Found 74 inspections:

# 632201558825
Unscheduled inspection
Start date: 2022-01-19, end date: —, duration:
Authority:
Purpose of inspection:


# 632101488427
Unscheduled inspection
Start date: 2021-12-22, end date: —, duration:
Authority:
Purpose of inspection:


# 632101172173
Unscheduled inspection
Start date: 2021-10-08, end date: —, duration:
Authority: Gosudarstvennaya inspekciya stroitelnogo nadzora Samarskoi oblasti
Purpose of inspection:


# 632100591796
Unscheduled inspection
Start date: 2021-09-03, end date: —, duration:
Authority: Gosudarstvennaya inspekciya stroitelnogo nadzora Samarskoi oblasti
Purpose of inspection: Verification of compliance of the work performed and the construction materials used in the construction process, reconstruction of the capital construction facility, as well as the results of such work with the requirements of design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used.


# 632100591710
Unscheduled inspection
Start date: 2021-09-03, end date: —, duration:
Authority:
Purpose of inspection:


# 632100465026
Unscheduled inspection
Start date: 2021-08-17, end date: —, duration:
Authority: Gosudarstvennaya inspekciya stroitelnogo nadzora Samarskoi oblasti
Purpose of inspection: verification of Regulation No. 01-05-08/0538-1 dated 07/23/2021, notification of the elimination of violations dated 08/9/2021 ex.No. 4152


# 632100308951
Unscheduled inspection
Start date: 2021-07-19, end date: 2021-02-26, duration:
Authority: Gosudarstvennaya inspekciya stroitelnogo nadzora Samarskoi oblasti
Purpose of inspection: Verification of compliance of the work performed and the construction materials used in the construction process, reconstruction of the capital construction facility, as well as the results of such work with the requirements of design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used.


# 632100346027
Unscheduled inspection
Start date: 2021-07-14, end date: —, duration:
Authority: Gosudarstvennaya inspekciya stroitelnogo nadzora Samarskoi oblasti
Purpose of inspection: Verification of compliance of the work performed and the construction materials used in the construction process, reconstruction of the capital construction facility, as well as the results of such work with the requirements of design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used.


# 632100332682
Unscheduled inspection
Start date: 2021-07-26, end date: —, duration:
Authority: Gosudarstvennaya inspekciya stroitelnogo nadzora Samarskoi oblasti
Purpose of inspection: Verification of compliance of work performed and construction materials used during the construction and reconstruction of a capital construction facility, as well as the results of such work, with the requirements of technical regulations, other regulatory legal acts and design documentation, including energy efficiency requirements and requirements for equipping a capital construction facility with metering devices for energy resources used.


# 632100275124
Unscheduled inspection
Start date: 2021-06-15, end date: 2021-02-26, duration:
Authority: Gosudarstvennaya inspekciya stroitelnogo nadzora Samarskoi oblasti
Purpose of inspection: Verification of compliance of the work performed and the construction materials used in the construction process, reconstruction of the capital construction facility, as well as the results of such work with the requirements of design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used.


# 632100201530
Unscheduled inspection
Start date: 2021-05-11, end date: 2021-05-25, duration:
Authority: Gosudarstvennaya inspekciya stroitelnogo nadzora Samarskoi oblasti
Purpose of inspection: Verification of compliance of the work performed and the construction materials used in the construction process, reconstruction of the capital construction facility, as well as the results of such work with the requirements of design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used.


# 632100112649
Unscheduled inspection
Start date: 2021-04-12, end date: 2021-04-30, duration:
Authority: Gosudarstvennaya inspekciya stroitelnogo nadzora Samarskoi oblasti
Purpose of inspection: Verification of compliance of the work performed and the construction materials used in the construction process, reconstruction of the capital construction facility, as well as the results of such work with the requirements of design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used.


# 632100098162
Unscheduled inspection
Start date: 2021-04-01, end date: —, duration:
Authority:
Purpose of inspection:


# 632100065405
Unscheduled inspection
Start date: 2021-03-19, end date: 2021-04-06, duration:
Authority: Gosudarstvennaya inspekciya stroitelnogo nadzora Samarskoi oblasti
Purpose of inspection: Implementation of previously issued Regulation No. 01-05-08/1158-1 dated 12/10/2020, Notification No. 1065 dated 03/10/2021


# 632100048004
Unscheduled inspection
Start date: 2021-03-10, end date: 2021-03-31, duration:
Authority: Gosudarstvennaya inspekciya stroitelnogo nadzora Samarskoi oblasti
Purpose of inspection: Verification of compliance of the work performed and the construction materials used in the construction process, reconstruction of the capital construction facility, as well as the results of such work with the requirements of design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used.


# 632005277534
Unscheduled inspection
Start date: 2020-12-21, end date: 2020-12-25, duration:
Authority: Gosudarstvennaya inspekciya stroitelnogo nadzora Samarskoi oblasti
Purpose of inspection: Verification of compliance of the work performed and the construction materials used during the construction reconstruction of the capital construction facility as well as the results of such work with the requirements of design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used


# 632005275230
Unscheduled inspection
Start date: 2020-12-21, end date: 2020-12-25, duration:
Authority: Gosudarstvennaya inspekciya stroitelnogo nadzora Samarskoi oblasti
Purpose of inspection: Verification of compliance of the work performed and the construction materials used during the construction reconstruction of the capital construction facility as well as the results of such work with the requirements of design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used


# 632005249910
Unscheduled inspection
Start date: 2020-12-09, end date: 2020-12-30, duration:
Authority: Gosudarstvennaya inspekciya stroitelnogo nadzora Samarskoi oblasti
Purpose of inspection: Verification of compliance of the work performed and the construction materials used during the construction reconstruction of the capital construction facility as well as the results of such work with the requirements of design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used


# 632005215934
Unscheduled inspection
Start date: 2020-11-13, end date: —, duration:
Authority:
Purpose of inspection:


# 632005245847
Unscheduled inspection
Start date: 2020-11-30, end date: —, duration:
Authority:
Purpose of inspection:


# 632005245802
Unscheduled inspection
Start date: 2020-11-30, end date: 2020-12-15, duration:
Authority: Gosudarstvennaya inspekciya stroitelnogo nadzora Samarskoi oblasti
Purpose of inspection: Verification of compliance of the work performed and the construction materials used during the construction reconstruction of the capital construction facility as well as the results of such work with the requirements of design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used


# 632005162160
Unscheduled inspection
Start date: 2020-10-12, end date: 2020-11-06, duration:
Authority: Gosudarstvennaya inspekciya stroitelnogo nadzora Samarskoi oblasti
Purpose of inspection: Verification of compliance of the work performed and the construction materials used during the construction reconstruction of the capital construction facility as well as the results of such work with the requirements of design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used


# 632005178403
Unscheduled inspection
Start date: 2020-10-15, end date: —, duration:
Authority:
Purpose of inspection:


# 632005177281
Unscheduled inspection
Start date: 2020-10-15, end date: —, duration:
Authority:
Purpose of inspection:


# 632005177240
Unscheduled inspection
Start date: 2020-10-15, end date: —, duration:
Authority: Gosudarstvennaya inspekciya stroitelnogo nadzora Samarskoi oblasti
Purpose of inspection:


# 632004452173
Unscheduled inspection
Start date: 2020-07-15, end date: 2020-07-30, duration:
Authority: Gosudarstvennaya inspekciya stroitelnogo nadzora Samarskoi oblasti
Purpose of inspection: Verification of compliance of the work performed and the construction materials used during the construction reconstruction of the capital construction facility as well as the results of such work with the requirements of design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used


# 632004452100
Unscheduled inspection
Start date: 2020-07-15, end date: —, duration:
Authority:
Purpose of inspection:


# 632004247030
Unscheduled inspection
Start date: 2020-02-03, end date: —, duration:
Authority:
Purpose of inspection:


# 632004231069
Unscheduled inspection
Start date: 2020-02-03, end date: 2020-02-28, duration:
Authority: Gosudarstvennaya inspekciya stroitelnogo nadzora Samarskoi oblasti
Purpose of inspection: Verification of compliance of the work performed and the construction materials used during the construction reconstruction of the capital construction facility as well as the results of such work with the requirements of design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used


