# 001902566974
Unscheduled inspection
Start date: 2019-03-25, end date: 2019-03-27, duration: —
Authority: Uralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This inspection is carried out as part of the control and supervision of compliance with industrial safety requirements in the design, construction, operation, conservation and liquidation of hazardous production facilities, manufacture, installation, commissioning, maintenance and repair of technical devices used at hazardous production facilities for compliance with the requirements of the technical regulations of the Customs Union "On the Safety of Machinery and Equipment" approved by the Decision of the Customs Union Commission of October 18, 2011 823
# 742101078681
Unscheduled inspection
Start date: 2021-10-06, end date: —, duration: —
Authority: —
Purpose of inspection:
# 742100672925
Unscheduled inspection
Start date: 2021-09-14, end date: —, duration: —
Authority: —
Purpose of inspection:
# 742100515245
Unscheduled inspection
Start date: 2021-08-27, end date: —, duration: —
Authority: —
Purpose of inspection:
# 742100383349
Unscheduled inspection
Start date: 2021-07-30, end date: —, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection:
# 742100337618
Unscheduled inspection
Start date: 2021-07-09, end date: 2021-07-15, duration: 5
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1. Compliance of work on the installation of load-bearing and enclosing structures (external and internal wall panels, floor slabs, stairwell and elevator shafts, sanitary cabins, ventilation units) of 8-10 floors in block sections of residential buildings BS-1, BS-2, BS-3 in axes “1-4”, pile driving, installation the monolithic foundation slab in the block section of the BS-4 residential building in the “4-5” axes and the building materials used during the construction, reconstruction of the capital construction facility, as well as the results of such work, meet the requirements of the design documentation approved in accordance with Parts 15, 15.2 and 15.3 of Article 48 of this Code (subject to changes made to the design documentation documentation in accordance with Parts 3.8 and 3.9 of Article 49 of this Code) and (or) an information model (if the formation and maintenance of an information model are mandatory in accordance with the requirements of this Code), including energy efficiency requirements (with the exception of capital construction facilities to which energy efficiency requirements do not apply) and the requirements for equipping the capital construction facility with metering devices for used energy resources. 2. Availability of a building permit. 3. Compliance with the requirements of Parts 2.3 and 3.1 of art.52 of the Urban Planning Code of the Russian Federation.
# 742100277011
Unscheduled inspection
Start date: 2021-06-15, end date: 2021-06-21, duration: 5
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1. Compliance with the installation of load-bearing and enclosing structures (external and internal wall panels, floor slabs, stairwell shafts, sanitary cabins, ventilation units) of floors 4-7 before the start of installation of load-bearing and enclosing structures of the 8th floor in block sections of residential buildings BS-1, BS-2, BS-3 in axes “1-4" and the construction materials used during the construction, reconstruction of the capital construction facility, as well as the results of such work, according to the requirements of the project documentation approved in accordance with Parts 15, 15.2 and 15.3 of Article 48 of this Code (subject to changes made to the project documentation in accordance with parts 3.8 and 3.9 of Article 49 of this Code) and (or) an information model (if the formation and maintenance of an information model are mandatory in accordance with the requirements of this Code), including energy efficiency requirements (with the exception of capital construction facilities to which energy efficiency requirements do not apply) and requirements for equipping the capital construction facility with metering devices for used energy resources. 2. Availability of a building permit. 3. Meeting the requirements of Parts 2.3 and 3.1 of art. 52 of the Urban Planning Code of the Russian Federation.
# 742100210413
Unscheduled inspection
Start date: 2021-05-18, end date: 2021-05-24, duration: 5
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1. Compliance of the work on the installation of load-bearing structures of floors 1-3 (external and internal walls, floors) before the installation of load-bearing and enclosing structures of the 4th floor in the block sections of the residential building BS-1, BS-2, BS-3 in the axes “1-4” and the building materials used during construction, reconstruction of the capital construction facility, as well as the results of such work, to the requirements of the project documentation approved in accordance with Parts 15, 15.2 and 15.3 of Article 48 of this Code (subject to changes made to the project documentation in accordance with parts 3.8 and 3.9 of Article 49 of this Code) and (or) the information model (if the formation of and the maintenance of an information model are mandatory in accordance with the requirements of this Code), including energy efficiency requirements (with the exception of capital construction facilities to which energy efficiency requirements do not apply) and requirements for equipping a capital construction facility with metering devices for used energy resources. 2. Verification of the execution of the order dated 02/15/2021, due on 03/03/2021 3. Availability of a building permit. 4. Meeting the requirements of Parts 2.3 and 3.1 of art. 52 of the Urban Planning Code of the Russian Federation.
# 742100185958
Unscheduled inspection
Start date: 2021-05-11, end date: 2021-05-17, duration: 5
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1. Compliance with the work on the installation of hinged ventilated facades of the stylobate in the arch. the axes “2/3–7" and the construction materials used during the construction, reconstruction of the capital construction facility, as well as the results of such work, meet the requirements of the project documentation approved in accordance with Parts 15, 15.2 and 15.3 of Article 48 of this Code (subject to changes made to the project documentation in accordance with parts 3.8 and 3.9 of Article 49 of this Code and (or) an information model (if the formation and maintenance of an information model are mandatory in accordance with the requirements of this Code), including energy efficiency requirements (with the exception of capital construction facilities to which energy efficiency requirements do not apply) and requirements for equipping the capital construction facility with metering devices for energy resources used. 2. Availability of a building permit. 3. Meeting the requirements of Parts 2.3 and 3.1 of art. 52 of the Urban Planning Code of the Russian Federation.
# 742100181117
Unscheduled inspection
Start date: 2021-04-30, end date: 2021-05-07, duration: 5
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1. Compliance of work on horizontal and vertical waterproofing of foundations, backfilling of excavation sinuses, installation of supporting structures of the ground floor (exterior and interior walls, floors) before the installation of exterior and interior wall panels of the 1st floor in block sections of residential buildings BS-1, BS-2, BS-3 in axes “1-4" and the construction materials used during the construction, reconstruction of the capital construction facility, as well as the results of such work, according to the requirements of the project documentation approved in accordance with Parts 15, 15.2 and 15.3 of Article 48 of this Code (subject to changes made to the project documentation in accordance with parts 3.8 and 3.9 of Article 49 of this Code) and (or) an information model (if the formation and maintenance of an information model are mandatory in accordance with the requirements of this Code), including energy efficiency requirements (with the exception of capital construction facilities to which energy efficiency requirements do not apply) and requirements for equipping the capital construction facility with metering devices for used energy resources. 2. Availability of a building permit. 3. Compliance with the requirements of Parts 2.3 and 3.1 of art.52 of the Urban Planning Code of the Russian Federation.
# 742100105186
Unscheduled inspection
Start date: 2021-04-02, end date: —, duration: —
Authority: —
Purpose of inspection:
# 742100092392
Unscheduled inspection
Start date: 2021-03-30, end date: 2021-04-05, duration: 5
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1. Compliance of work on the construction of a pile field, concreting monolithic grillings for block sections of a residential building BS-1, BS-2, BS-3 in the “1-4” axes and the construction materials used during construction, reconstruction of a capital construction facility, as well as the results of such work with the requirements approved in accordance with parts 15, 15.2 and 15.3 of Article 48 of this Code of the project documentation (subject to changes made to the project documentation in accordance with parts 3.8 and 3.9 of Article 49 of this Code) and (or) the information model (if the formation and maintenance of the information model are mandatory in accordance with the requirements of this Code), including energy efficiency requirements (with the exception of capital construction facilities, to which energy efficiency requirements do not apply) and the requirements for equipping a capital construction facility with metering devices for used energy resources. 2. Availability of a building permit. 3. Meeting the requirements of Parts 2.3 and 3.1 of art. 52 of the Urban Planning Code of the Russian Federation.
# 742105352519
Unscheduled inspection
Start date: 2021-02-09, end date: 2021-02-15, duration: 5
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1. Compliance of work on the breakdown of building axes, excavation design, foundation design, compliance with fire protection measures for block sections of residential buildings BS-1, BS-2, BS-3 in axes 1-4” and the construction materials used during construction, reconstruction of the capital construction facility, as well as the results of such work with the requirements of the approved in accordance with parts 15, 15.2 and 15.3 of Article 48 of this Code, the project documentation (subject to changes made to the project documentation in accordance with parts 3.8 and 3.9 of Article 49 of this Code) and (or) the information model (if the formation and maintenance of the information model are mandatory in accordance with the requirements of this Code), including energy efficiency requirements (with the exception of capital construction facilities to which energy efficiency requirements do not apply) and requirements for equipping a capital construction facility with metering devices for used energy resources. 2. Availability of a building permit. 3. Meeting the requirements of Parts 2.3 and 3.1 of art. 52 of the Urban Planning Code of the Russian Federation.
# 742005203672
Unscheduled inspection
Start date: 2020-11-03, end date: 2020-11-10, duration: 5
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work on the installation of open reinforced concrete trays from t1 to a sand trap with a well trap device to the installation of wells made of precast reinforced concrete restoration of disturbed landscaping reclamation of the construction strip layout and filling with soil-growing soil installation of asphalt concrete pavement commissioning and hydraulic tests of non-pressure pipelines and building materials used in the construction process reconstruction of the capital construction facility as well as the results of such work with the requirements approved in the in accordance with parts 15 152 and 153 of Article 48 of this Code of the project documentation, taking into account the changes made to the project documentation in accordance with parts 38 and 39 of Article 49 of this Code and or the information model if the formation and maintenance of the information model are mandatory in accordance with the requirements of this Code, including the requirements of energy efficiency with the exception of facilities capital construction to which the requirements of energy efficiency do not apply and the requirements for equipping the capital construction facility with metering devices for used energy resources 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 742005145769
Unscheduled inspection
Start date: 2020-10-06, end date: —, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection:
# 742004403794
Unscheduled inspection
Start date: 2020-05-06, end date: 2020-06-03, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 1 Compliance with the work on the waterproofing of the coating on the interior decoration of common areas on the installation of pits at the entrance to the basement and porches of the 2nd stage of construction in axes 4-7” on compliance with fire and sanitary epidemiological measures measures to ensure access for low-mobility groups of the population and the construction materials used during the construction of the reconstruction of the capital construction facility, as well as the results of such work the requirements of the project documentation approved in accordance with Parts 15 152 and 153 of Article 48 of this Code, taking into account the changes made to the project documentation in accordance with parts 38 and 39 of Article 49 of this Code and or the information model if the formation and maintenance of the information model are mandatory in accordance with the requirements of this Code, including energy efficiency requirements with the exception of capital construction facilities for which energy efficiency requirements do not apply, and the requirements for equipping a capital construction facility with metering devices for used energy resources 2 The availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 742004305991
Unscheduled inspection
Start date: 2020-03-03, end date: —, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection:
# 742004383183
Unscheduled inspection
Start date: 2020-03-31, end date: —, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection:
# 741904009277
Unscheduled inspection
Start date: 2019-11-29, end date: —, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection:
# 741902889850
Unscheduled inspection
Start date: 2019-07-30, end date: 2019-08-05, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work on the installation of load-bearing and enclosing structures of external and internal wall panels floor slabs of stairwell shafts plumbing cabins ventilation units on the 47th floor prior to the start of installation of load-bearing and enclosing structures on the 8th floor for laying an indoor outdoor drainage network in the block sections of the BS35 residential building of the 2nd stage of construction in the 4 7” arch axes and the construction materials used during the construction of the facility capital construction as well as the results of such work to the requirements of the project documentation2 The availability of a construction permit3 Compliance with the requirements of hh 23 st52 of the Urban Planning Code of the Russian Federation
# 741902747247
Unscheduled inspection
Start date: 2019-06-04, end date: 2019-06-10, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance with the regulation of 16052019 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 st52 of the Urban Planning Code of the Russian Federation
# 741902688039
Unscheduled inspection
Start date: 2019-05-08, end date: 2019-05-16, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work on the installation of load-bearing and enclosing structures external and internal walls of the ceiling of 13 floors prior to the start of installation of load-bearing and enclosing structures of the 4th floor in the block sections of the BS35 residential building of the 2nd stage of construction in the 4 7” arch axes and the construction materials used during the construction of the capital construction facility as well as the results of such work with the requirements of the design documentation 2 Availability building permits 3 Meeting the requirements of hr 23 st52 of the Urban Planning Code of the Russian Federation
# 741902723305
Unscheduled inspection
Start date: 2019-05-28, end date: —, duration: —
Authority: —
Purpose of inspection:
# 741902651761
Unscheduled inspection
Start date: 2019-04-23, end date: 2019-04-29, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work on the installation of supporting structures of the basement, external and internal walls of the ceiling in the block sections of the residential building BS35 of the 2nd stage of construction in the arches 4 7” for the installation of internal cold and hot water supply systems for heating and sanitation in the block sections of the residential building BS1 BS2 of the 1st stage in the arches 1 3” for compliance with fire and sanitary epidemiological measures and the construction materials used during the construction of the capital construction facility, as well as the results of such work, meet the requirements of the project documentation 2 Availability of a construction permit 3 Compliance with the requirements of HR 23 st52 of the Urban Planning Code of the Russian Federation
# 741902562369
Unscheduled inspection
Start date: 2019-03-12, end date: —, duration: —
Authority: —
Purpose of inspection:
# 001902566974
Unscheduled inspection
Start date: 2019-03-25, end date: 2019-03-27, duration: —
Authority: Uralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This inspection is carried out as part of the control and supervision of compliance with industrial safety requirements in the design, construction, operation, conservation and liquidation of hazardous production facilities, manufacture, installation, commissioning, maintenance and repair of technical devices used at hazardous production facilities for compliance with the requirements of the technical regulations of the Customs Union "On the Safety of Machinery and Equipment" approved by the Decision of the Customs Union Commission of October 18, 2011 823
# 741902603924
Unscheduled inspection
Start date: 2019-03-29, end date: 2019-04-04, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance with the work performed on the installation of monolithic grillings for the installation of a ribbon foundation made of concrete blocks of the FBS for the waterproofing of foundations for the backfilling of pit sinuses of the 2nd stage of construction in the block sections of the BS35 residential building in the 4 7” arch axes for the laying of outdoor drainage networks of the 1st stage of construction in the block sections of the BS12 residential building in the 1-3” arch axes and the applied construction materials during the construction of a capital construction facility, as well as the results of such work, requirements of the project documentation 2 Availability of a construction permit 3 Compliance with the requirements of HR 23 st52 of the Urban Planning Code of the Russian Federation
# 741902471824
Unscheduled inspection
Start date: 2019-02-08, end date: —, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection:
# 741902455080
Unscheduled inspection
Start date: 2019-01-30, end date: 2019-02-05, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance with the installation of load-bearing and enclosing structures of external and internal wall panels of floor slabs of stairwell shafts, sanitary cabins, ventilation units of 810 floors, technical floor structures before the installation of roofing panels in block sections BS1 BS2 of a residential building of the 1st stage in axes 1-3” for filling window openings of 15 floors before the slopes and installation of window sills and applied building materials during the construction of a capital construction facility, as well as the results of such work, the requirements of the project documentation 2 The availability of a construction permit 3 The fulfillment of the requirements of hh 23 st52 of the Urban Planning Code of the Russian Federation
# 741902416245
Unscheduled inspection
Start date: 2019-01-16, end date: —, duration: —
Authority: —
Purpose of inspection:
# 741902437494
Unscheduled inspection
Start date: 2019-01-22, end date: —, duration: —
Authority: —
Purpose of inspection:
# 741802301808
Unscheduled inspection
Start date: 2018-12-20, end date: 2018-12-26, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work performed during the installation of internal engineering systems for heating water supply and sewerage electrical installation work filling window and door openings of the production building installing external and internal gas supply networks of the boiler room performing concrete blind areas around the perimeter of the building installing entrances and porches performing fire and sanitary epidemiological measures and building materials used during the construction of a capital construction facility as well as the results of such work with the requirements project documentation 2 Availability of a building permit 3 Compliance with the requirements of hh 23 and 32 st52 of the Urban Planning Code of the Russian Federation
# 741802323566
Unscheduled inspection
Start date: 2018-12-25, end date: 2018-12-29, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance with the work on roof waterproofing, installation of roof panels, parapet stones, installation of internal engineering systems for cold and hot water supply, heating, and sanitation, internal electrical installation work on the installation of electrical panel input units, filling window and door openings of 110 floors of an apartment building in axes 1-4”A B", compliance with fire and sanitary epidemiological measures and applied construction materials during the construction of a capital construction facility, as well as the results of such work, requirements of the project documentation 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 ct52 of the Urban Planning Code of the Russian Federation
# 741802141923
Unscheduled inspection
Start date: 2018-11-23, end date: 2018-12-20, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Verification of the completed construction of the facility in the arches of axes 1 3” 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 741802138686
Unscheduled inspection
Start date: 2018-11-28, end date: —, duration: —
Authority: —
Purpose of inspection:
# 741802050096
Unscheduled inspection
Start date: 2018-11-07, end date: —, duration: —
Authority: —
Purpose of inspection:
# 741801785206
Unscheduled inspection
Start date: 2018-10-04, end date: 2018-10-10, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work on the installation of load-bearing and enclosing structures of external and internal wall panels floor slabs of stairwell shafts sanitary cabins ventilation units of 13 floors prior to the start of installation of load-bearing and enclosing structures of the 4th floor in the block sections of the residential building BS1 BS2 of the 1st stage in the arch axes 1 3” and the construction materials used during the construction of the capital construction facility, as well as the results of such requirements of the technical regulations of the project documentation 2 Availability of a building permit 3 Compliance with the requirements of HH 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 741801118566
Unscheduled inspection
Start date: 2018-09-13, end date: 2018-09-19, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work on the installation of load-bearing and enclosing structures of external and internal wall panels, floor slabs of stairwell shafts, sanitary cabins, ventilation units of 48 floors in axes 1 4”A B” and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of technical regulations of the project documentation 2 Availability of a construction permit 3 Compliance with the requirements of hh Articles 23 and 31 of the Urban Planning Code of the Russian Federation
# 741800674451
Unscheduled inspection
Start date: 2018-09-03, end date: —, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection:
# 741801652164
Unscheduled inspection
Start date: 2018-09-28, end date: 2018-10-25, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Verification of the completed facility in axes 13 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 741800660572
Unscheduled inspection
Start date: 2018-08-24, end date: —, duration: —
Authority: —
Purpose of inspection:
# 741800522720
Unscheduled inspection
Start date: 2018-07-06, end date: —, duration: —
Authority: —
Purpose of inspection:
# 741800491382
Unscheduled inspection
Start date: 2018-07-03, end date: 2018-07-09, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of landscaping and microrelief formation with landscaping for the installation of pits at the entrance to the basement and porches of sidewalks and driveways made of asphalt concrete for the installation of small architectural forms of an apartment building in axes 1-6” and the construction materials used during the construction of a capital construction facility, as well as the results of such work, with the requirements of technical regulations and project documentation 2 Availability of permits for construction 3 Meeting the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 741800408620
Unscheduled inspection
Start date: 2018-06-14, end date: 2018-06-20, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work on the installation of monolithic grillings for the installation of a ribbon foundation made of concrete blocks of FBS before the start of work on the backfilling of the sinuses of the excavation of the 2nd stage BS1 BS2 in axes 1 3” and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of technical regulations of the project documentation 2 Availability of a construction permit 3 requirements of hh 23 st52 of the Urban Planning Code of the Russian Federation
# 741800408760
Unscheduled inspection
Start date: 2018-06-07, end date: 2018-06-14, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of work on the installation of internal power supply networks for low-current systems for the installation of equipment in an electrical control room for the decoration of premises in public areas for compliance with sanitary and epidemiological measures to ensure access for low-mobility groups of the residential building arch 1 3” and the construction materials used during the construction of a capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the design documentation 2 Availability of a building permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 741800408701
Unscheduled inspection
Start date: 2018-06-07, end date: 2018-06-14, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of work on the installation of internal power supply networks for low-current systems for the installation of equipment in an electrical control room for the decoration of premises in public areas for compliance with sanitary and epidemiological measures to ensure access for low-mobility groups of the residential building arch 1 3” and the construction materials used during the construction of a capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the design documentation 2 Availability of a building permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 741800471149
Unscheduled inspection
Start date: 2018-06-20, end date: 2018-06-26, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work on the installation of load-bearing and enclosing structures of external and internal wall panels, floor slabs of stairwell shafts, sanitary cabins, ventilation units of 13 floors before the start of installation of load-bearing and enclosing structures of the 4th floor in axes 1-4”A B” and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of technical regulations of the project documentation 2 Availability of a building permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 741800372289
Unscheduled inspection
Start date: 2018-05-18, end date: 2018-05-24, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work on the installation of the underground gas pipeline 75 along Sovetskaya Street from railway 1a to railway 47 odd side from LJ 2 to railway 44 even side earthworks laying of polyethylene pipe backfilling and construction materials used during the construction of the capital construction facility as well as the results of such work with the requirements of technical regulations design documentation 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 741800339975
Unscheduled inspection
Start date: 2018-05-11, end date: 2018-05-17, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance with the installation of internal engineering heating systems for hot and cold water supply and sanitation in BS 22 BS 21 block sections in axes 1-3” for filling window openings of 110 floors before slopes and installing window sills in the corner block section BS 22 arch of axis 2-3” and the construction materials used during the construction of a capital construction facility, as well as the results of such work meet the requirements of the technical regulations of the project documentation 2 The availability of a construction permit 3 The fulfillment of the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 001800370818
Unscheduled inspection
Start date: 2018-05-22, end date: 2018-05-25, duration: —
Authority: Uralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This inspection is carried out as part of the control and supervision of compliance with industrial safety requirements in the design, construction, operation, conservation and liquidation of hazardous production facilities, manufacture, installation, commissioning, maintenance and repair of technical devices used at hazardous production facilities for compliance with the requirements of the technical regulations of the Customs Union "On the Safety of Machinery and Equipment" approved by the Decision of the Customs Union Commission of October 18, 2011 823 TR CU 0102011
# 741800339940
Unscheduled inspection
Start date: 2018-05-22, end date: 2018-05-28, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work on the installation of concrete floors on the ground on the 1st floor in the axes A T” 1 9” and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 741800385151
Unscheduled inspection
Start date: 2018-05-23, end date: 2018-05-29, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work on the installation of load-bearing structures of the 7th floor with full readiness and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 741800328073
Unscheduled inspection
Start date: 2018-05-03, end date: 2018-05-10, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work on the installation of the supporting structures of the basement, the external and internal walls of the overlap of the ribbon foundation of the FBS blocks before the installation of the external and internal wall panels of the 1st floor in the block sections of the residential building arch 1 4” A B” and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of technical regulations project documentation 2 Availability of a building permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 741800268952
Unscheduled inspection
Start date: 2018-04-10, end date: 2018-04-16, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work on the construction of the pile field and the felling of piles before the start of work on concreting monolithic grillings of the 2nd stage BS1 BS2 in the axes 1 3” and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 The Urban Planning Code of the Russian Federation
# 741800242279
Unscheduled inspection
Start date: 2018-04-11, end date: 2018-04-17, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work on the installation of the underground gas pipeline Dn 108 89 mm along Solodyakina Street from railway 39 to railway 117 odd side from railway 44 to railway 120 even side of the underground gas pipeline Dn 75 mm along Pervomaiskaya Street from railway 1 to railway 7 odd side from railway 2 to railway 10 even side excavation laying of polyethylene pipe backfilling and applied building materials during the construction of a capital construction facility as well as the results of such work to the requirements of technical regulations of project documentation 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 741800298048
Unscheduled inspection
Start date: 2018-04-25, end date: 2018-05-03, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 The compliance of the roof waterproofing work, the insulation of the ceiling of the cold attic of an apartment building in the 1 3” arches and the construction materials used during the construction of a capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation 2 The availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 741800181851
Unscheduled inspection
Start date: 2018-03-13, end date: 2018-03-19, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance with the installation of internal engineering heating systems for hot and cold water supply, sanitation, internal power supply networks, installation of electrical panel and elevator equipment, finishing work in public areas, compliance with fire and sanitary epidemiological measures, measures to ensure access for low-mobility groups of the population in the block sections of a residential building in axes 4-6” and applied building materials during the construction of a capital construction facility, as well as the results of such work, the requirements of the technical regulations of the project documentation 2 The availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 ct52 of the Urban Planning Code of the Russian Federation
# 741800181784
Unscheduled inspection
Start date: 2018-03-13, end date: 2018-03-19, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance with the installation of internal engineering heating systems for hot and cold water supply, sanitation, internal power supply networks, installation of electrical panel and elevator equipment, finishing work in public areas, compliance with fire and sanitary epidemiological measures, measures to ensure access for low-mobility groups of the population in the block sections of a residential building in axes 4-6” and applied building materials during the construction of a capital construction facility, as well as the results of such work, the requirements of the technical regulations of the project documentation 2 The availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 ct52 of the Urban Planning Code of the Russian Federation
# 741800166023
Unscheduled inspection
Start date: 2018-03-07, end date: 2018-03-15, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work on the installation of an underground gas pipeline Dn 108 89 mm along Solodyankina Street from railway 39 to railway 117 odd side from railway 44 to railway 120 even side excavation laying of polyethylene pipe backfilling for the installation of an above-ground gas pipeline along Solodyankina Street from railway 77 to railway 81 from railway 84 to railway 88 from railway 96 up to railway 98 foundations for supports installation of supports installation of pipelines anti-corrosion protection and construction materials used during the construction of a capital construction facility as well as the results of such work to the requirements of technical regulations of project documentation 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 741800072394
Unscheduled inspection
Start date: 2018-02-21, end date: 2018-02-28, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the installation of load-bearing and enclosing structures of external and internal wall panels of floor slabs from the 5th to the 7th floors prior to the installation of load-bearing and enclosing structures of the 8th floor in axes 1-3” and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation 2 Availability of permits for construction 3 Meeting the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 741800100076
Unscheduled inspection
Start date: 2018-02-27, end date: —, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection:
# 74180803027407
Unscheduled inspection
Start date: 2018-01-09, end date: 2018-01-15, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work on the installation of load-bearing and enclosing structures of external and internal wall panels of floor slabs from the 1st to the 4th floors prior to the installation of load-bearing and enclosing structures of the 5th floor in axes 1-3” and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation 2 Availability of a permit for construction 3 Meeting the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 74170803027523
Unscheduled inspection
Start date: 2017-12-28, end date: —, duration: —
Authority: —
Purpose of inspection:
# 74170802908602
Unscheduled inspection
Start date: 2017-12-06, end date: 2017-12-12, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1The compliance of the work on the installation of the supporting structures of the basement, the external and internal walls of the ceiling in the axes “13” before the installation of the external and internal wall panels of the 1st floor and the building materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation2the need for a construction permit3the requirements of hh 23 and 31st st52 of the Urban Planning Code Russian Federation
# 74170802873468
Unscheduled inspection
Start date: 2017-11-23, end date: 2017-11-29, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1conformity of work on the installation of load-bearing and enclosing structures of external and internal wall panels of floor slabs of stairwell shafts, sanitary cabins, ventilation units of 810 floors, structures of the technical floor of the parapet in the “46” axes until the end of the installation of roofing panels and building materials used during the construction of the capital construction facility, as well as the results of such work, to the requirements of technical regulations of the project documentation2 Receipt of a construction permit 3compliance with the requirements hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 74170802674857
Unscheduled inspection
Start date: 2017-10-09, end date: 2017-10-13, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1confirmation of the fulfillment of the prescription from 22082017 G2the receipt of a construction permit 3The fulfillment of the requirements of hh 23 and 31st52 of the Urban Planning Code of the Russian Federation
# 74170802597545
Unscheduled inspection
Start date: 2017-10-05, end date: 2017-10-11, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1The compliance of the work on the installation of load-bearing and enclosing structures of external and internal wall panels floor slabs of stairwell shafts sanitary cabins ventilation units of 14 floors in axes 46 prior to the installation of load-bearing and enclosing structures of the 5th floor and the building materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation2the need for a construction permit3compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 74170802741843
Unscheduled inspection
Start date: 2017-10-24, end date: —, duration: —
Authority: —
Purpose of inspection:
# 74170802729412
Unscheduled inspection
Start date: 2017-10-16, end date: 2017-10-20, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1The compliance of the work on the organization of the construction site, the removal of the axes of the object in kind, the development of the excavation before the start of pile work and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation2the receipt of a construction permit3the fulfillment of the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 74170802708007
Unscheduled inspection
Start date: 2017-10-16, end date: —, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection:
# 74170802707237
Unscheduled inspection
Start date: 2017-10-17, end date: 2017-10-23, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1The performance of work on the installation of reservoir drainage for driving a pile field under the block sections of a residential building in the arch axes “13” before the start of work on the installation of monolithic grillings and building materials used during the construction of a capital construction facility, as well as the results of such work, meets the requirements of the technical regulations of the project documentation2the need for a construction permit3compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 74170802510185
Unscheduled inspection
Start date: 2017-09-26, end date: 2017-10-02, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work performed during the installation of panels along axis 1 and axis 9, the installation of floors in axes 19AD and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation2 The availability of a construction permit3 Compliance with the requirements of hh 23 st52 of the Urban Planning Code of the Russian Federation
# 74170802511638
Unscheduled inspection
Start date: 2017-09-20, end date: 2017-09-26, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1The compliance of the work on the installation of the supporting structures of the basement, the external and internal walls of the ceiling in axes 46 prior to the installation of the external and internal wall panels of the 1st floor for the installation of external water supply and sewerage networks in axes 13 and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation2the receipt of a construction permit3 requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 74170701866752
Unscheduled inspection
Start date: 2017-08-09, end date: 2017-09-05, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1The verification of the completed construction of the 3rd stage of the residential building construction in the axes “1012”“AG” 2The receipt of a construction permit 3The fulfillment of the requirements of hh 23 st52 of the Urban Planning Code of the Russian Federation
# 74170701759582
Unscheduled inspection
Start date: 2017-07-18, end date: 2017-07-24, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work performed during the installation of panels in axes 19AD, the installation of metal structures in axes 59DT, compliance with fire-fighting and sanitary epidemiological measures and the construction materials used during the construction of a capital construction facility, as well as the results of such work, with the requirements of technical regulations for project documentation2 Availability of a construction permit3 Compliance with the requirements of hh 23 st52 of the Urban Planning Code of the Russian Federation
# 74170701759425
Unscheduled inspection
Start date: 2017-07-13, end date: 2017-07-19, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1The compliance of the installation of roofing panels for waterproofing the roof of an apartment building in the axes "1012""AG" 3rd stage of construction and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation2the need for a construction permit3compliance with the requirements of hh 23 st52 of the Urban Planning Code of the Russian Federation
# 74170701813044
Unscheduled inspection
Start date: 2017-07-25, end date: 2017-07-31, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1conformity of work on the improvement of the adjacent territory, the installation of small architectural forms for the installation of internal cold and hot water supply systems, heating, drainage, boiler room entry points, installation of external sewerage networks, compliance with fire and sanitary epidemiological measures, measures to ensure access for low-mobility groups of the residential building in the axes “1012”“AG” 3rd stage of construction and the construction materials used in during the construction of a capital construction facility, as well as the results of such work, the requirements of the technical regulations of the project documentation 2The receipt of a construction permit 3The fulfillment of the requirements of HH 23 st52 of the Urban Planning Code of the Russian Federation
# 74170701685455
Unscheduled inspection
Start date: 2017-06-13, end date: —, duration: —
Authority: —
Purpose of inspection:
# 74170701580019
Unscheduled inspection
Start date: 2017-05-10, end date: 2017-05-16, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1The compliance of the work on the installation of reservoir drainage and a pile field under the block section of an apartment building in the arch axes “34” and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation2the need for a construction permit3the requirements of hh 23 st52 of the Urban Planning Code of the Russian Federation
# 74170701655308
Unscheduled inspection
Start date: 2017-05-31, end date: 2017-06-06, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1The compliance of the work on the installation of load-bearing and enclosing structures of external and internal wall panels of floor slabs from the 8th to the 10th floors prior to the installation of structures of the cold attic and parapet of an apartment building in the axes “1012” “AG” 3rd stage of construction and the construction materials used during the construction of a capital construction facility, as well as the results of such work, with the requirements of technical regulations project documentation 2The receipt of a construction permit 3The fulfillment of the requirements of HH 23 st52 of the Urban Planning Code of the Russian Federation
# 74170701542654
Unscheduled inspection
Start date: 2017-04-27, end date: 2017-05-04, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1The compliance of the work on the breakdown of axes for the construction of a foundation pit for the implementation of fire and sanitary epidemiological measures before the installation of a pile field 2 stages of construction of a residential building in block sections BS 1 2 in axes “13” and the construction materials used during the construction of a capital construction facility, as well as the results of such work, with the requirements of technical regulations for project documentation2the receipt of a construction permit 3The fulfillment of the requirements of HR 23 st52 of the Urban Planning Code of the Russian Federation
# 74170701502719
Unscheduled inspection
Start date: 2017-04-05, end date: 2017-04-11, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1The compliance of the work on the installation of load-bearing and enclosing structures of the external and internal wall panels of the floor slabs of the 6th and 7th floors prior to the installation of load-bearing and enclosing structures of the 8th floor of a residential building in the axes “1012”“AG” 3rd stage of construction and the construction materials used during the construction of a capital construction facility, as well as the results of such work, with the requirements of technical regulations project documentation 2The receipt of a construction permit 3The fulfillment of the requirements of HH 23 st52 of the Urban Planning Code of the Russian Federation
# 74170701359634
Unscheduled inspection
Start date: 2017-02-20, end date: 2017-02-28, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1The compliance of the work on the installation of foundations, waterproofing of foundations before backfilling the sinuses of the excavation in axes 13 and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation2the need for a construction permit3compliance with the requirements of hh 23 st52 of the Urban Planning Code of the Russian Federation
# 74170701317351
Unscheduled inspection
Start date: 2017-01-27, end date: 2017-02-02, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1The compliance of the work on the installation of load-bearing and enclosing structures of the external and internal wall panels of the floor slabs of the 6th and 7th floors before the start of the installation of load-bearing and enclosing structures of the 8th floor in the axes “1012”“AB” and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation2the need for a construction permit3 requirements of hh 23 st52 of the Urban Planning Code of the Russian Federation
# 74170701285734
Unscheduled inspection
Start date: 2017-01-25, end date: 2017-01-31, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1The compliance of the work on the installation of foundations, waterproofing of foundations before backfilling the sinuses of the excavation in axes 13 and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation2the need for a construction permit3compliance with the requirements of hh 23 st52 of the Urban Planning Code of the Russian Federation
# 74160701162202
Unscheduled inspection
Start date: 2016-12-12, end date: 2016-12-15, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1The compliance of the work on the installation of load-bearing and enclosing structures of the external and internal wall panels of the floor slabs of the 5th and 6th floors prior to the installation of the load-bearing and enclosing structures of the 7th floor in the axes “1012”“AB” and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation2the need for a construction permit3 requirements of hr 23 st52 of the Urban Planning Code of the Russian Federation
# 74160701228613
Unscheduled inspection
Start date: 2016-12-21, end date: 2016-12-27, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1The compliance of the work on the installation of foundations, waterproofing of foundations before backfilling the sinuses of the excavation in axes 13 and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation2the need for a construction permit3compliance with the requirements of hh 23 st52 of the Urban Planning Code of the Russian Federation
# 74160701061442
Unscheduled inspection
Start date: 2016-11-15, end date: 2016-11-17, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1Compliance with the regulation of October 03, 20162the receipt of a construction permit3compliance with the requirements of HH 23 st52 of the Urban Planning Code of the Russian Federation
# 74160701108235
Unscheduled inspection
Start date: 2016-11-22, end date: 2016-11-28, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1The compliance of the work on the installation of foundations, waterproofing of foundations before backfilling the sinuses of the excavation in axes 46 and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation2the need for a construction permit3compliance with the requirements of hh 23 st52 of the Urban Planning Code of the Russian Federation
# 74160700995863
Unscheduled inspection
Start date: 2016-10-12, end date: —, duration: —
Authority: —
Purpose of inspection:
# 74160700915970
Unscheduled inspection
Start date: 2016-10-04, end date: 2016-10-07, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1The compliance of the work on the installation of load-bearing and enclosing structures of the exterior and interior wall panels of the floor slabs of the 4th floor prior to the installation of the load-bearing and enclosing structures of the 5th floor in the axes “1012”“AB” and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation2the receipt of a construction permit 3The fulfillment of the requirements of the HH 23 st52 of the Urban Planning Code of the Russian Federation
# 74160701020147
Unscheduled inspection
Start date: 2016-10-27, end date: 2016-11-02, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1The compliance of the work on the installation of foundations, waterproofing of foundations before backfilling the sinuses of the excavation in axes 13 and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation2the need for a construction permit3compliance with the requirements of hh 23 st52 of the Urban Planning Code of the Russian Federation
# 74160700862043
Unscheduled inspection
Start date: 2016-09-29, end date: 2016-10-03, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1conformity of work on the installation of an artificial foundation for reservoir drainage in compliance with fire and sanitary epidemiological measures of a residential building in block sections in axes “36”“AB” before the installation of a pile field and building materials used during the construction of a capital construction facility, as well as the results of such work, to the requirements of technical regulations for project documentation2the need for a construction permit3compliance with the requirements of hh 23 st52 of the Urban Planning Code Russian Federation
# 74160700433618
Unscheduled inspection
Start date: 2016-09-15, end date: 2016-09-21, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1The compliance of the work on the organization of the construction site, the removal of networks from the construction site, the removal of the axes of the object in kind, the development of the excavation in the axes 16 before the start of work on the foundations and building materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation2 The receipt of a construction permit3 Compliance with the requirements of hh 23 st52 of the Urban Planning Code of the Russian Federation
# 74160601765853
Unscheduled inspection
Start date: 2016-08-09, end date: 2016-08-12, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1The compliance of the work on the installation of the internal power supply system of the electrical panel in the block section in the axes “59”“AG” and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation2the need for a construction permit3compliance with the requirements of hh 23 st52 of the Urban Planning Code of the Russian Federation