# 741904036183
Unscheduled inspection
Start date: 2019-12-04, end date: 2019-12-10, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work on the installation of internal engineering systems, facades, finishing works and building materials used during the construction reconstruction of a capital construction facility, as well as the results of such work, with the requirements of the design documentation approved in accordance with Parts 15 152 and 153 of Article 48 of this Code, taking into account the changes made to the design documentation in accordance with parts 38 and 39 of Article 49 of this Code and or an information model, if the formation and maintenance of an information model are mandatory in accordance with the requirements of this Code, including energy efficiency requirements, with the exception of capital construction facilities to which energy efficiency requirements do not apply, and the requirements for equipping the capital construction facility with metering devices for used energy resources 2 Availability of a construction permit 3 Compliance with the requirements hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 741903688266
Unscheduled inspection
Start date: 2019-10-02, end date: —, duration: —
Authority: —
Purpose of inspection:
# 741902682984
Unscheduled inspection
Start date: 2019-04-29, end date: —, duration: —
Authority: —
Purpose of inspection:
# 741802343701
Unscheduled inspection
Start date: 2018-12-28, end date: 2019-01-11, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 The compliance of the work on the 4th stage of construction with the installation of tanker truck discharge sites for an integrated LPG system the installation of a canopy the installation of LPG tanks the installation of sewage treatment plants the construction of a power transmission line and the construction materials used during the construction of a capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation 2 The availability of a construction permit 3 The fulfillment of the requirements of hh 23 and 31 st52 The Urban Planning Code of the Russian Federation
# 741802148517
Unscheduled inspection
Start date: 2018-11-27, end date: 2018-12-03, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work on the 2nd and 3rd stage excavation foundation construction grounding and lightning protection landscaping work 2nd 3rd 4th stages and the construction materials used during the construction of the capital construction facility as well as the results of such work with the requirements of the technical regulations of the project documentation 2 Availability of a building permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 741802021577
Unscheduled inspection
Start date: 2018-10-31, end date: —, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection:
# 741800250087
Unscheduled inspection
Start date: 2018-04-06, end date: 2018-04-12, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work on the 1st stage of earthworks, the installation of foundations for grounding and lightning protection and the construction materials used during the construction of a capital construction facility, as well as the results of such work, with the requirements of technical regulations and project documentation 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation