Found 12 inspections:

# 772101512269
Unscheduled inspection
Start date: 2021-12-23, end date: 2021-12-24, duration: 2
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The purpose of the audit: carrying out control measures in connection with the verification of compliance with the instruction; The tasks of the audit: prevention, detection and suppression of violations of the requirements of project documentation, legislation on urban development by the audited person; The subject of the audit: verification of the elimination of violations specified in the instruction issued by Mosgosstroynadzor


# 772101204445
Unscheduled inspection
Start date: 2021-10-14, end date: 2021-10-15, duration: 2
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The purpose of the audit: carrying out control measures in connection with the verification of compliance with the instruction; The tasks of the audit: prevention, detection and suppression of violations of the requirements of project documentation, legislation on urban development by the audited person; The subject of the audit: verification of the elimination of violations specified in the instruction issued by Mosgosstroynadzor


# 262101171919
Unscheduled inspection
Start date: 2021-10-06, end date: —, duration:
Authority: Ministerstvo stroitelstva i arhitektury Stavropolskogo kraya
Purpose of inspection:


# 262101246187
Unscheduled inspection
Start date: 2021-10-20, end date: —, duration: 20
Authority: Ministerstvo stroitelstva i arhitektury Stavropolskogo kraya
Purpose of inspection: This inspection is carried out for the purpose of: notifying Sphere Plus LLC of the completion of works subject to inspection in accordance with the inspection program dated 02/26/2021 No. 21/01-2021 (Stage 2); The objectives of this audit are to prevent, identify and suppress violations of the legislation on urban development, including technical regulations and project documentation, committed by the developer, the technical customer, the person carrying out the construction; The subject of this review is: - compliance with the procedure for conducting construction control, maintaining general and (or) special work logs, executive documentation, drawing up acts of inspection of works, structures, sections of engineering support networks; - compliance with the compliance of the work performed and the construction materials and products used in the construction process, reconstruction of the capital construction facility, as well as the results of such work with the requirements of the approved design documentation; - compliance with mandatory requirements and (or) requirements established by municipal legal acts.


# 772101231431
Unscheduled inspection
Start date: 2021-10-18, end date: —, duration:
Authority:
Purpose of inspection:


# 772100590841
Unscheduled inspection
Start date: 2021-08-30, end date: —, duration:
Authority:
Purpose of inspection:


# 262100430568
Unscheduled inspection
Start date: 2021-08-05, end date: —, duration:
Authority: Ministerstvo stroitelstva i arhitektury Stavropolskogo kraya
Purpose of inspection:


# 262100375313
Unscheduled inspection
Start date: 2021-07-21, end date: —, duration:
Authority:
Purpose of inspection:


# 772100323119
Unscheduled inspection
Start date: 2021-06-29, end date: 2021-06-30, duration: 2
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit: carrying out control measures in connection with the implementation of the audit program; The tasks of the audit: prevention, identification and suppression of violations of the requirements of project documentation, legislation on urban development by the audited person; The subject of the audit: compliance of the work and the construction materials used in the construction process, reconstruction of the capital construction facility, as well as the results of such work with the requirements design documentation, including the requirements of energy efficiency and the requirements for equipping the capital construction facility with metering devices for energy resources used, including checking the elimination of violations of compliance of completed works with the requirements of design documentation identified during construction control and state construction supervision


# 262100038800
Unscheduled inspection
Start date: 2021-03-15, end date: 2021-04-09, duration: 20
Authority: Ministerstvo stroitelstva i arhitektury Stavropolskogo kraya
Purpose of inspection: This check is carried out for the purpose of: notification dated 02/16/2021 bx. No. 2137/01-04 LLC "Sphere Plus" on the completion of works subject to inspection in accordance with the inspection program dated 08.09.2020 No. 21/10 2020 (5th stage); The objectives of this audit are to prevent, identify and suppress violations of the legislation on urban development, including technical regulations and project documentation, committed by the developer, the technical customer, the person carrying out the construction; The subject of this review is: - compliance with the procedure for conducting construction control, maintaining general and (or) special work logs, executive documentation, drawing up acts of inspection of works, structures, sections of engineering support networks; - compliance with other requirements when performing work established by the design documentation, including requirements for energy efficiency and requirements for equipping the capital construction facility with metering devices for energy resources used; - compliance with mandatory requirements and (or) requirements established by municipal legal acts


# 262005266452
Unscheduled inspection
Start date: 2020-12-09, end date: 2021-01-14, duration: 20
Authority: Ministerstvo stroitelstva i arhitektury Stavropolskogo kraya
Purpose of inspection: this inspection is carried out for the purpose of the inspection program from 08092020 2110 2020 the 3rd stage of this inspection are the prevention identification and suppression of violations of the legislation on urban development activities committed by the developer, the technical customer, the person carrying out the construction, including technical regulations and design documentationthe subject of this inspection is compliance with the procedure for conducting construction control, maintaining general and or special work logs, executive documentation, drawing up inspection acts works of structures of sections of engineering and technical support networks compliance with other requirements when performing works established by the design documentation, including requirements for energy efficiency and requirements for equipping a capital construction facility with metering devices for energy resources used compliance with mandatory requirements and or requirements established by municipal legal acts


# 262005202693
Unscheduled inspection
Start date: 2020-10-27, end date: —, duration:
Authority:
Purpose of inspection:


Information about inspections

This section displays information about planned and carried out inspections of control (supervision) bodies in accordance with Federal Law No. 294-FZ. Detailed information about the inspection can be obtained from the Unified Register of Inspections of the Prosecutor General's Office.