Found 100 inspections:

# 002105266936
Unscheduled inspection
Start date: 2021-01-25, end date: 2021-02-19, duration: 20
Authority: Sibirskoe upravlenie Federalnoi sluzhby po ekologicheskomu, tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: To establish that this inspection is carried out on the basis of the Notice of JSC Tomskgazprom on the completion of the construction of the capital construction facility dated 03.12.2020 No. 09/1-2062 (ex. No. 344/11802 dated 03.12.2020). The purpose of this inspection is to prevent, identify and suppress violations committed by the developer, the customer, as well as the person carrying out construction on the basis of the contract with the developer or the customer, violations of the legislation on urban planning activities, project documentation.


# 002105266909
Unscheduled inspection
Start date: 2021-01-25, end date: 2021-02-19, duration: 20
Authority: Sibirskoe upravlenie Federalnoi sluzhby po ekologicheskomu, tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: To establish that this inspection is carried out on the basis of the Notice of JSC Tomskgazprom on the completion of the construction of the capital construction facility dated 03.12.2020 No. 09/1-2061 (ex. No. 344/11805 dated 03.12.2020). The purpose of this inspection is to prevent, identify and suppress violations committed by the developer, the customer, as well as the person carrying out construction on the basis of the contract with the developer or the customer, violations of the legislation on urban planning activities, project documentation.


# 002105266921
Unscheduled inspection
Start date: 2021-01-25, end date: —, duration:
Authority:
Purpose of inspection:


# 002105281906
Unscheduled inspection
Start date: 2021-01-25, end date: 2021-02-19, duration: 20
Authority: Sibirskoe upravlenie Federalnoi sluzhby po ekologicheskomu, tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Based on the Notice of JSC Tomskgazprom on the completion of the construction of the capital construction facility dated 08.12.2020 No. 09/1-2096 (ex. No. 344/12198 dated 09.12.2020). The purpose of this audit is to prevent, identify and suppress violations committed by the developer, the customer, as well as the person carrying out construction on the basis of a contract with the developer or the customer legislation on urban planning activities, project documentation. The subject of this audit is to verify the compliance of the work performed and the construction materials used during the construction of the capital construction facility "Kazan NGKM Development for full development. Bushes No. 9, 19, 16, 16bis. 5 stage", as well as the results of such work to the requirements of the project documentation approved in accordance with parts 15, 15_2 and 15_3 of Article 48 of the Urban Planning Code of the Russian Federation (subject to changes made to the project documentation in accordance with Parts 3_8 and 3_9 of Article 49 of the Urban Planning Code of the Russian Federation of the Russian Federation) and (or) an information model (if the formation and maintenance of an information model are mandatory in accordance with the requirements of the Urban Planning Code of the Russian Federation), including energy efficiency requirements (with the exception of capital construction facilities to which energy efficiency requirements do not apply) and the requirements for equipping the capital construction facility with metering devices used energy resources; availability of a building permit; compliance with the requirements established by parts 2, 3 and 3_1 of Article 52 of the Urban Planning Code of the Russian Federation.


# 002105266929
Unscheduled inspection
Start date: 2021-01-25, end date: 2021-02-19, duration: 20
Authority: Sibirskoe upravlenie Federalnoi sluzhby po ekologicheskomu, tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: To establish that this inspection is carried out on the basis of the Notice of JSC Tomskgazprom on the completion of the construction of the capital construction facility dated 03.12.2020 No. 09/1-2064 (ex. No. 344/11804 dated 03.12.2020). The purpose of this inspection is to prevent, identify and suppress violations committed by the developer, the customer, as well as the person carrying out construction on the basis of the contract with the developer or the customer, violations of the legislation on urban planning activities, project documentation.


# 002004446019
Unscheduled inspection
Start date: 2020-07-27, end date: 2020-08-21, duration: 20
Authority: Sibirskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: To establish that this inspection is carried out on the basis of the Notice of JSC Tomskgazprom on the completion of the construction of a capital construction facility dated 17062020 092434 bx 3445552 dated 17062020, the purpose of this inspection is to prevent identify and suppress violations of legislation on urban development activities and project documentation committed by the developer, the customer, as well as the person carrying out construction on the basis of a contract with the developer or the customer


# 002004431297
Unscheduled inspection
Start date: 2020-06-29, end date: 2020-07-24, duration: 20
Authority: Sibirskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: To establish that this inspection is carried out in order to implement the Inspection Program approved by Kolegov DV, Deputy Head of the Siberian Department of Rostechnadzor, dated 07052020g T463the objectives of this inspection are to prevent identify and suppress violations of legislation on urban development and project documentation committed by the developer, the customer, and the person carrying out construction on the basis of a contract with the developer or the customer, hereinafter referred to as the contractor


# 002004431265
Unscheduled inspection
Start date: 2020-06-29, end date: —, duration:
Authority: Sibirskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection:


# 002004425399
Unscheduled inspection
Start date: 2020-06-04, end date: —, duration:
Authority: Sibirskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection:


# 002004305449
Unscheduled inspection
Start date: 2020-03-02, end date: 2020-03-30, duration:
Authority: Sibirskoe mezhregionalnoe territorialnoe upravlenie Federalnogo agentstva po tehnicheskomu regulirovaniyu i metrologii
Purpose of inspection: compliance with the regulations of state control bodies, supervision bodies of municipal control, assessment of the conformity of products and related processes of operation, storage, transportation, sale and disposal with the mandatory requirements of technical regulations of standards, compliance with the previously issued regulation dated August 16, 2019 17c due to the expiration of its execution on March 01, 2020


# 002004274097
Unscheduled inspection
Start date: 2020-03-30, end date: 2020-04-24, duration:
Authority: Sibirskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: In order to implement the Inspection Program approved by DV Kolegov, Deputy Head of the Siberian Directorate of Rostechnadzor, dated 17012020 T358, the purpose of this inspection is to prevent identify and suppress violations of legislation on urban development by the developer, the customer, as well as by the person carrying out construction on the basis of a contract with the developer or the customer, and the subject of this inspection is to verify the compliance of the work and the construction materials used in the process. construction of the capital construction facility "Development of the Severostaninsky NGKM Bush 3 wells" as well as the results of such work to the requirements of the project documentation approved in accordance with Parts 15 15_2 and 15_3 of Article 48 of the Urban Planning Code of the Russian Federation, taking into account the changes made to the project documentation in accordance with Parts 3_8 and 3_9 of Article 49 of the Urban Planning Code of the Russian Federation and or the information model in if the formation and maintenance of an information model are mandatory in accordance with the requirements of the Urban Planning Code of the Russian Federation, including energy efficiency requirements, with the exception of capital construction facilities for which energy efficiency requirements do not apply, and the requirements for equipping the capital construction facility with metering devices for energy resources used, the availability of a construction permit, and compliance with the requirements set out in Parts 2 3 and 3_1 of Article 52 Urban Planning Code of the Russian Federation


# 002004338912
Unscheduled inspection
Start date: 2020-03-11, end date: 2020-04-07, duration:
Authority: Sibirskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: To establish that this inspection is carried out on the basis of the Notice of JSC Tomskgazprom on the completion of the construction of a capital construction facility dated 27012020 091286 bx 3441704 dated 27022020. The objectives of this inspection are to prevent identify and suppress violations of legislation on urban development committed by the developer, the customer, as well as the person carrying out construction on the basis of a contract with the developer or the customer, hereinafter referred to as the contractor, including project documentation


# 002004295090
Unscheduled inspection
Start date: 2020-02-28, end date: 2020-03-27, duration:
Authority: Sibirskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Based on the Notice of JSC Tomskgazprom on the completion of the construction of a capital construction facility dated 27012020 09186 bx 344419 dated 28012020, the objectives of this audit are to prevent identify and suppress violations of legislation on urban development, including project documentation, committed by the developer, the customer, as well as by the person carrying out construction on the basis of a contract with the developer or the customer, hereinafter referred to as the contractor. The subject of this audit is verification of the compliance of the work performed and the construction materials used during the construction of the capital construction facility "Development of the Severostaninskoye oil field for the period of trial operation Reconstruction Stage 2" as well as the results of such work with the requirements of the project documentation approved in accordance with Parts 15 15_2 and 15_3 of Article 48 of the Urban Planning Code of the Russian Federation, taking into account the changes made to the project documentation in accordance with by parts 3_8 and 3_9 of Article 49 of the Urban Planning Code of the Russian Federation and or the information model, if the formation and maintenance of the information model are mandatory in accordance with the requirements of the Urban Planning Code of the Russian Federation, including energy efficiency requirements, with the exception of capital construction facilities for which energy efficiency requirements do not apply and the requirements for equipping the capital construction facility with energy metering devices resources for the availability of a building permit to meet the requirements set out in Parts 2 3 and 3_1 of Article 52 of the Urban Planning Code of the Russian Federation


# 002004209800
Unscheduled inspection
Start date: 2020-02-28, end date: 2020-03-27, duration:
Authority: Sibirskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: In order to implement the Inspection Program approved by the Acting Deputy Head of the Siberian Directorate of Rostechnadzor, AP Gayenko, dated 14112019 T397, the purpose of this inspection is to prevent identify and suppress violations of legislation on urban development by the developer, the customer, as well as by the person carrying out construction on the basis of a contract with the developer or the customer, and the subject of this inspection is to verify the compliance of the work and the construction materials used during the construction of the capital construction facility "Arrangement of the bushes of wells of the Myldzhinsky NGKM stage 4 construction" as well as the results of such work, the requirements of the project documentation approved in accordance with Parts 15 15_2 and 15_3 of Article 48 of the Urban Planning Code of the Russian Federation, taking into account the changes made to the project documentation in accordance with Parts 3_8 and 3_9 of Article 49 of the Urban Planning Code of the Russian Federation and or an information model if the formation and maintenance of an information model are mandatory in accordance with the requirements of the Urban Planning Code of the Russian Federation, including energy efficiency requirements, with the exception of capital construction facilities for which energy efficiency requirements do not apply and the requirements for equipping the capital construction facility with metering devices for energy resources used, the availability of a construction permit, and compliance with the requirements set out in Parts 2 to 3 and 3_1 of Article 52 of the Urban Planning Code of the Russian Federation


# 002004165692
Unscheduled inspection
Start date: 2020-01-27, end date: —, duration:
Authority: Sibirskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection:


# 001903822584
Unscheduled inspection
Start date: 2019-10-07, end date: 2019-10-11, duration:
Authority: Sibirskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: in order to monitor the implementation of the points of the previously issued regulation dated 17052019 37ND1913, the deadlines for which expire, the objectives of this audit are to prevent identify and suppress violations by legal entities operating in the field of industrial safety, their managers and other officials, individual entrepreneurs and their authorized representatives of the requirements established by the Federal Law On Industrial Safety of Hazardous Production Facilities, other federal laws and adopted in accordance with in accordance with other regulatory legal acts of the Russian Federation in the field of industrial safety,7 The subject of this audit is the fulfillment of the points prescribed by the state control bodies, the supervision of municipal control bodies


# 001902779606
Unscheduled inspection
Start date: 2019-09-30, end date: 2019-10-25, duration:
Authority: Sibirskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: To establish that this inspection is carried out in order to implement the Inspection Program approved by Kolegov DV, Deputy Head of the Siberian Department of Rostechnadzor, dated 12022019g8 T369THE objectives of this inspection are to prevent identify and suppress violations of legislation on urban planning activities and project documentation committed by the developer, the customer, and the person carrying out construction on the basis of a contract with the developer or the customer, hereinafter referred to as the contractor


# 001902783654
Unscheduled inspection
Start date: 2019-09-02, end date: —, duration:
Authority: Sibirskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection:


# 001902867171
Unscheduled inspection
Start date: 2019-09-09, end date: 2019-10-04, duration:
Authority: Sibirskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: To establish that this inspection is carried out on the basis of the Notice of JSC Tomskgazprom on the completion of the construction of a capital construction facility dated 04072019 091191170 bx 41313851 dated 04072019. The objectives of this inspection are to prevent identify and suppress violations of the legislation on urban development, including project documentation, committed by the developer, the customer, as well as by the person carrying out construction on the basis of a contract with the developer or the customer, hereinafter referred to as the contractor


