Found 3 inspections:

# 742004306359
Unscheduled inspection
Start date: 2020-02-28, end date: —, duration:
Authority:
Purpose of inspection:


# 741904127996
Unscheduled inspection
Start date: 2019-12-26, end date: 2020-01-09, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of finishing works, installation of windows, doors, installation of exterior porches and canopies of signage, installation of internal engineering networks, Verification of compliance with sanitary and epidemiological requirements and fire safety of building materials used during construction, reconstruction of a capital construction facility, as well as the results of such work, with the requirements of the project documentation approved in accordance with parts 15 152 and 153 of Article 48 of the Urban Planning Code of the Russian Federation subject to the changes made to the project documentation in accordance with parts 38 and 39 of Article 49 of the Urban Development Code of the Russian Federation and or the information model, if the formation and maintenance of the information model are mandatory in accordance with the requirements of the Urban Development Code of the Russian Federation, including energy efficiency requirements, with the exception of capital construction projects to which energy efficiency requirements do not apply, and equipment of the capital construction facility with metering devices for used energy resources 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation


# 741903990969
Unscheduled inspection
Start date: 2019-11-25, end date: 2019-11-29, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work on the foundations and basin of the pool with the construction materials used during the construction reconstruction of the capital construction facility, as well as the results of such work, with the requirements of the project documentation approved in accordance with parts 15 152 and 153 of Article 48 of the Urban Planning Code, taking into account the changes made to the project documentation in accordance with parts 38 and 39 of Article 49 of the Urban Planning Code and or an information model if the formation and maintenance of an information model are mandatory in accordance with the requirements of this Code, including energy efficiency requirements, with the exception of capital construction facilities for which energy efficiency requirements do not apply and the requirements for equipping the capital construction facility with metering devices for energy resources used2 The availability of a construction permit3 Compliance with the requirements of hh 23 and 31 st52 Urban Planning the Code of the Russian Federation