# 562100239787
Unscheduled inspection
Start date: 2021-05-26, end date: —, duration: —
Authority: Gosudarstvennaya inspekciya truda v Orenburgskoi oblasti
Purpose of inspection: Implementation of federal state supervision over compliance with labor legislation and other regulatory legal acts containing labor law norms, state function identifier 10001244260
# 562004482685
Unscheduled inspection
Start date: 2020-08-06, end date: 2020-08-06, duration: 1
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Orenburgskoi oblasti
Purpose of inspection: This audit is conducted in order to carry out regional state construction supervision. The objectives of this audit are to identify and prevent violations of the requirements of the design documentation, including the requirements for energy efficiency and equipment of the capital construction facility with metering devices for used energy resources of the legislation on urban development, Part 2, 3, 31, 6, art. 52 of the Urban Planning Code of the Russian Federation. The subject of this audit is the compliance of the work and the construction materials used during the construction reconstruction of the capital construction facility as well as the results of such work meet the requirements of the design documentation, including the requirements for energy efficiency and the requirements for equipping the capital construction facility with energy metering devices, meeting the requirements of Parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation, eliminating violations identified during construction control and state construction supervision execution and provision of executive documentation
# 562004482657
Unscheduled inspection
Start date: 2020-08-06, end date: —, duration: —
Authority: —
Purpose of inspection:
# 562004482781
Unscheduled inspection
Start date: 2020-08-06, end date: —, duration: —
Authority: —
Purpose of inspection:
# 562004482703
Unscheduled inspection
Start date: 2020-08-06, end date: 2020-08-06, duration: 1
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Orenburgskoi oblasti
Purpose of inspection: This audit is conducted in order to carry out regional state construction supervision. The objectives of this audit are to identify and prevent violations of the requirements of the design documentation, including the requirements for energy efficiency and equipment of the capital construction facility with metering devices for used energy resources of the legislation on urban development, Part 2, 3, 31, 6, art. 52 of the Urban Planning Code of the Russian Federation. The subject of this audit is the compliance of the work and the construction materials used during the construction reconstruction of the capital construction facility as well as the results of such work meet the requirements of the design documentation, including the requirements for energy efficiency and the requirements for equipping the capital construction facility with energy metering devices, meeting the requirements of Parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation, eliminating violations identified during construction control and state construction supervision execution and provision of executive documentation
# 562004481831
Unscheduled inspection
Start date: 2020-08-06, end date: —, duration: —
Authority: —
Purpose of inspection:
# 562004452950
Unscheduled inspection
Start date: 2020-07-06, end date: 2020-07-08, duration: 3
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Orenburgskoi oblasti
Purpose of inspection: This inspection is carried out in order to carry out regional state construction supervision on the basis of a notice of completion of construction. The objectives of this inspection are to identify and prevent violations of urban planning legislation by the developer and project documentation, including the requirements for equipping the capital construction facility with metering devices for energy resources used. The subject of this inspection is to verify the compliance of completed works and applied building materials during construction reconstruction of the capital construction facility as well as the results of such work to the requirements of the design documentation, including energy efficiency requirements, with the exception of capital construction facilities to which energy efficiency requirements do not apply, and to the requirements for equipping the capital construction facility with metering devices for used energy resources
# 562004446520
Unscheduled inspection
Start date: 2020-07-06, end date: —, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Orenburgskoi oblasti
Purpose of inspection:
# 562004446561
Unscheduled inspection
Start date: 2020-07-06, end date: 2020-07-08, duration: 3
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Orenburgskoi oblasti
Purpose of inspection: this inspection is carried out in order to monitor the elimination of violations specified in the regulation dated 28012020 400402511051011p the objectives of this inspection are to identify and prevent violations of the requirements of the design documentation, including the requirements for energy efficiency and equipment of the capital construction facility with metering devices for used energy resources legislation on urban development h 2 3 31 6 Art 52 of the Urban Planning Code of the Russian Federation the subject of this inspection the compliance of the work performed and the construction materials used during the construction reconstruction of the capital construction facility, as well as the results of such work, with the requirements of the design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used, meeting the requirements of Parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation, eliminating violations identified during the construction process control and state construction supervision registration and provision of executive documentation
# 562004446547
Unscheduled inspection
Start date: 2020-07-06, end date: —, duration: —
Authority: —
Purpose of inspection:
# 562004446534
Unscheduled inspection
Start date: 2020-07-06, end date: —, duration: —
Authority: —
Purpose of inspection:
# 562004446437
Unscheduled inspection
Start date: 2020-07-06, end date: 2020-07-08, duration: 3
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Orenburgskoi oblasti
Purpose of inspection: in order to control the elimination of violations specified in the regulation dated 28012020 4004025110607p, the objectives of this audit are to identify and prevent violations of the requirements of the design documentation, including the requirements for energy efficiency and equipment of the capital construction facility with metering devices for used energy resources of the legislation on urban development h 2 3 31 6 art. 52 of the Urban Planning Code of the Russian Federation the subject of this audit is compliance with works and construction materials used during the construction reconstruction of the capital construction facility, as well as the results of such work, requirements of the design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used, compliance with the requirements of Parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation elimination of violations identified during construction control and state construction supervision registration and provision of executive documentation
# 562004453215
Unscheduled inspection
Start date: 2020-07-13, end date: —, duration: —
Authority: —
Purpose of inspection:
# 562004453258
Unscheduled inspection
Start date: 2020-07-13, end date: 2020-07-15, duration: 3
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Orenburgskoi oblasti
Purpose of inspection: This inspection is carried out in order to carry out regional state construction supervision on the basis of a notice of completion of construction. The objectives of this inspection are to identify and prevent violations of urban planning legislation by the developer and project documentation, including the requirements for equipping the capital construction facility with metering devices for energy resources used. The subject of this inspection is to verify the compliance of completed works and applied building materials during construction reconstruction of the capital construction facility as well as the results of such work to the requirements of the design documentation, including energy efficiency requirements, with the exception of capital construction facilities to which energy efficiency requirements do not apply, and to the requirements for equipping the capital construction facility with metering devices for used energy resources
# 562004453179
Unscheduled inspection
Start date: 2020-07-13, end date: —, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Orenburgskoi oblasti
Purpose of inspection:
# 562004452811
Unscheduled inspection
Start date: 2020-07-13, end date: 2020-07-15, duration: 3
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Orenburgskoi oblasti
Purpose of inspection: this inspection is carried out in order to carry out regional state construction supervision on the basis of the notice of completion of construction dated 06072020. The objectives of this inspection are to identify and prevent violations of the requirements of the project documentation, including the requirements for energy efficiency and equipment of the capital construction facility with metering devices for used energy resources legislation on urban development, Part 2 3 31 6 of Article 52 of the Urban Planning Code of the Russian Federation The subject of this audit is the compliance of the work performed and the construction materials used during the construction reconstruction of the capital construction facility, as well as the results of such work, with the requirements of the design documentation, including the requirements for energy efficiency and the requirements for equipping the capital construction facility with metering devices for energy resources used, meeting the requirements of Parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation, eliminating violations identified in in the process of carrying out construction control and state construction supervision, registration and provision of executive documentation
# 562004420598
Unscheduled inspection
Start date: 2020-06-01, end date: —, duration: —
Authority: —
Purpose of inspection:
# 562004420583
Unscheduled inspection
Start date: 2020-06-01, end date: 2020-06-09, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Orenburgskoi oblasti
Purpose of inspection: This inspection is carried out in order to monitor the elimination of violations specified in the regulation dated 28012020 400402511040910p and the implementation of regional state construction supervision based on the inspection program dated 13012020 the objectives of this inspection are to identify and prevent violations of the requirements of the design documentation, including the requirements of energy efficiency and equipment of the capital construction facility metering devices used energy resources legislation on urban development h 2 Art 51 h 2 3 31 6 Art 52 of the Urban Planning Code of the Russian Federation the subject of this audit is the compliance of the work performed and the building materials used during the construction reconstruction of the capital construction facility as well as the results of such work with the requirements of the design documentation, including the requirements of energy efficiency and the requirements of equipping the capital construction facility with metering devices for the energy resources used. 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation elimination of violations identified in the course of construction control and state construction supervision Paragraphs 5 6 7 8 9 of the inspection program dated 13012020 registration and provision of executive documentation
# 562004420541
Unscheduled inspection
Start date: 2020-06-01, end date: 2020-06-09, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Orenburgskoi oblasti
Purpose of inspection: This inspection is carried out in order to monitor the elimination of violations specified in the regulation dated 28012020 4004025110607p and the implementation of regional state construction supervision based on the inspection program dated 13012020 the objectives of this inspection are to identify and prevent violations of the requirements of the design documentation, including the requirements of energy efficiency and equipment of the capital construction facility metering devices used energy resources legislation on urban development h 2 Art 51 h 2 3 31 6 Art 52 of the Urban Planning Code of the Russian Federation the subject of this audit is the compliance of the work performed and the building materials used during the construction reconstruction of the capital construction facility as well as the results of such work with the requirements of the design documentation, including the requirements of energy efficiency and the requirements of equipping the capital construction facility with metering devices for used energy resources and meeting the requirements of the parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation elimination of violations identified in the course of construction control and state construction supervision Paragraphs 5 6 7 8 9 of the inspection program dated 13012020 registration and provision of executive documentation
# 562004420568
Unscheduled inspection
Start date: 2020-06-01, end date: 2020-06-09, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Orenburgskoi oblasti
Purpose of inspection: This inspection is carried out in order to monitor the elimination of violations specified in the regulation dated 28012020 400402511030809p and the implementation of regional state construction supervision based on the inspection program dated 13012020 the objectives of this inspection are to identify and prevent violations of the requirements of the design documentation, including the requirements of energy efficiency and equipment of the capital construction facility metering devices used energy resources legislation on urban development h 2 Art 51 h 2 3 31 6 Art 52 of the Urban Planning Code of the Russian Federation the subject of this audit is the compliance of the work performed and the building materials used during the construction reconstruction of the capital construction facility as well as the results of such work with the requirements of the design documentation, including the requirements of energy efficiency and the requirements of equipping the capital construction facility with metering devices for used energy resources and meeting the requirements of the parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation elimination of violations identified in the course of construction control and state construction supervision Paragraphs 5 6 7 8 9 of the inspection program dated 13012020 registration and provision of executive documentation
# 562004420551
Unscheduled inspection
Start date: 2020-06-01, end date: 2020-06-09, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Orenburgskoi oblasti
Purpose of inspection: This inspection is carried out in order to monitor the elimination of violations specified in the regulation dated 28012020 4004025110607p and the implementation of regional state construction supervision based on the inspection program dated 13012020 the objectives of this inspection are to identify and prevent violations of the requirements of the design documentation, including the requirements of energy efficiency and equipment of the capital construction facility metering devices used energy resources legislation on urban development h 2 Art 51 h 2 3 31 6 Art 52 of the Urban Planning Code of the Russian Federation the subject of this audit is the compliance of the work performed and the building materials used during the construction reconstruction of the capital construction facility as well as the results of such work with the requirements of the design documentation, including the requirements of energy efficiency and the requirements of equipping the capital construction facility with metering devices for used energy resources and meeting the requirements of the parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation elimination of violations identified in the course of construction control and state construction supervision Paragraphs 5 6 7 8 9 of the inspection program dated 13012020 registration and provision of executive documentation
# 562004322826
Unscheduled inspection
Start date: 2020-03-04, end date: 2020-03-11, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Orenburgskoi oblasti
Purpose of inspection: This inspection is carried out in order to monitor the elimination of violations specified in the regulation dated 28012020 400402 511051011p and the approved inspection program dated 13012020. The objectives of this inspection are to identify and prevent violations of the requirements of the design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used. The subject of this inspection is the compliance of the work and the applied construction materials during the construction of the capital construction facility, as well as the results of such work, meet the requirements of the design documentation code 1851905 of ACC LLC, including the requirements for energy efficiency and the requirements for equipping the capital construction facility with metering devices for energy resources used in the construction of multilayer external and internal walls of the aboveground part of the building, the installation of ventilation ducts, the construction of internal walls and partitions, the installation of floor slabs stairwells and flights of stairs filling of window and door openings installation of external and internal engineering networks roofing works during finishing works provision of executive documentation
# 562004322779
Unscheduled inspection
Start date: 2020-03-04, end date: 2020-03-11, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Orenburgskoi oblasti
Purpose of inspection: This inspection is carried out in order to monitor the elimination of violations specified in the regulation dated 28012020 400402 511040910p and the approved inspection program dated 13012020. The objectives of this inspection are to identify and prevent violations of the requirements of the design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used. The subject of this inspection is the compliance of the work and the applied construction materials during the construction of the capital construction facility, as well as the results of such work, meet the requirements of the design documentation code 1851904 of ACC LLC, including the requirements for energy efficiency and the requirements for equipping the capital construction facility with metering devices for energy resources used in the construction of multilayer external and internal walls of the aboveground part of the building, the installation of ventilation ducts, the construction of internal walls and partitions, the installation of floor slabs stairwells and flights of stairs filling of window and door openings installation of external and internal engineering networks roofing works during finishing works provision of executive documentation
# 562004322719
Unscheduled inspection
Start date: 2020-03-04, end date: 2020-03-11, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Orenburgskoi oblasti
Purpose of inspection: This inspection is carried out in order to monitor the elimination of violations specified in the regulation dated 28012020 400402 511030809p and the approved inspection program dated 13012020. The objectives of this inspection are to identify and prevent violations of the requirements of the design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used. The subject of this inspection is the compliance of the work and the applied construction materials during the construction of the capital construction facility, as well as the results of such work, meet the requirements of the design documentation code 1851903 of ACC LLC, including the requirements for energy efficiency and the requirements for equipping the capital construction facility with metering devices for energy resources used in the construction of multilayer external and internal walls of the aboveground part of the building, the installation of ventilation ducts, the construction of internal walls and partitions, the installation of floor slabs stairwells and flights of stairs, filling of window and door openings, installation of external and internal engineering networks during finishing and roofing works, provision of executive documentation
# 562004322497
Unscheduled inspection
Start date: 2020-03-04, end date: —, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Orenburgskoi oblasti
Purpose of inspection:
# 562004320982
Unscheduled inspection
Start date: 2020-03-04, end date: 2020-03-11, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Orenburgskoi oblasti
Purpose of inspection: This inspection is carried out in order to monitor the elimination of violations specified in the regulation dated 28012020 400402 5110607p and the approved inspection program dated 13012020. The objectives of this inspection are to identify and prevent violations of the requirements of the design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used. The subject of this inspection is the compliance of the work and the applied construction materials during the construction of the capital construction facility, as well as the results of such work, meet the requirements of the design documentation code 1851901 of ACC LLC, including the requirements for energy efficiency and the requirements for equipping the capital construction facility with metering devices for energy resources used in the construction of multilayer external and internal walls of the aboveground part of the building, the installation of ventilation ducts, the construction of internal walls and partitions, the installation of floor slabs stairwells and flights of stairs, filling of window and door openings, installation of external and internal engineering networks during finishing works, provision of executive documentation
# 562004205120
Unscheduled inspection
Start date: 2020-01-22, end date: —, duration: —
Authority: —
Purpose of inspection:
# 562004204929
Unscheduled inspection
Start date: 2020-01-22, end date: 2020-01-28, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Orenburgskoi oblasti
Purpose of inspection: This inspection is carried out in order to carry out regional state construction supervision on the basis of the notice of the start of construction dated 10012020 bx 09. The objectives of this inspection are to identify and prevent violations of the requirements of the design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used. The subject of this inspection is the compliance of the work and the construction materials used during the construction of the capital construction facility, as well as the results of such work, the requirements of the design documentation code 1851903 of ACC LLC, including the requirements for energy efficiency and the requirements for equipping the capital construction facility with metering devices for the energy resources used during the preparatory period of excavation work, the construction of exterior and interior walls and partitions of the building, the filling of window and door openings, the installation of exterior and internal engineering networks of finishing works provision of executive documentation
# 562004205017
Unscheduled inspection
Start date: 2020-01-22, end date: —, duration: —
Authority: —
Purpose of inspection:
# 562004204704
Unscheduled inspection
Start date: 2020-01-22, end date: 2020-01-28, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Orenburgskoi oblasti
Purpose of inspection: This inspection is carried out in order to carry out regional state construction supervision on the basis of the notice of the start of construction dated 10012020 bx 09. The objectives of this inspection are to identify and prevent violations of the requirements of the design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used. 6 The subject of this inspection is the compliance of the work and the applied construction materials during the construction of the capital construction facility, as well as the results of such work, meet the requirements of the design documentation code 1851901 of ACC LLC, including the requirements for energy efficiency and the requirements for equipping the capital construction facility with metering devices for energy resources used during the preparatory period of excavation work, the construction of exterior and interior walls and partitions of the building, the filling of window and door openings, the installation of exterior and internal engineering networks of finishing works provision of executive documentation
# 562004204851
Unscheduled inspection
Start date: 2020-01-22, end date: —, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Orenburgskoi oblasti
Purpose of inspection: