# 562101478536
Unscheduled inspection
Start date: 2021-12-21, end date: 2021-12-21, duration: 1
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Orenburgskoi oblasti
Purpose of inspection: implementation of regional state construction supervision on the basis of a notice of completion of construction;, The objectives of this audit are: to identify and prevent violations of urban planning legislation by the developer, project documentation, including the requirements for equipping the capital construction facility with metering devices for used energy resources., The subject of this audit is: to verify the compliance of work performed and applied construction materials in the process of construction, reconstruction of the capital construction facility, as well as the results of such work, to the requirements of the design documentation, including energy efficiency requirements (with the exception of capital construction facilities, which are not subject to energy efficiency requirements) and the requirements for equipping the capital construction facility with metering devices for energy resources used; - availability of a construction permit; - meeting the requirements set out in Parts 2, 3 and 3.1 of Article 52 of the Urban Construction Code of the Russian Federation; - ensuring accessibility of social, engineering and transport infrastructure facilities for the disabled.
# 562100214154
Unscheduled inspection
Start date: 2021-05-19, end date: —, duration: 7
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Orenburgskoi oblasti
Purpose of inspection: implementation of regional state construction supervision on the basis of the received notification of the elimination of violations as prescribed on 04/08/2021;
- the objectives of this audit are: to identify and prevent violations of the requirements of project documentation, including energy efficiency requirements and requirements for equipping a capital construction facility with metering devices for used energy resources, legislation on urban development (Part 2 of art. 51, Part 2, 3, 3.1, 6 of art. 52 of the Urban Planning Code of the Russian Federation).
compliance of the work performed and the building materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for the energy resources used in the installation of the building's supporting frame, installation of walls, partitions, staircases, platforms, provision of executive documentation; compliance with urban planning legislation (part 2 of art. 51, Part 2, 3, 3.1, 6 of art. 52 of the Urban Planning Code of the Russian Federation).
# 562100098963
Unscheduled inspection
Start date: 2021-03-31, end date: 2021-04-08, duration: 7
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Orenburgskoi oblasti
Purpose of inspection: implementation of regional state construction supervision on the basis of the received notice of the start of construction dated 03/04/2021;
- the objectives of this audit are: to identify and prevent violations of the requirements of project documentation, including energy efficiency requirements and requirements for equipping a capital construction facility with metering devices for used energy resources, legislation on urban development (Part 2 of art. 51, Part 2, 3, 3.1, 6 of art. 52 of the Urban Planning Code of the Russian Federation).
compliance of the work performed and the building materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the design documentation, including the requirements for energy efficiency and the requirements for equipping the capital construction facility with metering devices for the energy resources used during the installation of the building's supporting frame, installation of walls, partitions, staircases, sites, provision of executive documentation; compliance with urban planning legislation (part 2 of art. 51, Part 2, 3, 3.1, 6 of art. 52 of the Urban Planning Code of the Russian Federation).
# 562005184356
Unscheduled inspection
Start date: 2020-10-12, end date: 2020-10-16, duration: 3
Authority: Gosudarstvennaya inspekciya truda v Orenburgskoi oblasti
Purpose of inspection: Implementation of federal state supervision over compliance with labor legislation and other regulatory legal acts containing labor law norms 10001244260