# 001904108078
Unscheduled inspection
Start date: 2019-12-20, end date: 2019-12-25, duration:
Authority: SrednePovolzhskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: control over the execution of previously issued regulations from 19092019 104280919063B


# 631903934850
Unscheduled inspection
Start date: 2019-11-11, end date: 2019-11-15, duration:
Authority: Gosudarstvennaya inspekciya stroitelnogo nadzora Samarskoi oblasti
Purpose of inspection: Verification of compliance of the work performed and the construction materials used during the construction reconstruction of the capital construction facility as well as the results of such work with the requirements of design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used


# 631903934319
Unscheduled inspection
Start date: 2019-11-11, end date: 2019-11-29, duration:
Authority: Gosudarstvennaya inspekciya stroitelnogo nadzora Samarskoi oblasti
Purpose of inspection: Verification of compliance of the work performed and the construction materials used during the construction reconstruction of the capital construction facility as well as the results of such work with the requirements of design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used


# 631903956585
Unscheduled inspection
Start date: 2019-11-18, end date: 2019-11-29, duration:
Authority: Gosudarstvennaya inspekciya stroitelnogo nadzora Samarskoi oblasti
Purpose of inspection: Verification of compliance of the work performed and the construction materials used during the construction reconstruction of the capital construction facility as well as the results of such work with the requirements of design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used


# 001904107947
Unscheduled inspection
Start date: 2019-09-09, end date: 2019-09-19, duration:
Authority: SrednePovolzhskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Order of the Head of the Federal Service for Environmental Technological and Nuclear Supervision AV Alyoshin "On conducting inspections of compliance with mandatory requirements by subjects of the electric power industry, heat supply organizations, heating grid organizations and Consumers of electric Energy in 2019" dated February 1, 2019 44 issued in pursuance of the order of the Government of the Russian Federation dated January 18, 2019 DKP9274


# 001903743795
Unscheduled inspection
Start date: 2019-09-09, end date: 2019-09-19, duration:
Authority: SrednePovolzhskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Order of the Head of the Federal Service for Environmental Technological and Nuclear Supervision AV Alyoshin "On conducting inspections of compliance with mandatory requirements by subjects of the electric power industry, heat supply organizations, heating grid organizations and Consumers of electric Energy in 2019" dated February 1, 2019 44 issued in pursuance of the order of the Government of the Russian Federation dated January 18, 2019 DKP9274


# 001903326750
Unscheduled inspection
Start date: 2019-09-09, end date: 2019-09-19, duration:
Authority: SrednePovolzhskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Order of the Head of the Federal Service for Environmental Technological and Nuclear Supervision AV Alyoshin "On conducting inspections of compliance with mandatory requirements by subjects of the electric power industry, heat supply organizations, heating grid organizations and Consumers of electric Energy in 2019" dated February 1, 2019 44 issued in pursuance of the order of the Government of the Russian Federation dated January 18, 2019 DKP9274


# 631902695257
Unscheduled inspection
Start date: 2019-05-16, end date: —, duration:
Authority:
Purpose of inspection:


# 631802191130
Unscheduled inspection
Start date: 2018-12-10, end date: 2018-12-14, duration:
Authority: Gosudarstvennaya inspekciya stroitelnogo nadzora Samarskoi oblasti
Purpose of inspection: Verification of compliance of the work performed and the construction materials used during the construction reconstruction of the capital construction facility as well as the results of such work with the requirements of design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used


# 631802191137
Unscheduled inspection
Start date: 2018-12-10, end date: 2018-12-14, duration:
Authority: Gosudarstvennaya inspekciya stroitelnogo nadzora Samarskoi oblasti
Purpose of inspection: Verification of compliance of the work performed and the construction materials used during the construction reconstruction of the capital construction facility as well as the results of such work with the requirements of design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used


# 631802003716
Unscheduled inspection
Start date: 2018-11-01, end date: 2018-11-21, duration:
Authority: Gosudarstvennaya inspekciya stroitelnogo nadzora Samarskoi oblasti
Purpose of inspection: Verification of compliance of the work performed and the construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations other regulatory legal acts and project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used


# 631801918856
Unscheduled inspection
Start date: 2018-10-17, end date: 2018-10-31, duration:
Authority: Gosudarstvennaya inspekciya stroitelnogo nadzora Samarskoi oblasti
Purpose of inspection: Verification of compliance of the work performed and the construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations other regulatory legal acts and project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used


# 631801918776
Unscheduled inspection
Start date: 2018-10-17, end date: —, duration:
Authority:
Purpose of inspection:


# 631800628122
Unscheduled inspection
Start date: 2018-09-12, end date: 2018-09-28, duration:
Authority: Gosudarstvennaya inspekciya stroitelnogo nadzora Samarskoi oblasti
Purpose of inspection: Verification of compliance of the work performed and the construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations other regulatory legal acts and project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used


# 631800628100
Unscheduled inspection
Start date: 2018-09-12, end date: 2018-09-28, duration:
Authority: Gosudarstvennaya inspekciya stroitelnogo nadzora Samarskoi oblasti
Purpose of inspection: Verification of compliance of the work performed and the construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations other regulatory legal acts and project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used


# 631800564318
Unscheduled inspection
Start date: 2018-07-25, end date: 2018-07-31, duration:
Authority: Gosudarstvennaya inspekciya stroitelnogo nadzora Samarskoi oblasti
Purpose of inspection: Implementation of the previously issued regulation 01050803931 dated 15052018 notification dated 16072018 3130


# 631800564297
Unscheduled inspection
Start date: 2018-07-25, end date: —, duration:
Authority: Gosudarstvennaya inspekciya stroitelnogo nadzora Samarskoi oblasti
Purpose of inspection:


# 631800456595
Unscheduled inspection
Start date: 2018-06-08, end date: 2018-06-13, duration:
Authority: Mezhregionalnoe upravlenie Federalnoi sluzhby po nadzoru v sfere prirodopolzovaniya po Samarskoi i Ulyanovskoi oblastyam
Purpose of inspection: implementation of licensing control in accordance with the application for the license of JSC "SEZ PPT "Tolyatti"


# 631800419881
Unscheduled inspection
Start date: 2018-05-29, end date: 2018-06-04, duration:
Authority: Mezhregionalnoe upravlenie Federalnoi sluzhby po nadzoru v sfere prirodopolzovaniya po Samarskoi i Ulyanovskoi oblastyam
Purpose of inspection: implementation of licensing control in accordance with the application for granting a license to JSC SEZ PPT Tolyatti


# 631800276699
Unscheduled inspection
Start date: 2018-05-03, end date: 2018-05-15, duration:
Authority: Gosudarstvennaya inspekciya stroitelnogo nadzora Samarskoi oblasti
Purpose of inspection: Verification of compliance of the work performed and the construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations other regulatory legal acts and project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used


# 631800276764
Unscheduled inspection
Start date: 2018-05-03, end date: 2018-05-15, duration:
Authority: Gosudarstvennaya inspekciya stroitelnogo nadzora Samarskoi oblasti
Purpose of inspection: Verification of compliance of the work performed and the construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations other regulatory legal acts and project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used


# 631800092292
Unscheduled inspection
Start date: 2018-03-02, end date: 2018-03-23, duration:
Authority: Gosudarstvennaya inspekciya stroitelnogo nadzora Samarskoi oblasti
Purpose of inspection: Verification of compliance of the work performed and the construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations other regulatory legal acts and project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used


# 631800168071
Unscheduled inspection
Start date: 2018-02-27, end date: 2018-03-14, duration:
Authority: Mezhregionalnoe upravlenie Federalnoi sluzhby po nadzoru v sfere prirodopolzovaniya po Samarskoi i Ulyanovskoi oblastyam
Purpose of inspection: implementation of license control according to the application for granting a license


# 63180803061753
Unscheduled inspection
Start date: 2018-01-18, end date: 2018-01-24, duration:
Authority: Gosudarstvennaya inspekciya stroitelnogo nadzora Samarskoi oblasti
Purpose of inspection: Order dated 29092017 032219726 notice dated 11012018 47 Fulfillment of a previously issued order


# 631800022809
Unscheduled inspection
Start date: 2018-01-29, end date: 2018-01-31, duration:
Authority: Gosudarstvennaya inspekciya stroitelnogo nadzora Samarskoi oblasti
Purpose of inspection: Verification of compliance of the work performed and the construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations other regulatory legal acts and project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used


# 63170803025039
Unscheduled inspection
Start date: 2017-12-26, end date: 2017-12-28, duration:
Authority: Gosudarstvennaya inspekciya stroitelnogo nadzora Samarskoi oblasti
Purpose of inspection: Inspection program dated 04102016 notification dated 19122017 5876 Verification of compliance of work performed and construction materials used during the construction reconstruction of a capital construction facility, as well as the results of such work, with the requirements of technical regulations, other regulatory legal acts and project documentation, including energy efficiency requirements and requirements for equipping a capital construction facility with metering devices for energy resources used


# 63170802873041
Unscheduled inspection
Start date: 2017-12-01, end date: 2017-12-15, duration:
Authority: Gosudarstvennaya inspekciya stroitelnogo nadzora Samarskoi oblasti
Purpose of inspection: Inspection program dated 04102016 notification dated 13112017 4974 Verification of compliance of work performed and construction materials used during the construction reconstruction of a capital construction facility, as well as the results of such work, with the requirements of technical regulations, other regulatory legal acts and project documentation, including energy efficiency requirements and requirements for equipping a capital construction facility with metering devices for energy resources used


# 63170802788992
Unscheduled inspection
Start date: 2017-11-07, end date: 2017-11-30, duration:
Authority: Gosudarstvennaya inspekciya stroitelnogo nadzora Samarskoi oblasti
Purpose of inspection: Inspection program dated 11042014 notification dated 24102017 4582 Verification of compliance of work performed and construction materials used during the construction reconstruction of a capital construction facility, as well as the results of such work, with the requirements of technical regulations, other regulatory legal acts and project documentation, including energy efficiency requirements and requirements for equipping a capital construction facility with metering devices for energy resources used


# 63170802524293
Unscheduled inspection
Start date: 2017-09-22, end date: 2017-09-29, duration:
Authority: Gosudarstvennaya inspekciya stroitelnogo nadzora Samarskoi oblasti
Purpose of inspection: Inspection program dated 18032015 notification dated 12092017 3810 Verification of compliance of work performed and construction materials used during the construction reconstruction of a capital construction facility, as well as the results of such work, with the requirements of technical regulations, other regulatory legal acts and project documentation, including energy efficiency requirements and requirements for equipping a capital construction facility with metering devices for energy resources used


# 63170701696491
Unscheduled inspection
Start date: 2017-07-03, end date: 2017-07-19, duration:
Authority: Gosudarstvennaya inspekciya stroitelnogo nadzora Samarskoi oblasti
Purpose of inspection: Inspection program dated 11042014 notification dated 02062017 2066 Verification of compliance of work performed and construction materials used during the construction reconstruction of a capital construction facility, as well as the results of such work, with the requirements of technical regulations, other regulatory legal acts and project documentation, including energy efficiency requirements and requirements for equipping a capital construction facility with metering devices for energy resources used


# 63170701526750
Unscheduled inspection
Start date: 2017-04-17, end date: —, duration:
Authority:
Purpose of inspection:


# 63170701526802
Unscheduled inspection
Start date: 2017-04-17, end date: 2017-04-21, duration:
Authority: Gosudarstvennaya inspekciya stroitelnogo nadzora Samarskoi oblasti
Purpose of inspection: Order from 27022017 032203006 Fulfillment of a previously issued order


# 63170701422829
Unscheduled inspection
Start date: 2017-03-06, end date: —, duration:
Authority:
Purpose of inspection:


# 63170701464187
Unscheduled inspection
Start date: 2017-03-21, end date: 2017-03-31, duration:
Authority: Gosudarstvennaya inspekciya stroitelnogo nadzora Samarskoi oblasti
Purpose of inspection: Inspection program dated 11042014the notification dated 10032017 801 Verification of the compliance of the work performed and the building materials used during the construction reconstruction of the capital construction facility, as well as the results of such work, with the requirements of technical regulations, other regulatory legal acts and project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used


# 63170701376982
Unscheduled inspection
Start date: 2017-02-14, end date: 2017-02-20, duration:
Authority: Gosudarstvennaya inspekciya stroitelnogo nadzora Samarskoi oblasti
Purpose of inspection: Inspection program dated 14042014 notification on 07022017 455 Verification of compliance of work performed and construction materials used during the construction reconstruction of the capital construction facility, as well as the results of such work, with the requirements of technical regulations, other regulatory legal acts and project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used


# 63170701339301
Unscheduled inspection
Start date: 2017-02-01, end date: 2017-02-28, duration:
Authority: Gosudarstvennaya inspekciya stroitelnogo nadzora Samarskoi oblasti
Purpose of inspection: Inspection program dated 14082013 notification dated 20012017 223 Verification of compliance of work performed and construction materials used during the construction reconstruction of a capital construction facility, as well as the results of such work, with the requirements of technical regulations, other regulatory legal acts and project documentation, including energy efficiency requirements and requirements for equipping a capital construction facility with metering devices for energy resources used


# 63170701339342
Unscheduled inspection
Start date: 2017-02-01, end date: —, duration:
Authority:
Purpose of inspection:


# 63170701303178
Unscheduled inspection
Start date: 2017-01-19, end date: 2017-01-27, duration:
Authority: Gosudarstvennaya inspekciya stroitelnogo nadzora Samarskoi oblasti
Purpose of inspection: Inspection program dated 18032015 notification dated 12012017 104 Verification of compliance of work performed and construction materials used during the construction reconstruction of a capital construction facility, as well as the results of such work, with the requirements of technical regulations, other regulatory legal acts and project documentation, including energy efficiency requirements and requirements for equipping a capital construction facility with metering devices for energy resources used


# 63160701253046
Unscheduled inspection
Start date: 2016-12-22, end date: 2016-12-26, duration:
Authority: Gosudarstvennaya inspekciya stroitelnogo nadzora Samarskoi oblasti
Purpose of inspection: Inspection program dated 14042014 notification dated 15122016 7034 Verification of compliance of work performed and construction materials used during the construction reconstruction of a capital construction facility, as well as the results of such work, with the requirements of technical regulations, other regulatory legal acts and project documentation, including energy efficiency requirements and requirements for equipping a capital construction facility with metering devices for energy resources used


# 63160701056390
Unscheduled inspection
Start date: 2016-11-07, end date: —, duration:
Authority:
Purpose of inspection:


# 63160701112011
Unscheduled inspection
Start date: 2016-11-21, end date: 2016-11-30, duration:
Authority: Gosudarstvennaya inspekciya stroitelnogo nadzora Samarskoi oblasti
Purpose of inspection: Verification of compliance of the work performed and the construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations other regulatory legal acts and project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used


# 63160701016467
Unscheduled inspection
Start date: 2016-10-19, end date: 2016-10-28, duration:
Authority: Gosudarstvennaya inspekciya stroitelnogo nadzora Samarskoi oblasti
Purpose of inspection: Verification of compliance of the work performed and the construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations other regulatory legal acts and project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used


# 63160701016269
Unscheduled inspection
Start date: 2016-10-19, end date: —, duration:
Authority:
Purpose of inspection:


# 63160701016119
Unscheduled inspection
Start date: 2016-10-19, end date: —, duration:
Authority: Gosudarstvennaya inspekciya stroitelnogo nadzora Samarskoi oblasti
Purpose of inspection:


# 63160701016043
Unscheduled inspection
Start date: 2016-10-19, end date: —, duration:
Authority:
Purpose of inspection:


Information about inspections

This section displays information about planned and carried out inspections of control (supervision) bodies in accordance with Federal Law No. 294-FZ. Detailed information about the inspection can be obtained from the Unified Register of Inspections of the Prosecutor General's Office.