# 742004408978
Unscheduled inspection
Start date: 2020-05-18, end date: 2020-05-22, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the construction of the building frame on the 16th floor with the installation of external and internal enclosing structures on the 16th floor and the construction materials used during the construction reconstruction of the capital construction facility, as well as the results of such work, with the requirements of the design documentation approved in accordance with parts 15 152 and 153 of Article 48 of this Code, taking into account the changes made to the design documentation in accordance with paragraphs 38 and 39 of Article 49 of this Code and or the information model, if the formation and maintenance of an information model are mandatory in accordance with the requirements of this Code, including energy efficiency requirements, with the exception of capital construction facilities to which energy efficiency requirements do not apply and the requirements for equipping the capital construction facility with metering devices for used energy resources2 The availability of permits for building3 Meeting the requirements of hr 23 and 31st52 of the Urban Planning Code of the Russian Federation
# 741902972586
Unscheduled inspection
Start date: 2019-08-15, end date: 2019-09-11, duration: —
Authority: Gosudarstvennaya inspekciya truda v CHelyabinskoi oblasti
Purpose of inspection: This audit is conducted in order to carry out federal state supervision over compliance with labor legislation and other regulatory legal acts containing labor law norms, including on issues of remuneration in connection with the received appeal HC 747365619OB dated 13082019the objectives of this audit are to ensure that the employer complies with the labor legislation of the Russian Federation and other regulatory legal acts containing labor law norms and compliance with mandatory requirements and or requirements established by the Legislation of the Russian Federation. municipal legal acts
# 741802130789
Unscheduled inspection
Start date: 2018-11-22, end date: 2018-11-28, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the installation of load-bearing structures of the technical floor roofing during the installation of window structures of 320 floors during the construction process and the construction materials used during the construction reconstruction of the capital construction facility as well as the results of such work with the requirements of the technical regulations of the project documentation 2 Availability of a building permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code Russian Federation
# 741800103349
Unscheduled inspection
Start date: 2018-02-28, end date: —, duration: —
Authority: —
Purpose of inspection:
# 74170701652371
Unscheduled inspection
Start date: 2017-05-31, end date: 2017-06-06, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1The compliance of the work on the installation of monolithic floors and enclosing structures of the fourteenth floor and the building materials used during the construction of the reconstruction of the capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation2the need for a construction permit3the requirements of hh 23 st52 of the Urban Planning Code of the Russian Federation
# 74170701493327
Unscheduled inspection
Start date: 2017-04-03, end date: —, duration: —
Authority: —
Purpose of inspection:
# 74170701489630
Unscheduled inspection
Start date: 2017-03-30, end date: 2017-04-05, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1The compliance of the work on the installation of the foundation plate in axes 137 and the installation of the parking frame in axes 137 and in the course of work and the construction materials used during the construction reconstruction of the capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation2the need for a construction permit3compliance with the requirements of hh 23 st52 of the Urban Planning Code of the Russian Federation
# 74170701378250
Unscheduled inspection
Start date: 2017-02-14, end date: —, duration: —
Authority: —
Purpose of inspection: