end date: —, duration:
Authority:
Purpose of inspection:


# 00170701571027
Unscheduled inspection
Start date: 2017-03-14, end date: —, duration:
Authority: VolzhskoOkskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This audit is conducted in order to monitor the fulfillment by a legal entity of paragraphs pp110 of the previously issued order of the Volga Region Department of Rostechnadzor dated November 18, 2016 pr299316P23 on the elimination of identified violations of mandatory requirements the objectives of this audit are to prevent identify and suppress violations of legislation on urban development activities committed by the developer, the technical customer, as well as the person carrying out construction on the basis of a contract with the developer or the technical customer. including technical regulations and project documentation, the subject of this audit is the implementation of pp110, previously issued by the Volzhskoksky Administration of Rostechnadzor dated November 18, 2016, pr299316P23 of the state control and supervision body


# 00170701512349
Unscheduled inspection
Start date: 2017-03-13, end date: —, duration:
Authority: VolzhskoOkskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection:


# 00170701447726
Unscheduled inspection
Start date: 2017-02-16, end date: 2017-03-20, duration:
Authority: Privolzhskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: implementation of the inspection program in accordance with the order of the Head of the Volga Region Department of Rostechnadzor dated 14112016 1475P regarding the implementation of state construction supervision


# 00170701473023
Unscheduled inspection
Start date: 2017-02-09, end date: —, duration:
Authority: VolzhskoOkskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection:


# 00170701419055
Unscheduled inspection
Start date: 2017-02-27, end date: 2017-03-17, duration:
Authority: Federalnaya sluzhba po akkreditacii
Purpose of inspection: The audit is conducted in order to verify the notification of the elimination of inconsistencies with the accreditation criteria submitted by letter dated 03022017 TVVA53066098 incoming Rosaccreditation dated 14022017 4548the objectives of this audit are to establish the fact that an accredited person has eliminated inconsistencies in his activities with the requirements of the legislation of the Russian Federation for the activities of accredited persons indicated in the Notification of the transmission of a list of inconsistencies with the accreditation criteria based on the results of the provision of public services for the confirmation of competence dated 26122016 4233503appredited compliance with mandatory requirements or requirements established by municipal legal acts


# 00170701435351
Unscheduled inspection
Start date: 2017-01-19, end date: 2017-01-19, duration:
Authority: Priokskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: this inspection is carried out in order to verify the completed reconstruction of a capital construction facility in accordance with the completion notice TVVA 400264027 dated 26/12/2016. The objectives of this inspection are to prevent identify and suppress violations of legislation on urban development, including technical regulations and project documentation 6 The subject of this inspection is to verify the compliance of the completed reconstruction of the capital construction facility "MNPP "RyazanTulaOrel" DN500 Reconstruction of the Venev PPP in accordance with the notice of completion of construction TVVA 400264027 dated 26122016 to the technical regulations, norms and rules of design documentation and construction materials used during the reconstruction of the capital construction facility, as well as the results of such work to the requirements of technical regulations, other regulations and design documentation, including requirements for energy efficiency and requirements for the equipment of the capital construction facility with metering devices for used energy resources, the availability of a construction permit, and compliance with the requirements of parts 2 and 3 of Article 52 of the Urban Planning Code of the Russian Federation


# 00170701422156
Unscheduled inspection
Start date: 2017-01-18, end date: 2017-01-18, duration:
Authority: Priokskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: this inspection is carried out in order to verify the completed reconstruction of a capital construction facility in accordance with the notice of completion of construction TVVA 400264027 dated 26122016. The objectives of this inspection are to prevent identify and suppress violations of legislation on urban development, including technical regulations and project documentation 6 The subject of this inspection is to verify the compliance of the completed reconstruction of the capital construction facility "MNPP "RyazanTulaOrel" Du500 Reconstruction of the PPS "Plavsk" in accordance with the notice of completion of construction TVVA 400264027 dated 26122016, technical regulations, norms and rules of design documentation and construction materials used during the reconstruction of the capital construction facility, as well as the results of such work, requirements of technical regulations, other regulations and design documentation, including requirements regarding energy efficiency and requirements in regarding the equipment of the capital construction facility with metering devices for used energy resources, the availability of a construction permit, and compliance with the requirements of parts 2 and 3 of Article 52 of the Urban Planning Code of the Russian Federation


# 00170701373366
Unscheduled inspection
Start date: 2017-01-23, end date: 2017-01-26, duration:
Authority: VolzhskoOkskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: CH 2 p 1 article 10 of the Federal law 294ФЗ from December 26, 2008 "On protection of rights of legal entities and individual entrepreneurs when implementing the state control, supervision and municipal control" P5 p p 531 538 of the Regulations on Federal service for ecological, technological and nuclear supervision approved by the RF Government Decree of July 30, 2004, 401 PP b P3 ч5 St 54 the town-planning code of the Russian Federation article 6 of the Federal law of 21 December 1994 69ФЗ "ABOUT fire safety" PP 1 6 St3 of the Federal law "Technical regulations on safety of buildings and structures" 30 Dec 2009 384ФЗ p 2 of the decree of the Government of the Russian Federation dated 01 February 2006 54 "On the state construction supervision of the Russian Federation" п1124 the Procedure for conducting inspections in the process of state construction supervision and issuance of opinions on the compliance of the completed renovated reconstruction of capital construction objects to the requirements of norms and rules of other regulatory legal acts of the design documentation approved by the order of Federal service for ecological, technological and nuclear supervision from December 26, 2006 1129 РД11042006 p 2 3 5 Technical regulations of the customs Union "On safety of machines and equipment" approved by the Decision of the Customs Union Commission dated 18 October 2011 823 L1 CT1 Technical regulation of the customs Union "On safety of equipment for work in explosive environments" approved by the Decision of Customs Union Commission dated 18 October 2011 825 real test is carried out to control the execution entity points pp12 previously issued regulations Volzhskogo control of Rostekhnadzor dated 08 July 2016 пр168816П23 about elimination of the revealed violations of mandatory requirements objectives of this review are to prevent detection and suppression approved developer technical customer and the person in charge of the construction on the basis of the contract with the developer or technical customer violations of the legislation on town-planning activities including technical regulations and project designs


# 00160701128795
Unscheduled inspection
Start date: 2016-10-10, end date: 2016-11-03, duration:
Authority: Ministerstvo ekologii i prirodnyh resursov Nizhegorodskoi oblasti
Purpose of inspection: execution of the prescription


# 00160601716959
Unscheduled inspection
Start date: 2016-07-14, end date: 2016-07-18, duration:
Authority: Upravlenie Federalnoi sluzhby po nadzoru v sfere prirodopolzovaniya po Ryazanskoi oblasti
Purpose of inspection: assessment of the condition of premises buildings structures technical means equipment and other objects that are supposed to be used by the license applicant in carrying out the licensed type of activity


# 00160601711764
Unscheduled inspection
Start date: 2016-07-12, end date: 2016-07-15, duration:
Authority: Upravlenie Federalnoi sluzhby po nadzoru v sfere prirodopolzovaniya po Ivanovskoi oblasti
Purpose of inspection: Checking the condition of premises buildings structures technical facilities and equipment of other facilities that are proposed to be used by the license applicant or the licensee in carrying out the licensed type of activity and the availability of employees in order to assess the compliance of such facilities and employees with the licensing requirements


# 00150601255060
Unscheduled inspection
Start date: 2015-08-24, end date: —, duration:
Authority: VolzhskoOkskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: implementation of the previously issued regulation dated 24042015 47015P14


# 622101339644
Unscheduled inspection
Start date: 2021-11-09, end date: —, duration: 2
Authority: Gosudarstvennaya inspekciya stroitelnogo nadzora Ryazanskoi oblasti
Purpose of inspection: compliance of the completed capital construction facility with the requirements of the design documentation developed by the design organization JSC Giprotruboprovod


# 712100273470
Unscheduled inspection
Start date: 2021-06-07, end date: —, duration: 10
Authority: Priokskoe upravlenie Federalnoi sluzhby po ekologicheskomu, tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This inspection is carried out in order to monitor the compliance of the completed works with the design documentation, requirements for energy conservation and energy efficiency improvement during the reconstruction of the capital construction facility - the SOD Stationary checkpoint unit at 130 km of the Novki-Ryazan MNPP. Reconstruction" Russian Federation, Ryazan region, Klepikovsky district. The objectives of this audit are: prevention, detection and suppression of violations of legislation on urban development, including project documentation, committed by the developer (customer), as well as by the person carrying out reconstruction on the basis of a contract with the developer (customer).


# 772100216295
Unscheduled inspection
Start date: 2021-05-19, end date: —, duration: 10
Authority: Centralnoe upravlenie Federalnoi sluzhby po ekologicheskomu, tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Monitoring the compliance of the work performed with the mandatory requirements of the design documentation, including the requirements for energy efficiency and the requirements for equipping the capital construction facility with metering devices for energy resources used and other regulatory legal acts during the construction of the capital construction facility; the purpose of this audit is to prevent, identify and suppress violations committed by the developer, the technical customer, as well as the person carrying out the reconstruction based on a contract with a developer or technical customer, violations of legislation on urban planning, including project documentation, requirements for energy conservation and energy efficiency improvement; The subject of this review is:compliance of the work performed and the building materials used during the construction, reconstruction of the capital construction facility, as well as the results of such work with the requirements of the project documentation approved in accordance with Parts 15, 15.2 and 15.3 of art. 48 of the Urban Planning Code of the Russian Federation (subject to changes made to the project documentation in accordance with Parts 3.8 and 3.9 of art. 49 of the Urban Planning Code Of the Russian Federation) and (or) an information model, including energy efficiency requirements (with the exception of capital construction facilities that are not subject to energy efficiency requirements) and the requirements for equipping the capital construction facility with metering devices for used energy resources; availability of a building permit; meeting the requirements set out in Parts 2, 3 and 3.1 of Article 52 of the Urban Planning Code of the Russian Federation


# 772100223471
Unscheduled inspection
Start date: 2021-05-25, end date: —, duration: 10
Authority: Centralnoe upravlenie Federalnoi sluzhby po ekologicheskomu, tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Control of compliance of the performed works with the mandatory requirements of the design documentation, including the requirements of energy efficiency and the requirements of equipment of the capital construction facility with metering devices for energy resources used and other regulatory legal acts during the construction of the capital construction facility; the task of this check is to prevent, identify and suppress violations committed by the developer, the technical customer, as well as the person carrying out the reconstruction on on the basis of an agreement with a developer or technical customer, violations of legislation on urban development, including design documentation, requirements for energy conservation and energy efficiency improvement; The subject of this review is:compliance of the work and construction materials used in the construction process, reconstruction of the capital construction facility, as well as the results of such work with the requirements of the design documentation approved in accordance with Parts 15, 15.2 and 15.3 of Article 48 of the Urban Planning Code of the Russian Federation (taking into account the changes made to the design documentation in accordance with Parts 3.8 and 3.9 of Article 49 of the Urban Planning Code Of the Russian Federation) and (or) an information model, including energy efficiency requirements (with the exception of capital construction projects, to which energy efficiency requirements do not apply) and the requirements for equipping the capital construction facility with metering devices for used energy resources; availability of a building permit; compliance with the requirements established by Parts 2, 3 and 3.1 of Article 52 of the Urban Planning Code of the Russian Federation.


# 772100138431
Unscheduled inspection
Start date: 2021-04-19, end date: 2021-04-29, duration: 10
Authority: Centralnoe upravlenie Federalnoi sluzhby po ekologicheskomu, tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Control of compliance of the performed works with the mandatory requirements of the design documentation, including the requirements of energy efficiency and the requirements of equipment of the capital construction facility with metering devices for energy resources used and other regulatory legal acts during the construction of the capital construction facility; the task of this check is to prevent, identify and suppress violations committed by the developer, the technical customer, as well as the person carrying out the reconstruction on on the basis of an agreement with a developer or technical customer, violations of legislation on urban development, including design documentation, requirements for energy conservation and energy efficiency improvement; The subject of this review is:compliance of the work and construction materials used in the construction process, reconstruction of the capital construction facility, as well as the results of such work with the requirements of the design documentation approved in accordance with Parts 15, 15.2 and 15.3 of Article 48 of the Urban Planning Code of the Russian Federation (taking into account the changes made to the design documentation in accordance with Parts 3.8 and 3.9 of Article 49 of the Urban Planning Code Of the Russian Federation) and (or) an information model, including energy efficiency requirements (with the exception of capital construction projects, to which energy efficiency requirements do not apply) and the requirements for equipping the capital construction facility with metering devices for used energy resources; availability of a building permit; compliance with the requirements established by Parts 2, 3 and 3.1 of Article 52 of the Urban Planning Code of the Russian Federation.


# 772100067403
Unscheduled inspection
Start date: 2021-03-16, end date: 2021-03-29, duration: 10
Authority: Centralnoe upravlenie Federalnoi sluzhby po ekologicheskomu, tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Control of compliance of the performed works with the mandatory requirements of the design documentation, including the requirements of energy efficiency and the requirements of equipment of the capital construction facility with metering devices for energy resources used and other regulatory legal acts during the construction of the capital construction facility; the task of this check is to prevent, identify and suppress violations committed by the developer, the technical customer, as well as the person carrying out the reconstruction on on the basis of an agreement with a developer or technical customer, violations of legislation on urban development, including design documentation, requirements for energy conservation and energy efficiency improvement; The subject of this review is:compliance of the work and construction materials used in the construction process, reconstruction of the capital construction facility, as well as the results of such work with the requirements of the design documentation approved in accordance with Parts 15, 15.2 and 15.3 of Article 48 of the Urban Planning Code of the Russian Federation (taking into account the changes made to the design documentation in accordance with Parts 3.8 and 3.9 of Article 49 of the Urban Planning Code Of the Russian Federation) and (or) an information model, including energy efficiency requirements (with the exception of capital construction projects, to which energy efficiency requirements do not apply) and the requirements for equipping the capital construction facility with metering devices for used energy resources; availability of a building permit; compliance with the requirements established by Parts 2, 3 and 3.1 of Article 52 of the Urban Planning Code of the Russian Federation.


# 622100069169
Unscheduled inspection
Start date: 2021-03-10, end date: 2021-03-11, duration: 2
Authority: Gosudarstvennaya inspekciya stroitelnogo nadzora Ryazanskoi oblasti
Purpose of inspection: 1. Organizational and legal order of construction. 2. Verification of the ___ execution of paragraph 5 of Article 52 of the Urban Planning Code of the Russian Federation of the inspection notification no later than seven working days before the start of construction.


# 002005234256
Unscheduled inspection
Start date: 2020-10-16, end date: 2020-11-10, duration: 17
Authority: Privolzhskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: The inspection is carried out within the framework of the federal state construction supervision during the construction and reconstruction of capital construction facilities specified in paragraph 51 of Article 6 of the Urban Planning Code of the Russian Federation, with the exception of those facilities in respect of which state construction supervision is entrusted by decrees of the President of the Russian Federation to other federal executive authorities. The registration number of the function in the federal state information system "Federal Register of State and Municipal services of functions" 10001515438 Establish that this inspection is carried out with the aim of contacting the Volga Administration of Rostechnadzor notification of completion of the construction of the capital construction facility "Replacement of the Surgut Polotsk 168343 1702 km Reconstruction section" ex TSD05212731921 dated 07102020 ex 29048079 dated 09102020the objectives of this inspection are to prevent identify and suppress violations committed by the developer, the technical customer, as well as persons carrying out construction on the basis of the contract violations of the legislation on urban planning activities, including technical regulations and project documentation, with the developer or the technical customer, The subject of this audit is the compliance of the work performed and the building materials used during the construction of the reconstruction of the capital construction facility, as well as the results of such work with the requirements of the technical regulations of the project documentation, including the requirements of energy efficiency and the requirements of equipping the capital construction facility with metering devices used energy resource availability of construction permits compliance with the requirements of Parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation


# 002004490350
Unscheduled inspection
Start date: 2020-08-24, end date: 2020-09-18, duration: 20
Authority: Centralnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: this inspection is carried out in accordance with the notice of completion of construction reconstruction of the capital construction facility in order to control the compliance of the completed works with the mandatory requirements of the design documentation requirements for energy conservation and energy efficiency improvement and other regulatory legal acts during the construction of the capital construction facility the task of this inspection is to prevent identify and suppress the mistakes made by the developer the technical customer as well as the person carrying out construction on the basis of an agreement with a developer or a technical customer for violations of legislation on urban planning activities, including design documentation requirements for energy conservation and energy efficiency improvement, the subject of this audit is the compliance of the work and construction materials used in the construction process of reconstruction of a capital construction facility as well as the results of such work with the requirements approved in accordance with parts 15 152 and 153 of Article 48 of this Urban Planning Code project documentation, taking into account the changes made to the project documentation in accordance with parts 38 and 39 of Article 49 of this Code and or the information model, including energy efficiency requirements, with the exception of capital construction projects for which energy efficiency requirements do not apply and the requirements for equipping the capital construction facility with metering devices for energy resources used


# 002004484621
Unscheduled inspection
Start date: 2020-08-25, end date: 2020-09-21, duration: 20
Authority: Centralnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: this inspection is carried out in accordance with the notice of completion of construction reconstruction of the capital construction facility in order to control the compliance of the completed works with the mandatory requirements of the design documentation requirements for energy conservation and energy efficiency improvement and other regulatory legal acts during the construction of the capital construction facility the task of this inspection is to prevent identify and suppress the mistakes made by the developer the technical customer as well as the person carrying out construction on the basis of an agreement with a developer or a technical customer for violations of legislation on urban planning activities, including design documentation requirements for energy conservation and energy efficiency improvement, the subject of this audit is the compliance of the work and construction materials used in the construction process of reconstruction of a capital construction facility as well as the results of such work with the requirements approved in accordance with parts 15 152 and 153 of Article 48 of this Urban Planning Code project documentation, taking into account the changes made to the project documentation in accordance with parts 38 and 39 of Article 49 of this Code and or the information model, including energy efficiency requirements, with the exception of capital construction projects for which energy efficiency requirements do not apply and the requirements for equipping the capital construction facility with metering devices for energy resources used


# 002004512896
Unscheduled inspection
Start date: 2020-08-31, end date: 2020-09-25, duration: 20
Authority: Priokskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: in order to control the compliance of the completed works with the design documentation requirements for energy conservation and energy efficiency improvement during the reconstruction of the capital construction facility "MNPP "RiazanTulaOrel" DN 500 MNPP "NovkiRyazan" DN 500" Reconstruction of the Ryazan LPDS "Fourth stage" g Ryazan rn Yuzhny Promuzel d 35, the objectives of this audit are to prevent identify and suppress the allowed by the developer customer and also, the person carrying out the reconstruction on the basis of a contract with the developer or customer for violations of legislation on urban planning activities, including project documentation7 The subject of this audit is to verify the compliance of the work performed and the building materials used during the construction of the reconstruction of a capital construction facility, as well as the results of such work, with the requirements approved in accordance with parts 15 152 and 153 of Article 48 of the Urban Planning Code of the Russian Federation project documentation


# 002004419460
Unscheduled inspection
Start date: 2020-06-01, end date: 2020-06-29, duration:
Authority: Privolzhskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: execution of the inspection program case number 15512019 dated 15102019the objectives of this inspection are to prevent identify and suppress violations of urban planning legislation committed by the developer, the technical customer, as well as by persons carrying out construction on the basis of a contract with the developer or the technical customer, including technical regulations and project documentation7the subject of this inspection is the conformity of the work performed and the building materials used during construction and reconstruction the capital construction facility as well as the results of such work meet the requirements of technical regulations and project documentation, including the requirements for energy efficiency and the requirements for equipping the capital construction facility with metering devices for energy resources used. The need for a construction permit meets the requirements of Parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation


# 002004419406
Unscheduled inspection
Start date: 2020-06-01, end date: 2020-06-29, duration:
Authority: Privolzhskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: The inspection is carried out in order to implement the inspection program case number 15282019 dated 25072019the objectives of this inspection are to prevent identify and suppress violations of urban planning legislation committed by the developer, the technical customer, as well as by persons carrying out construction on the basis of a contract with the developer or the technical customer, including technical regulations and project documentation7the subject of this inspection is the compliance of the work and the construction materials used during the construction of the reconstruction of the capital construction facility as well as the results of such work, the requirements of the technical regulations of the project documentation, including the requirements for energy efficiency and the requirements for equipping the capital construction facility with metering devices for the energy resources used, require construction permits to comply with the requirements of parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation


# 002004419511
Unscheduled inspection
Start date: 2020-06-01, end date: 2020-06-29, duration:
Authority: Privolzhskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: execution of the inspection program case number 15642019 dated 18112019the objectives of this inspection are to prevent identify and suppress violations of urban planning legislation committed by the developer, the technical customer, as well as by persons carrying out construction on the basis of a contract with the developer or the technical customer, including technical regulations and project documentation7the subject of this inspection is the conformity of the work performed and the building materials used during construction and reconstruction the capital construction facility as well as the results of such work meet the requirements of technical regulations and project documentation, including the requirements for energy efficiency and the requirements for equipping the capital construction facility with metering devices for energy resources used. The need for a construction permit meets the requirements of Parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation


# 002004419548
Unscheduled inspection
Start date: 2020-05-27, end date: 2020-06-10, duration:
Authority: Privolzhskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: the inspection is carried out in order to apply to the Volga Administration of Rostechnadzor for a notice of completion of the capital construction facility "Replacement of the Surgut Polotsk 19369 193777 km Reconstruction section" ex TSD05212714509 dated 15052020 ex 29020853 dated 18052020the objectives of this inspection are to prevent identify and suppress violations committed by the developer, the technical customer, as well as by persons carrying out construction on the basis of a contract with the developer or the technical customer legislation on urban planning activities, including technical regulations and project documentation7 The subject of this audit is the compliance of the work performed and the building materials used during the construction of the reconstruction of the capital construction facility, as well as the results of such work, with the requirements of technical regulations of the project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used, the need for a construction permit, and compliance with the requirements Parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation


# 002004406769
Unscheduled inspection
Start date: 2020-05-27, end date: 2020-06-23, duration:
Authority: Privolzhskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: implementation of the previously issued regulation 43232020020 of 14022020 implementation of Article 52 of parts 5 and 6 of the Urban Planning Code of the Russian Federation notification of the elimination of violations bx 29017094 of 14042020 ex TSD05190911196 of 13042020the tasks of this audit are to monitor the implementation of the previously issued prescription7 The subject of this audit is the fulfillment of the instruction issued by the state construction supervision authority on the elimination of identified violations of mandatory requirements


# 002004406705
Unscheduled inspection
Start date: 2020-05-27, end date: 2020-06-23, duration:
Authority: Privolzhskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: the implementation of the previously issued regulation 43232020023 of 21022020 the implementation of Article 52 of parts 5 and 6 of the Urban Planning Code of the Russian Federation notification of the elimination of violations bx 29017098 of 14042020 ex TSD05190911193 of 13042020the tasks of this audit are to monitor the implementation of the previously issued prescription7 The subject of this audit is the fulfillment of the instruction issued by the state construction supervision authority on the elimination of identified violations of mandatory requirements


# 002004406734
Unscheduled inspection
Start date: 2020-05-27, end date: 2020-06-23, duration:
Authority: Privolzhskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: implementation of the previously issued regulation 43232020022 of 18022020 implementation of Article 52 of parts 5 and 6 of the Urban Planning Code of the Russian Federation notification of the elimination of violations bx 29017099 of 14042020 ex TSD05190911195 of 13042020the tasks of this audit are to monitor the implementation of the previously issued prescription7 The subject of this audit is the fulfillment of the instruction issued by the state construction supervision authority on the elimination of identified violations of mandatory requirements


# 002004420272
Unscheduled inspection
Start date: 2020-05-21, end date: 2020-05-29, duration: 7
Authority: Centralnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: the real test is conducted in accordance with the notice of JSC "Transneftemash Volga" on the completion of reconstruction of capital construction object from 15042020 ТВВГ180419062 Rin 21017394 from 16042020 to control the compliance of the work performed with the mandatory requirements of the project documentation requirements on energy saving and increase of energy efficiency and other normative legal acts in the construction, reconstruction of capital construction object "OTP "of Horinouchi" inv 2411 mnpp "Nevirapine" inv 2402 PPP "second" Camera start taking SOD Dn500 Reconstruction" located at Vladimir region, Gorokhovetskiy rayon vyaznikovskiy rayon kovrovskiy rayon sudogodskiy rayon Kameshkovskiy rayon Guskhrustalny rajasuda of this review is to prevent detection and suppression approved developer technical customer and the person in charge of the construction on the basis of the contract with the developer or technical customer violations of the legislation on town-planning activities including project documentation requirements on energy saving and improving energy effektivnostpukola present validation of yavlyaetsyasredstvom works and construction materials used in the construction process of reconstruction of capital construction object and the results of such work requirements approved in accordance with paragraphs 152 and 153 of 15 of article 48 of the present town planning code of the project documentation to reflect changes made in the project documentation in accordance with paragraphs 38 and 39 of article 49 of this Code or information model including the energy efficiency standards with the exception of capital construction objects, for which the energy performance requirements shall not apply and the requirements of the equipment of a capital construction object metering devices of energy resources used


# 122004412779
Unscheduled inspection
Start date: 2020-05-19, end date: 2020-06-16, duration:
Authority: Glavnoe upravlenie MCHS Rossii po Respublike Marii El
Purpose of inspection: Objectives implementation of the protocol of the operational meeting of the Security Council of the Russian Federation on the issue "On additional measures to prevent and eliminate floods and wildfires" dated 16012020 Pr111 Minutes of the meeting with Deputy Prime Minister of the Russian Federation V. Abramchenko dated 06022020 VAP115pr Tasks to carry out, in accordance with the procedure established by the legislation of the Russian Federation, verification of documents used in carrying out activities, inspection of the territory of an economic facility having a common The border with the forest areas of the Kilemary NPP of the Transneft Verkhnyaya Volga MRNU for compliance with mandatory fire safety requirements and taking measures based on the results of this inspection is the subject of the KNM compliance with mandatory fire safety requirements.


# 002004272389
Unscheduled inspection
Start date: 2020-02-10, end date: 2020-02-21, duration:
Authority: Privolzhskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: implementation of the previously issued regulation 43232019208 dated 24/122019 implementation of Article 52 of parts 5 and 6 of the Urban Planning Code of the Russian Federation notification of the elimination of violations bx 290715 dated 24012020 ex TSD051207091887 dated 24012020the tasks of this audit are to monitor the implementation of the previously issued prescription7 The subject of this audit is the fulfillment of the instruction issued by the state construction supervision authority on the elimination of identified violations of mandatory requirements


# 002004275689
Unscheduled inspection
Start date: 2020-02-11, end date: 2020-03-11, duration:
Authority: Priokskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: The real test is conducted on the basis of paragraph 2 of the programme of inspections, approved by order of the Oka Department of Rostechnadzor from 04022018 113 under the state construction supervision in the construction, reconstruction of capital construction objects referred to in paragraph 51 of article 6 of the town planning code of the Russian Federation with the exception of those objects in respect of which the exercise of state construction supervision of the decrees of the President of the Russian Federation assigned to other Federal bodies of Executive authority register number functions in the Federal state information system "Federal register of state and municipal services functions" 10001515438 6 to Establish what the real test is conducted to monitor compliance of the performed works with project documentation requirements for energy saving and energy efficiency in the construction of capital construction object "OTP "Resaltadores" DN 500 mnpp "Nevirapine" Ду500" Reconstruction: Ryazan lods Fourth stage" g Ryazan pH of the southern industrial hub d 35 on the basis of a programme of inspections, approved by order of the Oka Department of Rostechnadzor from 04022018 113 the purpose of this check is to prevent detection and suppression approved developer by the customer and a person engaged in construction on the basis of the contract with the Builder customer violations of the legislation on town-planning activities including project документации7 the Subject of this test is to verify compliance of work and construction materials used in the construction process of reconstruction of capital construction object and the results of such work requirements approved in accordance with paragraphs 152 and 153 of 15 of article 48


# 002004255721
Unscheduled inspection
Start date: 2020-01-27, end date: 2020-02-21, duration:
Authority: Privolzhskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: The inspection is carried out in order to implement the inspection program case number 15282019 dated 25072019the objectives of this inspection are to prevent identify and suppress violations of urban planning legislation committed by the developer, the technical customer, as well as by persons carrying out construction on the basis of a contract with the developer or the technical customer, including technical regulations and project documentation7the subject of this inspection is the compliance of the work and the construction materials used during the construction of the reconstruction of the capital construction facility as well as the results of such work, the requirements of the technical regulations of the project documentation, including the requirements for energy efficiency and the requirements for equipping the capital construction facility with metering devices for the energy resources used, the need for a construction permit to comply with the requirements of Parts 2 3 and


# 522004252151
Unscheduled inspection
Start date: 2020-01-30, end date: 2020-02-27, duration:
Authority: Upravlenie Federalnoi sluzhby gosudarstvennoi registracii kadastra i kartografii po Nizhegorodskoi oblasti
Purpose of inspection: Verification of compliance with the requirements of the land legislation of JSC Transneft Upper Volga on a land plot with cadastral number 52340500015566


# 002004260462
Unscheduled inspection
Start date: 2020-01-31, end date: 2020-02-07, duration:
Authority: Privolzhskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: execution of the inspection program case number 15812020 dated 24012020 application to the Volga Administration of Rostechnadzor notice of completion of the capital construction facility "Replacement of the Surgut Polotsk DN 1000 190782 190849 km Reconstruction site" LLC "TRANSNEFTSD" ex TSD051207091619 dated 22012020 ex 2901209 dated 28012020the tasks of this inspection are the prevention identification and suppression of violations committed by the developer, the technical customer, as well as persons carrying out construction on the basis of a contract with a developer or a technical customer for violations of urban planning legislation, including technical regulations and project documentation7 The subject of this audit is the compliance of the work performed and the building materials used during the construction of the reconstruction of the capital construction facility, as well as the results of such work with the requirements of technical regulations, project documentation, including energy efficiency requirements and equipment requirements of the capital construction facility construction with metering devices for energy resources used, the need for a construction permit to comply with the requirements of Parts 2 3 and 3_1 of Article 52 of the Urban Planning Code of the Russian Federation


# 002004256848
Unscheduled inspection
Start date: 2020-01-22, end date: 2020-02-18, duration:
Authority: Privolzhskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: The inspection is carried out in order to implement the inspection program case number 15642019 dated 18112019the objectives of this inspection are to prevent identify and suppress violations of urban planning legislation committed by the developer, the technical customer, as well as by persons carrying out construction on the basis of a contract with the developer or the technical customer, including technical regulations and project documentation7the subject of this inspection is the compliance of the work and the construction materials used during the construction of the reconstruction of the capital construction facility, as well as the results of such work, the requirements of the technical regulations of the project documentation, including the requirements for energy efficiency and the requirements for equipping the capital construction facility with metering devices for the energy resources used, require construction permits to comply with the requirements of Parts 2 3 and 3_1 of Article 52 of the Urban Planning Code of the Russian Federation


# 002004256232
Unscheduled inspection
Start date: 2020-01-20, end date: 2020-02-14, duration:
Authority: Privolzhskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: The inspection is carried out in order to implement the inspection program case number 15272019 dated 25072019the objectives of this inspection are to prevent identify and suppress violations of urban planning legislation committed by the developer, the technical customer, as well as by persons carrying out construction on the basis of a contract with the developer or the technical customer, including technical regulations and project documentation7the subject of this inspection is the compliance of the work and the construction materials used during the construction of the reconstruction of the capital construction facility, as well as the results of such work, the requirements of the technical regulations of the project documentation, including the requirements for energy efficiency and the requirements for equipping the capital construction facility with metering devices for the energy resources used, require construction permits to comply with the requirements of Parts 2 3 and 3_1 of Article 52 of the Urban Planning Code of the Russian Federation


# 002004255608
Unscheduled inspection
Start date: 2020-01-20, end date: 2020-02-14, duration:
Authority: Privolzhskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: The inspection is carried out in order to implement the inspection program case number 15282019 dated 25072019the objectives of this inspection are to prevent identify and suppress violations of urban planning legislation committed by the developer, the technical customer, as well as by persons carrying out construction on the basis of a contract with the developer or the technical customer, including technical regulations and project documentation7the subject of this inspection is the compliance of the work and the construction materials used during the construction of the reconstruction of the capital construction facility, as well as the results of such work, the requirements of the technical regulations of the project documentation, including the requirements for energy efficiency and the requirements for equipping the capital construction facility with metering devices for the energy resources used, require construction permits to comply with the requirements of Parts 2 3 and 3_1 of Article 52 of the Urban Planning Code of the Russian Federation


# 621904202974
Unscheduled inspection
Start date: 2019-12-24, end date: 2019-12-24, duration:
Authority: Gosudarstvennaya inspekciya stroitelnogo nadzora Ryazanskoi oblasti
Purpose of inspection: checking the completed construction of the object


# 001904151395
Unscheduled inspection
Start date: 2019-12-02, end date: 2019-12-20, duration:
Authority: Privolzhskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: in order to comply with the previously issued regulation 43232019123 of 07102019, Article 52 of parts 5 and 6 of the Urban Planning Code of the Russian Federation, notification of the elimination of violations bx 64420c of 11112019 ex TSD0512070937169 of 09112019, the objectives of this audit are to monitor the implementation of the previously issued prescription7 The subject of this audit is the fulfillment of the instruction issued by the state construction supervision authority on the elimination of identified violations of mandatory requirements


# 001904151383
Unscheduled inspection
Start date: 2019-12-02, end date: 2019-12-20, duration:
Authority: Privolzhskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: implementation of the previously issued regulation 4323201977122 dated 07102019 implementation of Article 52 of parts 5 and 6 of the Urban Planning Code of the Russian Federation notification on the elimination of violations bx 66580c dated 18112019 ex TSD0512070938092 dated 16112019the tasks of this audit are to monitor the implementation of the previously issued prescription7 The subject of this audit is the fulfillment of the instruction issued by the state construction supervision authority on the elimination of identified violations of mandatory requirements


# 001904151370
Unscheduled inspection
Start date: 2019-12-02, end date: 2019-12-27, duration:
Authority: Privolzhskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: the purpose of the previously issued regulation 4323201977082 dated 02082019 is to comply with Article 52 of parts 5 and 6 of the Urban Planning Code of the Russian Federation notification of the elimination of violations of bx 64417c dated 11112019 ex TSD0512070937170 dated 09112019the tasks of this audit are to monitor the implementation of the previously issued prescription7 The subject of this audit is the fulfillment of the instruction issued by the state construction supervision authority on the elimination of identified violations of mandatory requirements


# 001904068163
Unscheduled inspection
Start date: 2019-12-02, end date: 2019-12-20, duration:
Authority: Privolzhskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: the inspection is carried out in order to comply with the previously issued regulation 4323201977122 of 07102019, Article 52 of parts 5 and 6 of the Urban Planning Code of the Russian Federation notification of the elimination of violations bx 66580c of 18112019 ex TSD0512070938092 of 16112019the objectives of this audit are to monitor the implementation of the previously issued prescription7 The subject of this audit is to comply with the regulation issued by the state construction supervision authority on the elimination of identified violations of mandatory requirements


# 621905313904
Unscheduled inspection
Start date: 2019-12-09, end date: 2020-01-13, duration: 20
Authority: Gosudarstvennaya inspekciya truda v Ryazanskoi oblasti
Purpose of inspection: Implementation of federal state supervision


# 621904138294
Unscheduled inspection
Start date: 2019-12-09, end date: 2020-01-13, duration:
Authority: Gosudarstvennaya inspekciya truda v Ryazanskoi oblasti
Purpose of inspection: implementation of federal state supervision over the employer's compliance with labor legislation


# 001903992502
Unscheduled inspection
Start date: 2019-11-20, end date: 2019-12-03, duration:
Authority: Centralnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: this inspection is carried out in accordance with the notice of completion of construction reconstruction of the capital construction facility in order to control the compliance of the completed works with the mandatory requirements of the design documentation requirements for energy conservation and energy efficiency improvement and other regulatory legal acts during the construction of the capital construction facility the task of this inspection is to prevent identify and suppress the mistakes made by the developer the technical customer as well as the person carrying out construction on the basis of an agreement with a developer or a technical customer for violations of legislation on urban planning activities, including design documentation requirements for energy conservation and energy efficiency improvement, the subject of this audit is the compliance of the work and construction materials used in the construction process of reconstruction of a capital construction facility as well as the results of such work with the requirements approved in accordance with parts 15 152 and 153 of Article 48 of this Urban Planning Code project documentation, taking into account the changes made to the project documentation in accordance with parts 38 and 39 of Article 49 of this Code and or the information model, including energy efficiency requirements, with the exception of capital construction projects for which energy efficiency requirements do not apply and the requirements for equipping the capital construction facility with metering devices for energy resources used


# 001903991880
Unscheduled inspection
Start date: 2019-11-25, end date: 2019-12-06, duration:
Authority: Centralnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: control of compliance of the work performed with the mandatory requirements of the design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used and other regulatory legal acts during the construction of the capital construction facility, the task of this audit is to prevent identify and suppress violations committed by the developer, the technical customer, as well as the person carrying out the reconstruction on the basis of an agreement with the developer or the technical customer legislation on urban planning activities, including design documentation of requirements for energy conservation and energy efficiency improvement, the subject of this audit is the compliance of the work performed and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used for construction, compliance with the requirements established by parts 2, 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation


# 001903973448
Unscheduled inspection
Start date: 2019-11-25, end date: 2019-12-06, duration:
Authority: Centralnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: control of compliance of the work performed with the mandatory requirements of the design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used and other regulatory legal acts during the construction of the capital construction facility, the task of this audit is to prevent identify and suppress violations committed by the developer, the technical customer, as well as the person carrying out the reconstruction on the basis of an agreement with the developer or the technical customer legislation on urban planning activities, including design documentation of requirements for energy conservation and energy efficiency improvement, the subject of this audit is the compliance of the work performed and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used for construction, compliance with the requirements established by parts 2, 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation


# 001903983718
Unscheduled inspection
Start date: 2019-11-28, end date: 2019-12-11, duration:
Authority: Centralnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: control of compliance of the work performed with the mandatory requirements of the design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used and other regulatory legal acts during the construction of the capital construction facility, the task of this audit is to prevent identify and suppress violations committed by the developer, the technical customer, as well as the person carrying out the reconstruction on the basis of an agreement with the developer or the technical customer legislation on urban planning activities, including design documentation of requirements for energy conservation and energy efficiency improvement, the subject of this audit is the compliance of the work performed and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used for construction, compliance with the requirements established by parts 2, 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation


# 331903941470
Unscheduled inspection
Start date: 2019-11-14, end date: —, duration:
Authority:
Purpose of inspection:


# 001903806378
Unscheduled inspection
Start date: 2019-10-07, end date: 2019-10-18, duration:
Authority: Centralnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: this inspection is carried out in accordance with the notice of completion of construction reconstruction of the capital construction facility in order to control the compliance of the completed works with the mandatory requirements of the design documentation requirements for energy conservation and energy efficiency improvement and other regulatory legal acts during the construction of the capital construction facility the task of this inspection is to prevent identify and suppress the mistakes made by the developer the technical customer as well as the person carrying out construction on the basis of an agreement with a developer or a technical customer for violations of legislation on urban planning activities, including design documentation requirements for energy conservation and energy efficiency improvement, the subject of this audit is the compliance of the work and construction materials used in the construction process of reconstruction of a capital construction facility as well as the results of such work with the requirements approved in accordance with parts 15 152 and 153 of Article 48 of this Urban Planning Code project documentation, taking into account the changes made to the project documentation in accordance with parts 38 and 39 of Article 49 of this Code and or the information model, including energy efficiency requirements, with the exception of capital construction projects for which energy efficiency requirements do not apply and the requirements for equipping the capital construction facility with metering devices for energy resources used


# 001903806104
Unscheduled inspection
Start date: 2019-10-07, end date: 2019-10-18, duration:
Authority: Centralnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: this inspection is carried out in accordance with the notice of completion of construction reconstruction of the capital construction facility in order to control the compliance of the completed works with the mandatory requirements of the design documentation requirements for energy conservation and energy efficiency improvement and other regulatory legal acts during the construction of the capital construction facility the task of this inspection is to prevent identify and suppress the mistakes made by the developer the technical customer as well as the person carrying out construction on the basis of an agreement with a developer or a technical customer for violations of legislation on urban planning activities, including design documentation requirements for energy conservation and energy efficiency improvement, the subject of this audit is the compliance of the work and construction materials used in the construction process of reconstruction of a capital construction facility as well as the results of such work with the requirements approved in accordance with parts 15 152 and 153 of Article 48 of this Urban Planning Code project documentation, taking into account the changes made to the project documentation in accordance with parts 38 and 39 of Article 49 of this Code and or the information model, including energy efficiency requirements, with the exception of capital construction projects for which energy efficiency requirements do not apply and the requirements for equipping the capital construction facility with metering devices for energy resources used


# 001903387145
Unscheduled inspection
Start date: 2019-09-10, end date: 2019-10-07, duration:
Authority: Privolzhskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: execution of the inspection program case number 15282019 dated 25072019the objectives of this audit are to prevent identify and suppress violations of urban planning legislation committed by the developer, the technical customer, as well as by persons carrying out construction on the basis of a contract with the developer or the technical customer, including technical regulations and project documentation7the subject of this audit is the compliance of the work performed and the building materials used during construction and reconstruction the capital construction facility and the results of such work meet the requirements of the technical regulations of the project documentation, including the requirements for energy efficiency and the requirements for equipping the capital construction facility with metering devices for the energy resources used. the need for a construction permit to comply with the requirements of Parts 2 3 and 3_1 of Article 52 of the Urban Planning Code of the Russian Federation


# 001903384889
Unscheduled inspection
Start date: 2019-09-10, end date: 2019-10-07, duration:
Authority: Privolzhskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: the purpose of the audit program execution case number 15272019 dated 25072019the objectives of this audit are to prevent identify and suppress violations of legislation on urban development, including technical regulations and project documentation7 committed by the developer, the technical customer, as well as by persons carrying out construction on the basis of a contract with the developer or the technical customer. The subject of this audit is the compliance of the work and the construction materials used during construction reconstruction of the capital construction facility as well as the results of such work to the requirements of the technical regulations of the project documentation, including the requirements for energy efficiency and the requirements for equipping the capital construction facility with metering devices for the energy resources used, the need for a construction permit to comply with the requirements of Parts 2 3 and 3_1 of Article 52 of the Urban Planning Code of the Russian Federation


# 001903183343
Unscheduled inspection
Start date: 2019-09-13, end date: 2019-10-10, duration:
Authority: Privolzhskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: implementation of the previously issued regulation 43232019144048 dated 14052019 implementation of Article 52 of parts 5 and 6 of the Urban Planning Code of the Russian Federation notification of the elimination of violations bx 34589c dated 01072019 ex TSD0512070920278 dated 29062019the objectives of this audit are to prevent identify and suppress violations of legislation on urban planning activities committed by the developer, the technical customer, as well as persons carrying out construction on the basis of a contract with the developer or the technical customer in including technical regulations and project documentation7 The subject of this audit is the compliance of the work performed and the building materials used during the construction of the reconstruction of the capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation, including the requirements for energy efficiency and the requirements for equipping the capital construction facility with metering devices for energy resources used, the need for a construction permit to comply with the requirements of Parts 2 3 and 3_1 Article 52 of the Urban Planning Code of the Russian Federation


# 521903568056
Unscheduled inspection
Start date: 2019-09-26, end date: 2019-10-23, duration:
Authority: Upravlenie Federalnoi sluzhby po veterinarnomu i fitosanitarnomu nadzoru po Nizhegorodskoi oblasti i Respublike Marii El
Purpose of inspection: in order to monitor the execution of the previously issued instruction on the elimination of identified violations dated 18102018 04P47318


Information about inspections

This section displays information about planned and carried out inspections of control (supervision) bodies in accordance with Federal Law No. 294-FZ. Detailed information about the inspection can be obtained from the Unified Register of Inspections of the Prosecutor General's Office.