# 742005235932
Unscheduled inspection
Start date: 2020-11-23, end date: —, duration: —
Authority: —
Purpose of inspection:
# 742005189538
Unscheduled inspection
Start date: 2020-10-27, end date: 2020-11-02, duration: 5
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work on the installation of the attic after completion of work Installation of deflectors Insulation of the attic Insulation of the floors of the technical floor Installation of panel seams Installation of elevators Facade painting Installation of windows Installation of interior doors Installation of entrance doors Installation of internal networks of water supply sewerage heating Installation ETC Internal electrical work Installation of communication networks intercom networks fire alarm Internal finishing work Outdoor plumbing Device Outdoor sewerage device external heat supply networks Landscaping Landscaping works Installation of IAF during the execution of works and construction materials used during the construction reconstruction of a capital construction facility as well as the results of such work to the requirements of the project documentation approved in accordance with Parts 15 152 and 153 of Article 48 of this Code, taking into account the changes made to the project documentation in accordance with parts 38 and 39 Article 49 of this Code and or an information model if the formation and maintenance of an information model are mandatory in accordance with the requirements of this Code, including energy efficiency requirements, with the exception of capital construction projects for which energy efficiency requirements do not apply and the requirements for equipping a capital construction facility with metering devices for energy resources used 2 Availability of a construction permit 3 Performance requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 742004484247
Unscheduled inspection
Start date: 2020-08-17, end date: 2020-08-21, duration: 5
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 the work on installation of window frames made of PVC installation of networks of water supply and sanitation installing sanitary equipment installation of power supply in the process of work the switchboard device after completion of installation of the heating system in the process of work, installation of communication networks and intercom system after completion of the installation of Elevator equipment in the process of performance device ETC after completion of the device interior decorating installing wooden interior doors in the process of work installing metal entrance door units arrangement of external interpanel seams and colouring of the facade installation external Sewerage networks K1 installation of permanent power supply networks after completion of the landscaping in the process of work and construction materials used in the construction process of reconstruction of capital construction object and the results of such work requirements approved in accordance with paragraphs 152 and 153 of 15 of article 48 of this Code project documentation to reflect changes made to the project documentation in accordance with paragraphs 38 and 39 of article 49 of this Code or information model in the case of the formation and maintenance of information models are required in accordance with the requirements of this Code, including the requirements of energy efficiency with the exception of capital construction objects, for which the energy performance requirements shall not apply and the requirements of the equipment of a capital construction object metering devices used energy ресурсов2 have permission to строительство3 fulfillment of the requirements of CC 23 and 31 ст52 of the town planning code of the Russian Federation
# 742004462286
Unscheduled inspection
Start date: 2020-07-27, end date: 2020-07-31, duration: 5
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work on the installation of PVC window blocks installation of internal water supply and sanitation networks installation of sanitary appliances installation of internal power supply networks installation of internal heating networks installation of communication networks and intercom system installation of elevator equipment, etc. installation of interior finishing works installation of wooden interior door blocks installation of metal entrance door blocks installation of external panel seams and facade painting installation on and used building materials in the process of construction reconstruction of a capital construction facility as well as the results of such work to the requirements of the project documentation approved in accordance with Parts 15 152 and 153 of Article 48 of this Code, taking into account the changes made to the project documentation in accordance with parts 38 and 39 of Article 49 of this Code and or the information model if the formation and maintaining an information model is mandatory in accordance with the requirements of this Code, including energy efficiency requirements, with the exception of capital construction projects for which energy efficiency requirements do not apply and the requirements for equipping a capital construction facility with metering devices for energy resources used 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 741903948093
Unscheduled inspection
Start date: 2019-11-15, end date: 2019-11-21, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 1 Compliance of the work on the installation of elevator equipment, the installation of floors of the technical floor, the execution of facade works, the laying of engineering networks in the basement, the installation of floors in the basement, the installation of small forms, the landscaping of the territory and the construction materials used during the construction reconstruction of the capital construction facility, as well as the results of such work, with the requirements approved in accordance with parts 15 152 and 153 of Article 48 of this code The Code of Project Documentation, taking into account the changes made to the project documentation in accordance with parts 38 and 39 of Article 49 of this Code and or the information model, if the formation and maintenance of an information model are mandatory in accordance with the requirements of this Code, including energy efficiency requirements, with the exception of capital construction projects to which energy efficiency requirements do not apply and requirements for the equipment of the capital construction facility with metering devices for used energy resources2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 741903479320
Unscheduled inspection
Start date: 2019-09-20, end date: 2019-09-26, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the installation of elevator equipment and construction materials used during the construction of a capital construction facility as well as the results of such work with the requirements of project documentation2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 741802122024
Unscheduled inspection
Start date: 2018-11-19, end date: 2018-12-14, duration: —
Authority: Gosudarstvennaya inspekciya truda v CHelyabinskoi oblasti
Purpose of inspection: implementation of federal state supervision over compliance with labor legislation and other regulatory legal acts containing labor law norms in connection with the received appeal of an employee of Soyuzliftmontazhservice LLC on violation of labor rights vx 747421218OB as well as a reasoned representation of an official
# 74160701096975
Unscheduled inspection
Start date: 2016-11-11, end date: 2016-11-17, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1The compliance of the processes of facade installation of electric power systems, pumping fire extinguishing, elevators, landscaping, as well as the construction materials used in the construction of a capital construction facility, the results of such work with the requirements of technical regulations of project documentation2the presence of a construction permit3the fulfillment of the requirements of hh 23 st52 of the Urban Planning Code of the Russian Federation