# 522100247794
Unscheduled inspection
Start date: 2021-06-01, end date: —, duration: —
Authority: —
Purpose of inspection:
# 522105336505
Unscheduled inspection
Start date: 2021-02-02, end date: 2021-02-05, duration: 4
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Nizhegorodskoi oblasti
Purpose of inspection: The inspection is carried out on the basis of a notice on the elimination of violations during the construction of a capital construction facility (vh No. 519-438025/20 dated 11/23/2020), in order to verify compliance with the requirements of the regulations dated 10/29/2020 No. 519-03/02-04/16 , dated 10/29/2020 № 519-03/02-04/17 issued by Liga LLC, as well as on the basis of an approved inspection program for the capital construction project, in order to assess the compliance of the work performed and the construction materials used during the construction process, as well as the results of such work, with the requirements of the approved design documentation, including energy efficiency requirements (with the exception of capital construction facilities, which are not subject to energy efficiency requirements) and the requirements for equipping the capital construction facility with metering devices for the energy used resources, the availability of a construction permit, and compliance with the requirements set out in parts 2, 3, and 3.1 of Article 52 of the Urban Planning Code of the Russian Federation, including during the construction stages (installation of structures of the underground part, installation of monolithic structures of the aboveground part (columns, floors, stairs).
The task of the audit is to monitor compliance with the requirements of urban planning legislation and approved project documentation.
# 522004290317
Unscheduled inspection
Start date: 2020-02-18, end date: 2020-02-20, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Nizhegorodskoi oblasti
Purpose of inspection: the inspection is carried out on the basis of notices from MCU Glavux Vnovgoroda on the completion of the construction of the capital construction facility vh 5194044120 from 05022020 LLC "League" on the elimination of violations during the construction of the capital construction facility vh 5194746320 from 10022020, as well as to verify compliance with the requirements of the regulations from 27122019 519030104216 from 17012020 51903010405 issued to the person carrying out the construction of LLC "League" in order to assess compliance of the work performed and the construction materials used during the construction process, as well as the results of such work, with the requirements of the approved design documentation, including energy efficiency requirements, with the exception of capital construction facilities for which energy efficiency requirements do not apply, and with the requirements for equipping the capital construction facility with metering devices for energy resources used, the availability of a construction permit, and compliance with the requirements set out in Parts 2, 3, and 31 Article 52 of the Urban Planning Code of the Russian FederationThe task of verification is monitoring compliance with the requirements of urban planning legislation and approved project documentation
# 521904039492
Unscheduled inspection
Start date: 2019-12-04, end date: 2019-12-06, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Nizhegorodskoi oblasti
Purpose of inspection: the inspection is carried out on the basis of the approved inspection program for the capital construction facility in order to verify compliance with the requirements of the regulation dated 25102019 519030104149 issued to the person carrying out the construction of Liga LLC to assess the compliance of work performed and construction materials used during construction, as well as the results of such work with the requirements of approved design documentation, including energy efficiency requirements, with the exception of capital construction facilities on which energy efficiency requirements do not apply to the requirements for equipping a capital construction facility with metering devices for used energy resources, the availability of a construction permit, the fulfillment of the requirements established by parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation, including during the construction phase landscaping of the territory, the installation of farm buildings, the installation of internal engineering networks, the task of verification, monitoring compliance with the requirements of urban planning legislation and approved project documentation
# 521903858164
Unscheduled inspection
Start date: 2019-10-23, end date: 2019-10-25, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Nizhegorodskoi oblasti
Purpose of inspection: The inspection is carried out on the basis of an approved inspection program for the capital construction facility, as well as in order to verify compliance with the requirements of regulation No. 04072019 519030104103 issued to the general contractor of Liga LLC to assess the compliance of work performed and construction materials used during construction, as well as the results of such work, with the requirements of design documentation, including energy efficiency requirements, with the exception of capital construction facilities on the requirements of energy efficiency do not apply to the requirements for equipping a capital construction facility with metering devices for used energy resources, the availability of a construction permit, the fulfillment of the requirements established by parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation, including during the construction phase, the installation of external networks of engineering and technical support, the task of verification, control over compliance with the requirements of urban planning legislation and design documentation
# 521902761504
Unscheduled inspection
Start date: 2019-07-02, end date: —, duration: —
Authority: —
Purpose of inspection:
# 521902611181
Unscheduled inspection
Start date: 2019-04-03, end date: 2019-04-08, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Nizhegorodskoi oblasti
Purpose of inspection: The inspection is carried out on the basis of notices from Liga LLC on the elimination of violations during the construction of a capital construction facility dated 28022019 bx 5195288219 5195289919 of the approved inspection program for the capital construction facility, as well as in order to verify compliance with the requirements of regulations dated 01022019 51903020407 51903020408 issued to the general contractor Liga LLC for assessing the conformity of work performed and building materials used during construction and as well as the results of such work, the requirements of the design documentation, including energy efficiency requirements, with the exception of capital construction facilities for which energy efficiency requirements do not apply, and the requirements for equipping the capital construction facility with metering devices for used energy resources, the availability of a construction permit, and compliance with the requirements established by parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation, including when performing the following stages: construction excavation excavation excavation installation of a zero-cycle structure The task of verification is to monitor compliance with the requirements of urban planning legislation and project documentation
# 521800574043
Unscheduled inspection
Start date: 2018-07-25, end date: 2018-07-27, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Nizhegorodskoi oblasti
Purpose of inspection: the inspection is carried out on the basis of the Liga LLC notification on the elimination of violations during the construction of the capital construction facility bx4303 dated 05072018, the approved inspection program for the capital construction facility, as well as in order to verify compliance with the requirements of the instruction dated 04062018 51903020459 issued to the general contractor Liga LLC to assess the compliance of work performed and building materials used during construction with the requirements of technical regulations and standards and the rules and design documentation, including during the construction stages installation of pipelines wells shut-off valves power supply of the KNS installation of the foundations of the KNS dam construction The task of verification is to monitor compliance with the requirements of urban planning legislation and other regulatory legal acts in the field of construction
# 52170701795454
Unscheduled inspection
Start date: 2017-07-18, end date: 2017-07-19, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Nizhegorodskoi oblasti
Purpose of inspection: The inspection is carried out on the basis of notices from Liga LLC on the elimination of violations during the construction of a capital construction facility bx 2888 2889 2890 dated 30062017 in order to verify compliance with the requirements of regulations dated 24042017 51903030304012 51903030304011 dated 19062017 51903030304016 issued to the contractor Liga LLC for assessing the compliance of work performed and building materials used during construction with the requirements of technical regulations, norms and rules and project documentationthe task of verification is to monitor compliance with the requirements of urban planning legislation and other regulatory legal acts in the field of construction