# 001902905628
Unscheduled inspection
Start date: 2019-07-24, end date: —, duration:
Authority: Sibirskoe mezhregionalnoe territorialnoe upravlenie Federalnogo agentstva po tehnicheskomu regulirovaniyu i metrologii
Purpose of inspection:


# 001902742319
Unscheduled inspection
Start date: 2019-07-22, end date: 2019-08-16, duration:
Authority: Sibirskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: To establish that this inspection is carried out in order to monitor the implementation of Regulation T251936 of 25032019 on the elimination of identified offenses, the deadline for which expires. The objectives of this inspection are to prevent identify and suppress violations of legislation on urban development, including technical regulations and project documentation, committed by the developer, the customer, as well as by the person carrying out construction on the basis of a contract with the developer or the customer, hereinafter referred to as the contractor


# 001902566663
Unscheduled inspection
Start date: 2019-03-26, end date: 2019-04-22, duration:
Authority: Sibirskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: To establish that this inspection is carried out in order to implement the Inspection Program approved by Deputy Head of the Siberian Department of Rostechnadzor Kolegov DV dated 23042018 T361. The objectives of this inspection are to prevent identify and suppress violations of legislation on urban development activities and project documentation committed by the developer, the customer, and the person carrying out construction on the basis of a contract with the developer or the customer, hereinafter referred to as the contractor


# 001902527553
Unscheduled inspection
Start date: 2019-02-25, end date: 2019-03-25, duration:
Authority: Sibirskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: The objectives of this audit are to prevent identify and suppress violations of the legislation on urban development and project documentation committed by the developer, the customer, as well as the person carrying out construction on the basis of an agreement with the developer or the customer, hereinafter referred to as the contractor


# 001802008154
Unscheduled inspection
Start date: 2018-11-06, end date: —, duration:
Authority:
Purpose of inspection:


# 001801941629
Unscheduled inspection
Start date: 2018-11-06, end date: —, duration:
Authority:
Purpose of inspection:


# 001801946718
Unscheduled inspection
Start date: 2018-10-29, end date: —, duration:
Authority: Sibirskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection:


# 001800597253
Unscheduled inspection
Start date: 2018-08-06, end date: 2018-08-31, duration:
Authority: Sibirskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: In order to monitor the execution of the instruction on the elimination of identified offenses, the deadline for which has expired, the objectives of this audit are to establish the facts of the failure of JSC Tomskgazprom to comply with the instruction from 27032018 g T251820


# 001800632940
Unscheduled inspection
Start date: 2018-08-20, end date: 2018-09-14, duration:
Authority: Sibirskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: control over the execution of regulation C2518011 of 12022018 on the elimination of identified offenses, the deadline for which expired on 18062018


# 001800600279
Unscheduled inspection
Start date: 2018-07-30, end date: —, duration:
Authority: Sibirskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection:


# 001800074782
Unscheduled inspection
Start date: 2018-02-12, end date: —, duration:
Authority:
Purpose of inspection:


# 001800053060
Unscheduled inspection
Start date: 2018-02-12, end date: —, duration:
Authority: Sibirskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection:


# 001800169364
Unscheduled inspection
Start date: 2018-02-01, end date: 2018-03-01, duration:
Authority: Sibirskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: The objectives of this audit are to prevent identify and suppress violations of the legislation on urban development activities committed by the developer and the technical customer, including the requirements of the technical regulations of the project documentation


# 001800074803
Unscheduled inspection
Start date: 2018-02-26, end date: 2018-03-27, duration:
Authority: Sibirskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: The objectives of this audit are to prevent identify and suppress violations of the legislation on urban development activities committed by the developer and the technical customer, including the requirements of the technical regulations of the project documentation


# 00180803023098
Unscheduled inspection
Start date: 2018-01-16, end date: —, duration:
Authority: Sibirskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection:


# 00180802965221
Unscheduled inspection
Start date: 2018-01-09, end date: —, duration:
Authority: Sibirskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection:


# 00180802882519
Unscheduled inspection
Start date: 2018-01-09, end date: 2018-02-02, duration:
Authority: Sibirskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: The objectives of this audit are to prevent identify and suppress violations of the legislation on urban development activities committed by the developer and the technical customer, including the requirements of the technical regulations of the project documentation


# 00170802960705
Unscheduled inspection
Start date: 2017-12-08, end date: 2017-12-26, duration:
Authority: Sibirskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: The objectives of this audit are to prevent identify and suppress violations of the legislation on urban development activities committed by the developer and the technical customer, including the requirements of the technical regulations of the project documentation


# 00170802929748
Unscheduled inspection
Start date: 2017-12-18, end date: 2018-01-22, duration:
Authority: Sibirskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: In order to monitor the compliance of completed works with the mandatory requirements of technical regulations and other regulatory legal acts of project documentation with the requirements for energy conservation and energy efficiency improvement during the construction of a capital construction facility based on the inspection program approved by the Deputy head of the Siberian Department of Rostechnadzor dated 07/12/2016 336 The objectives of this audit are to prevent identify and suppress violations of legislation on urban development by the developer and technical customer including the requirements of the technical regulations of the project documentation, the subject of this audit is the compliance of the work performed and the construction materials used and the results during the construction of the capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation, including the requirements of energy efficiency and the requirements for equipping the capital construction facility with metering devices for energy resources used, the availability of a construction permit, and the fulfillment of the requirements parts 2 and 3 of Article 52 of the Urban Planning Code of the Russian Federation


# 00170802775643
Unscheduled inspection
Start date: 2017-11-27, end date: 2017-12-15, duration:
Authority: Sibirskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: The objectives of this audit are to prevent identify and suppress violations of the legislation on urban development activities committed by the developer and the technical customer, including the requirements of the technical regulations of the project documentation


# 00170802741589
Unscheduled inspection
Start date: 2017-11-13, end date: 2017-12-08, duration:
Authority: Sibirskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: The objectives of this audit are to prevent identify and suppress violations of the legislation on urban development activities committed by the developer and the technical customer, including the requirements of the technical regulations of the project documentation


# 00170802717427
Unscheduled inspection
Start date: 2017-10-16, end date: 2017-11-13, duration:
Authority: Sibirskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: The objectives of this audit are to prevent identify and suppress violations of the legislation on urban development activities committed by the developer and the technical customer, including the requirements of the technical regulations of the project documentation


# 00170802752082
Unscheduled inspection
Start date: 2017-10-30, end date: —, duration:
Authority: Sibirskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection:


# 00170701875842
Unscheduled inspection
Start date: 2017-08-14, end date: —, duration:
Authority: Sibirskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection:


# 00170701853410
Unscheduled inspection
Start date: 2017-08-14, end date: —, duration:
Authority: Sibirskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection:


# 00170701737640
Unscheduled inspection
Start date: 2017-08-14, end date: 2017-09-08, duration:
Authority: Sibirskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: The objectives of this audit are to prevent identify and suppress violations of the legislation on urban development, including technical regulations and project documentation, committed by the developer and the technical customer


# 00170701737606
Unscheduled inspection
Start date: 2017-08-14, end date: 2017-09-08, duration:
Authority: Sibirskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: The objectives of this audit are to prevent identify and suppress violations of the legislation on urban development, including technical regulations and project documentation, committed by the developer and the technical customer


# 00170701741192
Unscheduled inspection
Start date: 2017-08-14, end date: 2017-09-08, duration:
Authority: Sibirskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: The objectives of this audit are to prevent identify and suppress violations of the legislation on urban development, including technical regulations and project documentation, committed by the developer and the technical customer


# 00170701754396
Unscheduled inspection
Start date: 2017-07-03, end date: 2017-07-25, duration:
Authority: Sibirskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: In order to monitor the execution of the instruction on the elimination of identified offenses


# 00170701754352
Unscheduled inspection
Start date: 2017-07-03, end date: 2017-07-25, duration:
Authority: Sibirskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: In order to monitor the execution of the instruction on the elimination of identified offenses


# 00170701754370
Unscheduled inspection
Start date: 2017-07-03, end date: 2017-07-25, duration:
Authority: Sibirskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: In order to monitor the execution of the instruction on the elimination of identified offenses


# 00170701754278
Unscheduled inspection
Start date: 2017-07-03, end date: 2017-07-25, duration:
Authority: Sibirskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: In order to monitor the execution of the instruction on the elimination of identified offenses


# 00170701754031
Unscheduled inspection
Start date: 2017-07-03, end date: 2017-07-25, duration:
Authority: Sibirskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: In order to monitor the execution of the instruction on the elimination of identified offenses


# 00170701754018
Unscheduled inspection
Start date: 2017-07-03, end date: —, duration:
Authority: Sibirskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection:


# 00170701729304
Unscheduled inspection
Start date: 2017-07-26, end date: 2017-08-18, duration:
Authority: Sibirskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: The objectives of this audit are to prevent identify and suppress violations of the legislation on urban development activities committed by the developer and the technical customer, including the requirements of the technical regulations of the project documentation


# 00170701722669
Unscheduled inspection
Start date: 2017-07-26, end date: 2017-08-18, duration:
Authority: Sibirskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: The objectives of this audit are to prevent identify and suppress violations of the legislation on urban development activities committed by the developer and the technical customer, including the requirements of the technical regulations of the project documentation


# 00170701722663
Unscheduled inspection
Start date: 2017-07-26, end date: 2017-08-18, duration:
Authority: Sibirskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: To establish that this inspection is carried out in order to monitor the compliance of completed works with the mandatory requirements of technical regulations and other regulatory legal acts of the project documentation with the requirements for energy conservation and energy efficiency improvement during the construction of a capital construction facility. The objectives of this inspection are to prevent identify and suppress violations of legislation on urban development by the developer and technical customer, including the requirements of technical regulations of the project documentation


# 00170701722658
Unscheduled inspection
Start date: 2017-07-26, end date: —, duration:
Authority: Sibirskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection:


# 00170701729214
Unscheduled inspection
Start date: 2017-06-26, end date: 2017-07-21, duration:
Authority: Sibirskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: The objectives of this audit are to prevent identify and suppress violations of the legislation on urban development activities committed by the developer and the technical customer, including the requirements of the technical regulations of the project documentation


# 00170701546561
Unscheduled inspection
Start date: 2017-05-15, end date: 2017-06-09, duration:
Authority: Sibirskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Objective to monitor the compliance of completed works with the mandatory requirements of technical regulations and other regulatory legal acts of project documentation with the requirements for energy conservation and energy efficiency improvement during the construction of a capital construction facility. The task is to prevent the identification and suppression of violations of legislation on urban development by the developer and technical customer, including the requirements of technical regulations for project documentation. The subject is to ensure that the work performed and the construction materials used, as well as the results of such work, comply with the requirements of technical regulations project documentation, including the requirements for energy efficiency and the requirements for equipping a capital construction facility with metering devices for used energy resources, the availability of a construction permit, and compliance with the requirements of parts 2 and 3 of Article 52 of the Urban Planning Code of the Russian Federation


# 00170701422944
Unscheduled inspection
Start date: 2017-03-03, end date: 2017-03-31, duration:
Authority: Sibirskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: To establish that this audit is carried out in order to monitor the compliance of completed works with the mandatory requirements of technical regulations and other regulatory legal acts of project documentation with the requirements for energy conservation and energy efficiency improvement during the reconstruction of a capital construction facility. The objectives of this audit are to prevent identify and suppress violations of legislation on urban development by the developer and technical customer, including the requirements of technical regulations of project documentation


# 00170701422793
Unscheduled inspection
Start date: 2017-03-03, end date: 2017-03-31, duration:
Authority: Sibirskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: To establish that this audit is carried out in order to monitor the compliance of completed works with the mandatory requirements of technical regulations and other regulatory legal acts of project documentation with the requirements for energy conservation and energy efficiency improvement during the reconstruction of a capital construction facility. The objectives of this audit are to prevent identify and suppress violations of legislation on urban development by the developer and technical customer, including the requirements of technical regulations of project documentation


# 00170701421767
Unscheduled inspection
Start date: 2017-03-03, end date: 2017-03-31, duration:
Authority: Sibirskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: To establish that this audit is carried out in order to monitor the compliance of completed works with the mandatory requirements of technical regulations and other regulatory legal acts of project documentation with the requirements for energy conservation and energy efficiency improvement during the reconstruction of a capital construction facility. The objectives of this audit are to prevent identify and suppress violations of legislation on urban development by the developer and technical customer, including the requirements of technical regulations of project documentation


# 00170701421766
Unscheduled inspection
Start date: 2017-03-03, end date: 2017-03-31, duration:
Authority: Sibirskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: To establish that this audit is carried out in order to monitor the compliance of completed works with the mandatory requirements of technical regulations and other regulatory legal acts of project documentation with the requirements for energy conservation and energy efficiency improvement during the reconstruction of a capital construction facility. The objectives of this audit are to prevent identify and suppress violations of legislation on urban development by the developer and technical customer, including the requirements of technical regulations of project documentation


# 00170701421765
Unscheduled inspection
Start date: 2017-03-03, end date: 2017-03-31, duration:
Authority: Sibirskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: To establish that this audit is carried out in order to monitor the compliance of completed works with the mandatory requirements of technical regulations and other regulatory legal acts of project documentation with the requirements for energy conservation and energy efficiency improvement during the reconstruction of a capital construction facility. The objectives of this audit are to prevent identify and suppress violations of legislation on urban development by the developer and technical customer, including the requirements of technical regulations of project documentation


# 00170701393754
Unscheduled inspection
Start date: 2017-03-03, end date: 2017-03-31, duration:
Authority: Sibirskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: To establish that this inspection is carried out in order to monitor the compliance of completed works with the mandatory requirements of technical regulations and other regulatory legal acts of the project documentation with the requirements for energy conservation and energy efficiency improvement during the reconstruction of a capital construction facility to prevent identify and suppress violations of legislation on urban development by the developer technical customer, including the requirements of technical regulations of the project documentation


# 00170701421776
Unscheduled inspection
Start date: 2017-03-20, end date: 2017-04-14, duration:
Authority: Sibirskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: To establish that this audit is carried out in order to monitor the compliance of completed works with the mandatory requirements of technical regulations and other regulatory legal acts of project documentation with the requirements for energy conservation and energy efficiency improvement during the reconstruction of a capital construction facility. The objectives of this audit are to prevent identify and suppress violations of legislation on urban development by the developer and technical customer, including the requirements of technical regulations of project documentation


# 00170701421774
Unscheduled inspection
Start date: 2017-03-20, end date: —, duration:
Authority:
Purpose of inspection:


# 00170701423073
Unscheduled inspection
Start date: 2017-03-20, end date: 2017-04-14, duration:
Authority: Sibirskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: To establish that this audit is carried out in order to monitor the compliance of completed works with the mandatory requirements of technical regulations and other regulatory legal acts of project documentation with the requirements for energy conservation and energy efficiency improvement during the reconstruction of a capital construction facility. The objectives of this audit are to prevent identify and suppress violations of legislation on urban development by the developer and technical customer, including the requirements of technical regulations of project documentation


# 00170701423035
Unscheduled inspection
Start date: 2017-03-20, end date: 2017-04-14, duration:
Authority: Sibirskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: To establish that this audit is carried out in order to monitor the compliance of completed works with the mandatory requirements of technical regulations and other regulatory legal acts of project documentation with the requirements for energy conservation and energy efficiency improvement during the reconstruction of a capital construction facility. The objectives of this audit are to prevent identify and suppress violations of legislation on urban development by the developer and technical customer, including the requirements of technical regulations of project documentation


# 00170701422988
Unscheduled inspection
Start date: 2017-03-20, end date: 2017-04-14, duration:
Authority: Sibirskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: To establish that this audit is carried out in order to monitor the compliance of completed works with the mandatory requirements of technical regulations and other regulatory legal acts of project documentation with the requirements for energy conservation and energy efficiency improvement during the reconstruction of a capital construction facility. The objectives of this audit are to prevent identify and suppress violations of legislation on urban development by the developer and technical customer, including the requirements of technical regulations of project documentation


# 00170701421773
Unscheduled inspection
Start date: 2017-03-20, end date: 2017-04-14, duration:
Authority: Sibirskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: To establish that this audit is carried out in order to monitor the compliance of completed works with the mandatory requirements of technical regulations and other regulatory legal acts of project documentation with the requirements for energy conservation and energy efficiency improvement during the reconstruction of a capital construction facility. The objectives of this audit are to prevent identify and suppress violations of legislation on urban development by the developer and technical customer, including the requirements of technical regulations of project documentation


# 00160701278611
Unscheduled inspection
Start date: 2016-12-20, end date: 2017-01-19, duration:
Authority: Sibirskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: To establish that this inspection is being carried out in order to carry out federal state construction supervision of the capital construction facility "Construction of the Kazan NGKM for full development of the second stage" Stage 4 of construction in accordance with the project documentation "Construction of the Kazan NGKM for full development of the Second stage" located at Tomsk region, Parabelsky district on the basis of a notice from JSC Tomskgazprom on completion 0911522 dated 10102016the objectives of this audit are to prevent identify and suppress violations of urban planning legislation, including technical regulations and project documentation, committed by the developer, the customer, as well as by the person carrying out construction on the basis of a contract with the developer or the customer


# 00160701236530
Unscheduled inspection
Start date: 2016-12-20, end date: 2017-01-19, duration:
Authority: Sibirskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: To establish that this inspection is being carried out in order to carry out federal state construction supervision of the capital construction facility "Construction of the Kazan NGKM for full development of the second stage" Stage 4 of construction in accordance with the project documentation "Construction of the Kazan NGKM for full development of the Second stage" located at Tomsk region, Parabelsky district on the basis of a notice from JSC Tomskgazprom on completion 0911522 dated 10102016the objectives of this audit are to prevent identify and suppress violations of urban planning legislation, including technical regulations and project documentation, committed by the developer, the customer, as well as by the person carrying out construction on the basis of a contract with the developer or the customer


# 00160701146434
Unscheduled inspection
Start date: 2016-11-28, end date: 2016-12-23, duration:
Authority: Sibirskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: objectives monitoring the compliance of completed works with the mandatory requirements of technical regulations and other regulatory legal acts of project documentation requirements for energy conservation and energy efficiency improvement tasks prevention detection and suppression of violations of legislation on urban development by the developer and technical customer, including the requirements of technical regulations of project documentationsubject compliance of work performed and applied building materials as well as the results of such work with the requirements of technical regulations of project documentation This includes the requirements of energy efficiency and the requirements for equipping a capital construction facility with metering devices for used energy resources, the availability of a construction permit, and compliance with the requirements of parts 2 and 3 of Article 52 of the Urban Planning Code of the Russian Federation.


# 00160700983333
Unscheduled inspection
Start date: 2016-10-10, end date: 2016-10-12, duration:
Authority: Sibirskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: The objectives of checking the implementation of the previously issued regulation 332PTES27 dated 05082016, signed by JSC Tomskgazprom BX 41318695 dated 29092016, the objectives of the audit are the implementation of federal state energy supervision in the field of electric power industry, the subject of the audit is the implementation of the regulations of state control bodies and municipal control bodies


# 00160700915468
Unscheduled inspection
Start date: 2016-10-10, end date: 2016-10-28, duration:
Authority: Sibirskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: To establish that this audit is being conducted in order to verify that the legal entity has eliminated the points of violations identified in the Order of the Siberian Directorate of Rostechnadzor 37ND2016025 dated 29072016


# 00160700061596
Unscheduled inspection
Start date: 2016-08-29, end date: 2016-08-31, duration:
Authority: Sibirskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: verification of compliance with the previously issued regulation 332PTES29 dated 09082016. The objectives of this audit are the implementation of federal state energy supervision in the field of electric power industry


# 00160700040785
Unscheduled inspection
Start date: 2016-08-15, end date: —, duration:
Authority:
Purpose of inspection:


# 00160601675874
Unscheduled inspection
Start date: 2016-06-20, end date: 2016-06-30, duration:
Authority: Sibirskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Control of the execution of regulation 37ND2015093 dated 11/12/2015


# 00160601614060
Unscheduled inspection
Start date: 2016-05-10, end date: 2016-06-06, duration:
Authority: Obskoe upravlenie gosudarstvennogo rechnogo nadzora Federalnoi sluzhby po nadzoru v sfere transporta
Purpose of inspection: verification of compliance with the regulation on the elimination of violations from 30102015


# 00150601427350
Unscheduled inspection
Start date: 2015-12-21, end date: 2016-01-25, duration:
Authority: Sibirskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: implementation of state construction supervision


# 00150601236198
Unscheduled inspection
Start date: 2015-09-01, end date: —, duration:
Authority: Sibirskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: execution of the Order of the Federal Service for Environmental Technological and Nuclear Supervision "On monitoring the progress of preparation of electric power and Heat supply enterprises for operation in the autumn-winter period 20152016" 237 dated 23062015 issued pursuant to the minutes of the meeting of the Government of the Russian Federation dated 2105201519 and the instructions of the Deputy Chairman of the Government of the Russian Federation DN Kozak dated 11062015 DKP93853


# 00150601438950
Unscheduled inspection
Start date: 2015-09-01, end date: —, duration:
Authority: Sibirskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection:


# 00150600058698
Unscheduled inspection
Start date: 2015-06-23, end date: —, duration:
Authority:
Purpose of inspection:


# 00150600057643
Unscheduled inspection
Start date: 2015-06-23, end date: —, duration:
Authority: Sibirskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection:


# 422100154028
Unscheduled inspection
Start date: 2021-05-11, end date: 2021-06-01, duration: 20
Authority: Sibirskoe upravlenie Federalnoi sluzhby po ekologicheskomu, tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Based on the Notice of Gazprom Dobycha Tomsk JSC on the completion of construction (reconstruction) of the capital construction facility dated 04/07/2021 No. 09/1-518 (ex. dated 04/08/2021 No. 344/3786). The purpose of this audit is to prevent, identify and suppress violations of urban planning legislation and project documentation committed by the developer, the customer, as well as by the person carrying out construction on the basis of a contract with the developer or the customer. The subject of this audit is to verify the compliance of the work performed and the construction materials used during the construction of the capital construction facility "Arrangement of Pinginsky NM. Well cluster No. 3bis", as well as the results of such work to the requirements of the project documentation approved in accordance with Parts 15, 15_2 and 15_3 of Article 48 of the Urban Planning Code of the Russian Federation (subject to changes made to the project documentation in accordance with Parts 3_8 and 3_9 of Article 49 of the Urban Planning Code of the Russian Federation) and (or) the information model (if the formation and maintenance of an information model are mandatory in accordance with the requirements of the Urban Planning Code of the Russian Federation), including energy efficiency requirements (with the exception of capital construction facilities to which energy efficiency requirements do not apply) and requirements for equipping the capital construction facility with metering devices for used energy resources; availability of a construction permit; fulfillment of requirements established by parts 2, 3 and 3_1 of Article 52 of the Urban Planning Code of the Russian Federation.


# 702100172422
Unscheduled inspection
Start date: 2021-04-20, end date: —, duration: 20
Authority: Gosudarstvennaya inspekciya truda v Tomskoi oblasti
Purpose of inspection: Implementation of federal state supervision over compliance by a legal entity or individual entrepreneur with the mandatory requirements of labor legislation and other regulatory legal acts containing labor law norms, The objectives of this audit are to ensure compliance with and protection of labor rights and freedoms of citizens, including the right to safe working conditions. The subject of this audit is compliance with mandatory requirements and/or requirements established by municipal legal acts.


# 542100145507
Unscheduled inspection
Start date: 2021-04-14, end date: 2021-05-13, duration: 20
Authority: Sibirskoe mezhregionalnoe upravlenie Federalnoi sluzhby po nadzoru v sfere prirodopolzovaniya
Purpose of inspection: - this inspection is carried out in order to: monitor the implementation of the instruction issued by Gazprom Dobycha Tomsk JSC on the elimination of identified violations of mandatory requirements dated 09/21/2020 No. NWATR-912 (clause 1. Take measures to develop, coordinate and organize work on the implementation of measures during periods of NMU for a category I negative impact facility (facility code - 69-0170-001003-P) Pinjinskoye oil field), due until 04/01/2021 (inclusive); - The objectives of this audit are to ensure that Gazprom Dobycha Tomsk complies with the mandatory requirements of the Federal Law on Atmospheric Air Protection.


# 422000177805
Unscheduled inspection
Start date: 2021-04-29, end date: 2020-06-22, duration: 20
Authority: Sibirskoe upravlenie Federalnoi sluzhby po ekologicheskomu, tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This inspection is carried out in order to implement the Inspection Program approved by Deputy Head of the Siberian Department of Rostechnadzor D.V. Kolegov dated 12/14/2020 No. 336. The purpose of this inspection is to prevent, identify and suppress violations of legislation on urban planning and design activities committed by the developer, the customer, as well as by the person carrying out construction on the basis of a contract with the developer or the customer. documentation. 7. The subject of this audit is to verify the compliance of the work performed and the construction materials used during the construction of the capital construction facility "Terminal for the storage and shipment of a propane-butane technical (SPBT) mixture in the Kuibyshev area", as well as the results of such work with the requirements approved in accordance with parts 15, 15_2 and 15_3 of Article 48 of the Urban Planning Code of the Russian Federation project documentation (taking into account the changes made to the project documentation in accordance with Parts 3_8 and 3_9 of Article 49 of the Urban Planning Code of the Russian Federation) and (or) the information model (if the formation and maintenance of the information model are mandatory in accordance with the requirements of the Urban Planning Code of the Russian Federation), including the requirements of the energy efficiency (with the exception of capital construction facilities, which are not subject to energy efficiency requirements) and the requirements for equipping the capital construction facility with metering devices for energy resources used; availability of a construction permit; and compliance with the requirements established by parts 2, 3, and 3_1 of Article 52 of the Urban Planning Code of the Russian Federation.


# 422100153989
Unscheduled inspection
Start date: 2021-04-26, end date: 2021-05-14, duration: 13
Authority: Sibirskoe upravlenie Federalnoi sluzhby po ekologicheskomu, tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: To establish that this inspection is carried out on the basis of the Notice of Gazprom Dobycha Tomsk JSC on the completion of the construction of the capital construction facility dated 04/01/2021 No. 09/1-472 (ex. No. 344/3551 dated 04/05/2021). The purpose of this inspection is to prevent, identify and suppress violations committed by the developer, the customer, as well as the person carrying out construction on based on an agreement with the developer or the customer, violations of the legislation on urban planning activities, and project documentation.


# 422100091212
Unscheduled inspection
Start date: 2021-03-25, end date: 2021-03-29, duration: 3
Authority: Sibirskoe upravlenie Federalnoi sluzhby po ekologicheskomu, tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: In order to monitor the implementation of the order of the Siberian Directorate of Rostechnadzor dated 03/09/2021 No. T-25-21-33 on the elimination of identified offenses, the deadline for which has expired. The objectives of this audit are to prevent, identify and suppress violations of the legislation on urban development, including project documentation, committed by the developer, the customer, as well as by the person carrying out construction on the basis of a contract with the developer or the customer (contractor). The subject of this audit is: compliance with the regulations of the federal state construction supervision authorities.


# 422100044340
Unscheduled inspection
Start date: 2021-03-25, end date: 2021-04-21, duration: 20
Authority: Sibirskoe upravlenie Federalnoi sluzhby po ekologicheskomu, tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Based on the Notice of Gazprom Dobycha Tomsk JSC on the completion of construction (reconstruction) of the capital construction facility dated 02/15/2021 No. 09/1-226 (ex. No. 344/1624 dated 02/15/2021). The purpose of this inspection is to prevent, identify and suppress violations committed by the developer, the customer, as well as the person carrying out construction on the basis of a contract with by the developer or the customer, violations of the legislation on urban planning activities, project documentation. The subject of this audit is to verify the compliance of the work performed and the building materials used during the construction of the capital construction facility "Well Cluster No. 4 of the Ostaninsky NGKM", as well as the results of such work, with the requirements of the project documentation approved in accordance with parts 15, 15_2 and 15_3 of Article 48 of the Urban Planning Code of the Russian Federation (subject to changes made to the project documentation in accordance with Parts 3_8 and 3_9 of Article 49 of the Urban Planning Code of the Russian Federation) and (or) an information model (if the formation and maintenance of an information model are mandatory in accordance with the requirements of the Urban Planning Code of the Russian Federation), including energy efficiency requirements (with the exception of capital construction projects for which energy efficiency requirements they do not apply) and the requirements for equipping the capital construction facility with metering devices for used energy resources; the availability of a construction permit; and compliance with the requirements established by parts 2, 3, and 3_1 of Article 52 of the Urban Planning Code of the Russian Federation.


# 002105266936
Unscheduled inspection
Start date: 2021-01-25, end date: 2021-02-19, duration: 20
Authority: Sibirskoe upravlenie Federalnoi sluzhby po ekologicheskomu, tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: To establish that this inspection is carried out on the basis of the Notice of JSC Tomskgazprom on the completion of the construction of the capital construction facility dated 03.12.2020 No. 09/1-2062 (ex. No. 344/11802 dated 03.12.2020). The purpose of this inspection is to prevent, identify and suppress violations committed by the developer, the customer, as well as the person carrying out construction on the basis of the contract with the developer or the customer, violations of the legislation on urban planning activities, project documentation.


# 002105266909
Unscheduled inspection
Start date: 2021-01-25, end date: 2021-02-19, duration: 20
Authority: Sibirskoe upravlenie Federalnoi sluzhby po ekologicheskomu, tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: To establish that this inspection is carried out on the basis of the Notice of JSC Tomskgazprom on the completion of the construction of the capital construction facility dated 03.12.2020 No. 09/1-2061 (ex. No. 344/11805 dated 03.12.2020). The purpose of this inspection is to prevent, identify and suppress violations committed by the developer, the customer, as well as the person carrying out construction on the basis of the contract with the developer or the customer, violations of the legislation on urban planning activities, project documentation.


# 002105266921
Unscheduled inspection
Start date: 2021-01-25, end date: 2021-02-19, duration: 20
Authority: Sibirskoe upravlenie Federalnoi sluzhby po ekologicheskomu, tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: To establish that this inspection is carried out on the basis of the Notice of JSC Tomskgazprom on the completion of the construction of the capital construction facility dated 03.12.2020 No. 09/1-2063 (ex. No. 344/11803 dated 03.12.2020). The purpose of this inspection is to prevent, identify and suppress violations committed by the developer, the customer, as well as the person carrying out construction on the basis of the contract with the developer or the customer, violations of the legislation on urban planning activities, project documentation.


# 002105301125
Unscheduled inspection
Start date: 2021-01-25, end date: 2021-02-19, duration: 20
Authority: Sibirskoe upravlenie Federalnoi sluzhby po ekologicheskomu, tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: In order to implement the Inspection Program approved by Deputy Head of the Siberian Department of Rostechnadzor D.V. Kolegov dated 09.10.2020 № T-445. The purpose of this audit is to prevent, identify and suppress violations of urban planning legislation and project documentation committed by the developer, the customer, and the person carrying out construction on the basis of a contract with the developer or the customer. The subject of this audit is to verify the compliance of the work performed and the construction materials used during the construction of the capital construction facility "Well Cluster No. 39 of the Kazan NGKM with a gas reduction unit", as well as the results of such work, with the requirements of the project documentation approved in accordance with Parts 15, 15_2 and 15_3 of Article 48 of the Urban Planning Code of the Russian Federation (as amended, included in the project documentation in accordance with Parts 3_8 and 3_9 of Article 49 of the Urban Development Code of the Russian Federation) and (or) the information model (if the formation and maintenance of the information model are mandatory in accordance with the requirements of the Urban Development Code of the Russian Federation), including energy efficiency requirements (with the exception of capital construction facilities, on energy efficiency requirements do not apply) and the requirements for equipping a capital construction facility with metering devices for used energy resources; the availability of a construction permit; and compliance with the requirements established by parts 2, 3, and 3_1 of Article 52 of the Urban Planning Code of the Russian Federation.


# 002105281906
Unscheduled inspection
Start date: 2021-01-25, end date: 2021-02-19, duration: 20
Authority: Sibirskoe upravlenie Federalnoi sluzhby po ekologicheskomu, tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Based on the Notice of JSC Tomskgazprom on the completion of the construction of the capital construction facility dated 08.12.2020 No. 09/1-2096 (ex. No. 344/12198 dated 09.12.2020). The purpose of this audit is to prevent, identify and suppress violations committed by the developer, the customer, as well as the person carrying out construction on the basis of a contract with the developer or the customer legislation on urban planning activities, project documentation. The subject of this audit is to verify the compliance of the work performed and the construction materials used during the construction of the capital construction facility "Kazan NGKM Development for full development. Bushes No. 9, 19, 16, 16bis. 5 stage", as well as the results of such work to the requirements of the project documentation approved in accordance with parts 15, 15_2 and 15_3 of Article 48 of the Urban Planning Code of the Russian Federation (subject to changes made to the project documentation in accordance with Parts 3_8 and 3_9 of Article 49 of the Urban Planning Code of the Russian Federation of the Russian Federation) and (or) an information model (if the formation and maintenance of an information model are mandatory in accordance with the requirements of the Urban Planning Code of the Russian Federation), including energy efficiency requirements (with the exception of capital construction facilities to which energy efficiency requirements do not apply) and the requirements for equipping the capital construction facility with metering devices used energy resources; availability of a building permit; compliance with the requirements established by parts 2, 3 and 3_1 of Article 52 of the Urban Planning Code of the Russian Federation.


# 002105266929
Unscheduled inspection
Start date: 2021-01-25, end date: 2021-02-19, duration: 20
Authority: Sibirskoe upravlenie Federalnoi sluzhby po ekologicheskomu, tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: To establish that this inspection is carried out on the basis of the Notice of JSC Tomskgazprom on the completion of the construction of the capital construction facility dated 03.12.2020 No. 09/1-2064 (ex. No. 344/11804 dated 03.12.2020). The purpose of this inspection is to prevent, identify and suppress violations committed by the developer, the customer, as well as the person carrying out construction on the basis of the contract with the developer or the customer, violations of the legislation on urban planning activities, project documentation.


# 002004498739
Unscheduled inspection
Start date: 2020-08-24, end date: 2020-08-27, duration: 4
Authority: Sibirskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: the real test is conducted on the basis of the notice of joint stock company "Tomskgazprom" about the end of reconstruction of capital construction object from 14082020 g 0911078 3419522 from 14082020 Rin g the purpose of this check is to prevent detection and suppression approved developer by the customer and a person engaged in construction on the basis of the contract with the Builder or customer of violations of the legislation on town-planning project документации7 the Subject of this test is to verify compliance of work and construction materials used in the process of reconstruction of capital construction object "Step 4 Reconstruction of the main gas pipeline "Omsknovosibirsk" diameter 1220mm km 3347 at the intersection with highway design category IIIB to the object "Terminal for storage and shipment of a mixture of propanebutane technical LPG in the region g Kuibyshev" as well as the results of such work requirements approved in accordance with parts 15 and 15_2 15_3 of article 48 of the town planning code of the Russian Federation project documentation to reflect changes made to the project documentation in accordance with paragraphs 3_8 and 3_9 article 49 of the town planning code of the Russian Federation or of the information model in the case of the formation and maintenance of information models are required in accordance with the requirements of the town planning code of the Russian Federation including the energy efficiency standards with the exception of capital construction objects, for which the energy performance requirements shall not apply and the requirements of the equipment of a capital construction object metering devices of energy resources to the presence of a building permit requirements established in parts 2 and 3 3_1 of article 52 of the town planning code of the Russian Federation


# 002004446019
Unscheduled inspection
Start date: 2020-07-27, end date: 2020-08-21, duration: 20
Authority: Sibirskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: To establish that this inspection is carried out on the basis of the Notice of JSC Tomskgazprom on the completion of the construction of a capital construction facility dated 17062020 092434 bx 3445552 dated 17062020, the purpose of this inspection is to prevent identify and suppress violations of legislation on urban development activities and project documentation committed by the developer, the customer, as well as the person carrying out construction on the basis of a contract with the developer or the customer


Information about inspections

This section displays information about planned and carried out inspections of control (supervision) bodies in accordance with Federal Law No. 294-FZ. Detailed information about the inspection can be obtained from the Unified Register of Inspections of the Prosecutor General's Office.