# 742101171058
Unscheduled inspection
Start date: 2021-10-11, end date: 2021-10-15, duration: 5
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1. Compliance of work on finishing of common areas in block sections of a residential building, installation of switchboards, etc. and construction materials used during construction, reconstruction of a capital construction facility, as well as the results of such work with the requirements of the project documentation approved in accordance with Parts 15, 15.2 and 15.3 of Article 48 of this Code (taking into account changes made to the project documentation in accordance with Parts 3.8 and 3.9 of Article 49 of this Code) and (or) an information model (if the formation and maintenance of an information model are mandatory in accordance with the requirements of this Code), including energy efficiency requirements (with the exception of capital construction projects for which the requirements energy efficiency does not apply) and the requirements for equipping a capital construction facility with metering devices for energy resources used. 2. Availability of a building permit. 3. Compliance with the requirements of Parts 2.3 and 3.1 of Article 52 of the Urban Planning Code of the Russian Federation.
# 742100706677
Unscheduled inspection
Start date: 2021-09-17, end date: —, duration: —
Authority: —
Purpose of inspection: