# 772100042125
Unscheduled inspection
Start date: 2021-03-05, end date: 2021-03-10, duration: 3
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The purpose of the audit: carrying out control measures in connection with the verification of compliance with the instruction; The tasks of the audit: prevention, detection and suppression of violations of the requirements of project documentation, legislation on urban development by the audited person; The subject of the audit: verification of the elimination of violations specified in the instruction issued by Mosgosstroynadzor
# 772105325842
Unscheduled inspection
Start date: 2021-01-26, end date: 2021-01-28, duration: 3
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit: carrying out control measures in connection with the implementation of the audit program; The tasks of the audit: prevention, identification and suppression of violations of the requirements of project documentation, legislation on urban development by the audited person; The subject of the audit: compliance of the work and the construction materials used in the construction process, reconstruction of the capital construction facility, as well as the results of such work with the requirements design documentation, including the requirements of energy efficiency and the requirements for equipping the capital construction facility with metering devices for energy resources used, including checking the elimination of violations of compliance of completed works with the requirements of design documentation identified during construction control and state construction supervision
# 772004375581
Unscheduled inspection
Start date: 2020-03-23, end date: 2020-03-25, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit are to carry out control measures in connection with the implementation of the verification program verification tasks prevention identification and suppression of violations of the requirements of the design documentation of the legislation on urban planning activity by the audited person, subject to verification of compliance of the work and construction materials used during the construction reconstruction of the capital construction facility as well as the results of such work with the requirements of the design documentation, including energy efficiency requirements and equipment requirements of the capital construction facility metering devices for energy resources used
# 772004237249
Unscheduled inspection
Start date: 2020-01-28, end date: 2020-01-31, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit are to carry out control measures in connection with the verification of compliance with the requirements of the task of the audit, to prevent the identification and suppression of violations of the requirements of the design documentation of the legislation on urban planning activity by the audited person, to verify the elimination of violations specified in the order issued by Mosgosstroynadzor
# 771904117193
Unscheduled inspection
Start date: 2019-12-18, end date: 2019-12-18, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit are to carry out control measures in connection with the receipt of a notification from the developer of the customer's task of verification, to prevent the identification and suppression of violations of the requirements of the design documentation of the legislation on urban planning activity by the audited person, to check and verify the elimination of violations specified in the order issued by Mosgosstroynadzor
# 771903925782
Unscheduled inspection
Start date: 2019-11-05, end date: —, duration: —
Authority: —
Purpose of inspection:
# 771903732723
Unscheduled inspection
Start date: 2019-09-27, end date: 2019-10-01, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit are to carry out control measures in connection with checking the fulfillment of the prescriptionthe tasks of the audit are to prevent identify and suppress violations of the requirements of the design documentation of the legislation on urban development activity by the audited person. The purpose of the audit is to verify the elimination of violations specified in the prescription issued by Mosgosstroynadzor
# 77190803492832
Unscheduled inspection
Start date: 2019-09-05, end date: —, duration: —
Authority: —
Purpose of inspection:
# 77190803481856
Unscheduled inspection
Start date: 2019-08-26, end date: 2019-09-05, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: carrying out control measures in connection with the implementation of the verification program to prevent the identification and suppression of violations of the requirements of the design documentation of the legislation on urban development activity by the person being audited. compliance of the work and construction materials used during the construction of the reconstruction of the capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation, including the requirements of energy efficiency and the requirements of equipment of the capital construction facility with devices accounting for the energy resources used
# 77190803460254
Unscheduled inspection
Start date: 2019-07-23, end date: 2019-08-05, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit are to carry out control measures in connection with the verification of compliance with the requirements of the task of the audit, to prevent the identification and suppression of violations of the requirements of the design documentation of the legislation on urban planning activity by the audited person, to verify the elimination of violations specified in the order issued by Mosgosstroynadzor
# 77190803450638
Unscheduled inspection
Start date: 2019-07-04, end date: —, duration: —
Authority: —
Purpose of inspection:
# 77190803439770
Unscheduled inspection
Start date: 2019-06-18, end date: 2019-06-28, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: This audit is conducted in order to carry out control measures in connection with the implementation of the inspection program based on the approved inspection program from 04042016 BNTHE objectives of this audit are to prevent identify and suppress violations of the requirements of the design documentation of the legislation on urban development by the person being audited. The subject of this audit is the compliance of the work and the construction materials used during the construction reconstruction of the capital construction facility as well as the results of such work meet the requirements of the technical regulations of the project documentation, including the requirements for energy efficiency and the requirements for equipping the capital construction facility with metering devices for used energy resources.
# 77190803448150
Unscheduled inspection
Start date: 2019-06-28, end date: 2019-07-03, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: carrying out control measures in connection with the verification of compliance with the prescriptionrevention detection and suppression of violations of the requirements of the design documentation of the legislation on urban development activity by the person being checked, verification of the elimination of violations specified in the prescription issued by Mosgosstroynadzor
# 77190803415412
Unscheduled inspection
Start date: 2019-05-22, end date: 2019-06-19, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit are to carry out control measures in connection with the implementation of the verification program. The tasks of the audit are to prevent the identification and suppression of violations of the requirements of the design documentation of the legislation on urban development by the audited person. The subject is to verify the compliance of the work and the construction materials used during the construction of the reconstruction of the capital construction facility, as well as the results of such work with the requirements of the technical regulations of the design documentation, including the requirements of energy efficiency and the requirements of the facility's equipment capital construction accounting devices for used energy resourcesperformance by the person carrying out the construction of the requirements of part 3 of Article 52 of the Urban Planning Code
# 77190803410163
Unscheduled inspection
Start date: 2019-05-28, end date: —, duration: —
Authority: —
Purpose of inspection:
# 77190803402860
Unscheduled inspection
Start date: 2019-04-26, end date: 2019-05-16, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: carrying out control measures in connection with the implementation of the verification program to prevent the identification and suppression of violations of the requirements of the design documentation of the legislation on urban development activity by the person being audited. compliance of the work and construction materials used during the construction of the reconstruction of the capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation, including the requirements of energy efficiency and the requirements of equipment of the capital construction facility with devices accounting for the energy resources used
# 77190803368840
Unscheduled inspection
Start date: 2019-03-15, end date: —, duration: —
Authority: —
Purpose of inspection:
# 77190803382825
Unscheduled inspection
Start date: 2019-03-29, end date: —, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection:
# 77190803318082
Unscheduled inspection
Start date: 2019-01-24, end date: 2019-02-19, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: elimination of violations specified in the order issued by Mosgosstroynadzor Verification of elimination of violations specified in the order issued by Mosgosstroynadzor
# 77180803307343
Unscheduled inspection
Start date: 2018-12-26, end date: 2019-01-18, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used
# 77180803276757
Unscheduled inspection
Start date: 2018-11-16, end date: 2018-11-21, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor
# 77180803261738
Unscheduled inspection
Start date: 2018-10-29, end date: 2018-11-26, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor
# 77180803240670
Unscheduled inspection
Start date: 2018-09-26, end date: 2018-09-28, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor
# 77180803200715
Unscheduled inspection
Start date: 2018-08-15, end date: 2018-09-11, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used
# 77180803193536
Unscheduled inspection
Start date: 2018-08-13, end date: 2018-08-22, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used
# 77180803211279
Unscheduled inspection
Start date: 2018-08-27, end date: 2018-08-29, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor
# 77180803163877
Unscheduled inspection
Start date: 2018-07-04, end date: —, duration: —
Authority: —
Purpose of inspection:
# 77180803183694
Unscheduled inspection
Start date: 2018-07-20, end date: —, duration: —
Authority: —
Purpose of inspection:
# 77180803182528
Unscheduled inspection
Start date: 2018-07-20, end date: —, duration: —
Authority: —
Purpose of inspection:
# 77180803137895
Unscheduled inspection
Start date: 2018-05-14, end date: 2018-05-16, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used, verification of the elimination of violations specified in the order issued by Mosgosstroynadzor
# 77180803116243
Unscheduled inspection
Start date: 2018-04-09, end date: 2018-05-08, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used
# 77180803106227
Unscheduled inspection
Start date: 2018-03-22, end date: —, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection:
# 77180803110920
Unscheduled inspection
Start date: 2018-03-27, end date: 2018-03-29, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used
# 77170802941951
Unscheduled inspection
Start date: 2017-12-07, end date: 2017-12-08, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor
# 77170802893122
Unscheduled inspection
Start date: 2017-11-27, end date: —, duration: —
Authority: —
Purpose of inspection:
# 77170802794667
Unscheduled inspection
Start date: 2017-10-30, end date: 2017-10-31, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor
# 77170801950702
Unscheduled inspection
Start date: 2017-09-26, end date: —, duration: —
Authority: —
Purpose of inspection:
# 77170802504669
Unscheduled inspection
Start date: 2017-09-21, end date: —, duration: —
Authority: —
Purpose of inspection:
# 77170701836857
Unscheduled inspection
Start date: 2017-07-28, end date: —, duration: —
Authority: —
Purpose of inspection:
# 77170701682205
Unscheduled inspection
Start date: 2017-07-03, end date: 2017-07-28, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used
# 77170701703470
Unscheduled inspection
Start date: 2017-06-14, end date: —, duration: —
Authority: —
Purpose of inspection:
# 77170701463022
Unscheduled inspection
Start date: 2017-03-29, end date: —, duration: —
Authority: —
Purpose of inspection:
# 77160701211376
Unscheduled inspection
Start date: 2016-12-07, end date: —, duration: —
Authority: —
Purpose of inspection:
# 77160701155144
Unscheduled inspection
Start date: 2016-12-01, end date: 2016-12-19, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor
# 77160701111475
Unscheduled inspection
Start date: 2016-11-15, end date: 2016-11-16, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor based on the expiration of the deadline for the execution by a legal entity, an individual entrepreneur, of an order issued by the state construction supervision authority to eliminate an identified violation of mandatory requirements, prevention of the identification and suppression of violations of technical regulations and project documentation by the person being audited, verification of the elimination of violations specified in the order issued by Mosgosstroynadzor 967116 dated 26092016
# 77160701016735
Unscheduled inspection
Start date: 2016-10-19, end date: 2016-11-14, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The audit is carried out in order to ensure that the capital construction facility meets the requirements of technical regulations and design documentation on the basis of an approved verification program. The objectives of this audit are to prevent, identify and suppress violations of technical regulations and design documentation6 committed by the audited person. The subject of this audit is the compliance of the work and construction materials used in the construction process of reconstruction of the capital construction facility as well as the results of such work with technical requirements regulations of the project documentation, including the requirements of energy efficiency and the requirements of equipment of the capital construction facility with metering devices for used energy resources
# 77160701044127
Unscheduled inspection
Start date: 2016-10-21, end date: 2016-10-27, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the capital construction facility with the requirements of technical regulations and project documentation on the basis of the approved verification program prevention detection and suppression of violations of technical regulations and project documentationproviding the elimination of violations specified in the instruction issued by Mosgosstroynadzor 907416 dated 29082016 compliance of the work and construction materials used during the construction reconstruction of the capital construction facility as well as the results of such work with the requirements of the technical regulations of the project documentation, including energy efficiency requirements and requirements for equipping a capital construction facility with metering devices for used energy resources
# 77160700090155
Unscheduled inspection
Start date: 2016-09-02, end date: 2016-09-02, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The inspection is carried out in order to eliminate violations specified in the order issued by Mosgosstroynadzor on the basis of a notification received from the developer the customer or the person carrying out the construction on the elimination of violations. The objectives of this inspection are to prevent identify and suppress violations of technical regulations and project documentation committed by the person being audited. The purpose of this inspection is to verify the elimination of violations specified in the order issued by Mosgosstroynadzor 781716 dated 29072016
# 77160700412795
Unscheduled inspection
Start date: 2016-09-15, end date: —, duration: —
Authority: —
Purpose of inspection:
# 77160700058787
Unscheduled inspection
Start date: 2016-08-25, end date: 2016-08-29, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the capital construction facility with the requirements of technical regulations and project documentation on the basis of the approved verification program prevention detection and suppression of violations of technical regulations and project documentationproviding the elimination of violations specified in the instruction issued by Mosgosstroynadzor 722816 dated 12072016 compliance of the work and construction materials used during the construction reconstruction of the capital construction facility as well as the results of such work with the requirements of the technical regulations of the project documentation, including energy efficiency requirements and requirements for equipping a capital construction facility with metering devices for used energy resources
# 77160601731025
Unscheduled inspection
Start date: 2016-07-22, end date: 2016-07-29, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: the audit is carried out in order to ensure that the capital construction facility meets the requirements of technical regulations and design documentation on the basis of an approved verification program. The objectives of this audit are to prevent, identify and suppress violations of technical regulations and design documentation committed by the person being audited. The subject of this audit is the compliance of the work and construction materials used in the construction process of reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations design documentation, including requirements for energy efficiency and requirements for the equipment of the capital construction facility with metering devices for energy resources used
# 77160601695207
Unscheduled inspection
Start date: 2016-07-08, end date: —, duration: —
Authority: —
Purpose of inspection: