# 002005241938
Unscheduled inspection
Start date: 2020-11-25, end date: 2020-12-15, duration: 15
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This inspection is carried out in order to implement the inspection program approved by Order No. 572759 dated April 22, 2019 in order to monitor the compliance of completed works with the mandatory requirements of technical regulations and other regulatory legal acts of project documentation with the requirements for energy conservation and energy efficiency improvement during the construction of a capital construction facility. The objectives of this inspection are to prevent identify and suppress violations of mandatory requirements of regulatory documents and legislative acts. The purpose of this check is to note the necessary compliance of the work performed and the building materials used during the construction of the reconstruction of the capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation, including the requirements for energy efficiency and the requirements for equipping the capital construction facility with metering devices for energy resources used, the availability of a construction permit, and compliance with the requirements set out in Parts 2 3 and 3_1 of Article 52 of this Code
# 002004340757
Unscheduled inspection
Start date: 2020-03-06, end date: 2020-04-03, duration: —
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: verification of the execution of regulation 575149P from 01112019
# 001903881151
Unscheduled inspection
Start date: 2019-10-22, end date: 2019-11-12, duration: —
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This audit is conducted in order to monitor the fulfillment by a legal entity, an individual entrepreneur, of the paragraphs of the regulation on the elimination of identified violations of mandatory requirements 570900319C dated March 1, 2019, previously issued by the state construction supervision authority. The objectives of this audit are to verify that the legal entity eliminates the violations identified in paragraphs 570900319C dated March 1, 2019.
# 001903021506
Unscheduled inspection
Start date: 2019-09-16, end date: —, duration: —
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection:
# 001903021489
Unscheduled inspection
Start date: 2019-09-17, end date: 2019-09-25, duration: —
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This inspection is carried out in order to verify the completed construction of a capital construction facility on the basis of the completion notice 003PHU dated August 16, 2019 in order to monitor the compliance of completed works with the mandatory requirements of technical regulations and other regulatory legal acts of project documentation with the requirements for energy conservation and energy efficiency improvement during the construction of a capital construction facility. The objectives of this inspection are to prevent identify and suppress violations of mandatory The subject of this audit is the compliance of the work performed and the building materials used during the construction reconstruction of the capital construction facility as well as the results of such work with the requirements of the technical regulations of the project documentation, including the requirements for energy efficiency and the requirements for equipping the capital construction facility with metering devices for energy resources used, the availability of a construction permit, and compliance with the requirements set out in Parts 2 3 and 3_1 of Article 52 of this Code
# 001902956466
Unscheduled inspection
Start date: 2019-08-12, end date: 2019-08-16, duration: —
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: The purpose is to verify the implementation of paragraph 14 of regulation No. 574358P dated June 28, 2019 issued by the Severouralsky Rostechnadzor managementThe task is to verify the elimination of violations identified as part of an unscheduled on-site inspection conducted by the Severouralsky Rostechnadzor Management in relation to SIBUR Tobolsk LLCThe subject is the fulfillment of the instructions of the state control bodies supervision of municipal control bodies
# 001902926077
Unscheduled inspection
Start date: 2019-08-07, end date: 2019-09-03, duration: —
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This audit is conducted in order to implement the audit program approved by 572759 dated April 22, 2019 in order to monitor the compliance of completed works with the mandatory requirements of technical regulations and other regulatory legal acts of project documentation with the requirements for energy conservation and energy efficiency improvement during the construction of a capital construction facility. The objectives of this audit are to prevent identify and suppress violations of mandatory requirements of regulatory documents and legislative acts. The purpose of the inspection is to note the necessary compliance of the work performed and the building materials used during the construction of the reconstruction of the capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation, including the requirements for energy efficiency and the requirements for equipping the capital construction facility with metering devices for energy resources used, the availability of a construction permit, and compliance with the requirements established by Parts 2 3 and 3_1 of Article 52 of this Code. The Code
# 001902833335
Unscheduled inspection
Start date: 2019-07-02, end date: 2019-07-29, duration: —
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This inspection is carried out in order to verify the completed construction of a capital construction facility on the basis of the completion notice 003OCT dated June 13, 2019 in order to monitor the compliance of completed works with the mandatory requirements of technical regulations and other regulatory legal acts of project documentation with the requirements for energy conservation and energy efficiency improvement during the construction of a capital construction facility. The objectives of this inspection are to prevent identify and suppress violations of mandatory The subject of this audit is the compliance of the work performed and the building materials used during the construction reconstruction of the capital construction facility as well as the results of such work with the requirements of the technical regulations of the project documentation, including the requirements for energy efficiency and the requirements for equipping the capital construction facility with metering devices for energy resources used, the availability of a construction permit, and compliance with the requirements set out in Parts 2 3 and 3_1 of Article 52 of this Code
# 001902646616
Unscheduled inspection
Start date: 2019-04-09, end date: 2019-04-23, duration: —
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Purpose verification of compliance verification of compliance with the regulations dated November 30, 2018 A572011300032018004P01 regulations dated November 30, 2018 A572011300032018004P03 regulations dated November 30, 2018 A572011300032018004P04 issued by the North Ural Rostechnadzor Department Tasks verification of the elimination of violations identified as part of planned and unscheduled field inspections of regulations conducted by the North Ural Rostechnadzor Department in relation to SIBUR Tobolsk LLC Subject to compliance with the regulations of state control bodies supervision of municipal control bodies
# 001902586807
Unscheduled inspection
Start date: 2019-03-20, end date: 2019-04-16, duration: —
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This inspection is carried out in order to verify the completed construction of a capital construction facility on the basis of the completion notice 002OCT dated March 15, 2019 in order to monitor the compliance of completed works with the mandatory requirements of technical regulations and other regulatory legal acts of project documentation with the requirements for energy conservation and energy efficiency improvement during the construction of a capital construction facility. The objectives of this inspection are to prevent identify and suppress violations of mandatory requirements of regulatory documents and legislative acts The subject of this audit is the compliance of the work performed and the building materials used during the construction reconstruction of the capital construction facility as well as the results of such work with the requirements of the technical regulations of the project documentation, including the requirements for energy efficiency and the requirements for equipping the capital construction facility with metering devices for energy resources used, the availability of a construction permit, and compliance with the requirements set out in Parts 2 3 and 3_1 of Article 52 of this Code
# 001902432269
Unscheduled inspection
Start date: 2019-01-14, end date: 2019-02-08, duration: —
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: In order to verify the fulfillment of the order dated September 8, 2017 578060P2 issued by the North Ural Rostechnadzor Department, the objectives of this audit are to prevent identify and suppress violations of mandatory requirements of regulatory documents and legislative acts in the field of safety of hydraulic structures and to take measures to eliminate violations of mandatory requirements if they are identified and to bring to justice persons who have committed violations of the requirements of federal laws and regulations. other regulatory legal acts
# 001802083522
Unscheduled inspection
Start date: 2018-11-12, end date: —, duration: —
Authority: —
Purpose of inspection:
# 001801596131
Unscheduled inspection
Start date: 2018-09-19, end date: 2018-09-28, duration: —
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: The purpose is to verify compliance with the regulations of the North Ural Rostechnadzor Department dated December 15, 2018 5712772P points 1 6 regulations of the North Ural Rostechnadzor Department dated June 26, 2018 572641P points 1 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80 81 82 83 84 85 86 87 88 89 90 91 92 93 95 96 97 98 99 100 101 102 103 104 105 106 107 108 109 110 111 112 118 120 121 122 124 125 126 128 129 regulations of the North Ural Department of Rostechnadzor dated June 26, 2018 572643P Tasks verification of the elimination of violations identified as part of unscheduled field inspections regulations conducted by the North Ural Department of Rostechnadzor in relation to SIBUR Tobolsk LLC Subject to compliance with the regulations of state bodies control supervision of municipal control bodies
# 001800533441
Unscheduled inspection
Start date: 2018-07-09, end date: 2018-08-03, duration: —
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This audit is conducted in order to implement the audit program approved by 5785 dated January 12, 2018 in order to monitor the compliance of completed works with the mandatory requirements of technical regulations and other regulatory legal acts of project documentation with the requirements for energy conservation and energy efficiency improvement during the construction of a capital construction facility. The objectives of this audit are to prevent identify and suppress violations of mandatory requirements of regulatory documents and legislative acts The subject of this audit is to note the necessary compliance of the work performed and the building materials used during the construction of the reconstruction of the capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation, including the requirements for energy efficiency and the requirements for equipping the capital construction facility with metering devices for energy resources used, the availability of a construction permit, and compliance with the requirements set out in Parts 2 3 and 3_1 of the article 52 of this Code
# 00170802913589
Unscheduled inspection
Start date: 2017-12-07, end date: 2017-12-22, duration: —
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: To establish that this audit is being conducted in order to verify the implementation of paragraphs 910 20 29 of Regulation No. 578060P1 of September 8, 2017 issued by the Severouralsky Administration of Rostechnadzor. The objectives of this audit are to verify the elimination of violations identified by the Severouralsky Administration of Rostechnadzor during the audit of the Limited Liability Company SIBUR TobolskThe subject of this audit is the fulfillment of the instructions of the state control bodies of supervision of municipal control bodies
# 00170802630431
Unscheduled inspection
Start date: 2017-10-09, end date: —, duration: —
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection:
# 00170802733448
Unscheduled inspection
Start date: 2017-10-05, end date: 2017-10-25, duration: —
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: To establish that this audit is being conducted in order to verify the implementation of paragraphs 18 1119 2128 3065 of the letter dated September 08, 2017 578060P1 issued by the Northern Ural Directorate of Rostechnadzor. The objectives of this audit are to verify the elimination of violations identified by the Northern Ural Directorate of Rostechnadzor and to verify the relationship of the Limited Liability Company SIBUR TobolskThe subject of this audit is the fulfillment of the instructions of the state control and supervision authorities of the municipal control authorities
# 00160701192883
Unscheduled inspection
Start date: 2016-12-05, end date: 2016-12-16, duration: —
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Verification of compliance with paragraph 1 of Regulation No. 29062016 A572011300022016117119P of paragraph 12 of Regulation No. 21062016 573820P
# 00160700915983
Unscheduled inspection
Start date: 2016-09-20, end date: 2016-09-27, duration: —
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Verification of compliance with paragraphs 3 7 9 10 15 of the regulation dated 14082015 573867P
# 00160700053343
Unscheduled inspection
Start date: 2016-07-28, end date: 2016-08-24, duration: —
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: this inspection is carried out for the purpose of state construction supervision on the basis of the notice of completion of the capital construction facility dated 300-52016 1The objectives of this inspection are to verify the compliance of completed works with the requirements of technical regulations norms and rules of other regulatory legal acts of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used during the reconstruction of the facility capital construction "Reconstruction of the SHFLU processing complex of TobolsknEftekhim LLC stage 3 GF2"
# 00160601653527
Unscheduled inspection
Start date: 2016-05-23, end date: 2016-06-17, duration: —
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: verification of the compliance of the completed works with the requirements of technical regulations, norms and rules of other regulatory legal acts of the project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for the energy resources used during the reconstruction of the capital construction facility "Reconstruction of the SHFLU processing complex LLC TobolsknEftekhim TSB Severnaya stage 1 and 2 stage 2"
# 00150601416569
Unscheduled inspection
Start date: 2015-11-05, end date: 2015-11-30, duration: —
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Verification of compliance with paragraphs 1 2 4 5 16 of the regulation dated 14082015 573867P
# 722100376373
Unscheduled inspection
Start date: 2021-06-10, end date: —, duration: 20
Authority: Severo-Uralskoe upravlenie Federalnoi sluzhby po ekologicheskomu, tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: implementation of the inspection program approved by Order No. RP dated May 5, 2021-322-2676- oh, for the purpose of monitoring the compliance of completed works with the mandatory requirements of technical regulations, other regulatory legal acts, project documentation, requirements for energy conservation and energy efficiency improvement during the construction of a capital construction facility.
The objectives of this audit are: prevention, detection and suppression of violations of mandatory requirements of regulatory documents and legislative acts.
# 722100310291
Unscheduled inspection
Start date: 2021-06-24, end date: —, duration: 20
Authority: Glavnoe upravlenie MCHS Rossii po Tyumenskoi oblasti
Purpose of inspection: Control over the execution of Regulation No. 2 dated 03.11.2020 by a legal entity
SIBUR TOBOLSK LLC
# 002005241938
Unscheduled inspection
Start date: 2020-11-25, end date: 2020-12-15, duration: 15
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This inspection is carried out in order to implement the inspection program approved by Order No. 572759 dated April 22, 2019 in order to monitor the compliance of completed works with the mandatory requirements of technical regulations and other regulatory legal acts of project documentation with the requirements for energy conservation and energy efficiency improvement during the construction of a capital construction facility. The objectives of this inspection are to prevent identify and suppress violations of mandatory requirements of regulatory documents and legislative acts. The purpose of this check is to note the necessary compliance of the work performed and the building materials used during the construction of the reconstruction of the capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation, including the requirements for energy efficiency and the requirements for equipping the capital construction facility with metering devices for energy resources used, the availability of a construction permit, and compliance with the requirements set out in Parts 2 3 and 3_1 of Article 52 of this Code
# 722005189616
Unscheduled inspection
Start date: 2020-10-16, end date: —, duration: —
Authority: —
Purpose of inspection:
# 722005171463
Unscheduled inspection
Start date: 2020-10-08, end date: 2020-11-05, duration: 20
Authority: Upravlenie gosudarstvennogo stroitelnogo nadzora po Tyumenskoi oblasti Glavnogo upravleniya stroitelstva Tyumenskoi oblasti
Purpose of inspection: implementation of state construction supervision on the basis of the notice of completion of the capital construction facility dated 28092020 Prevention detection and suppression of violations of urban planning legislation committed by the developer, the customer, as well as by the person carrying out construction on the basis of a contract with the developer or the customer, including technical regulations and design documentation during the construction of the capital construction facility "Construction of the sludge treatment unit in the neutralization shop and industrial wastewater treatment of SIBUR Tobolsk LLC located at the address Russian Federation Tyumen region city district Tobolsk city Tobolsk territory Vostochny Industrial district block 1 house 11 building 50
# 722005162074
Unscheduled inspection
Start date: 2020-10-08, end date: —, duration: —
Authority: —
Purpose of inspection:
# 722004488706
Unscheduled inspection
Start date: 2020-08-18, end date: 2020-09-14, duration: 20
Authority: Gosudarstvennaya inspekciya truda v Tyumenskoi oblasti
Purpose of inspection: To establish that this check is being conducted in order to protect the rights and interests of the employee in connection with the consideration of the appeal from Vadim Viktorovich Veselov on violation of labor rights dated 10082020 727286320
# 722004473289
Unscheduled inspection
Start date: 2020-07-29, end date: 2020-08-05, duration: —
Authority: SeveroUralskoe mezhregionalnoe upravlenie Federalnoi sluzhby po nadzoru v sfere prirodopolzovaniya
Purpose of inspection: The inspection is carried out in order to monitor the execution by a legal entity of an order previously issued by the North Ural Interregional Directorate of Rosprirodnadzor on the elimination of violations of legislation in the field of environmental protection and violations of environmental requirements dated 04102019 11A25B with a deadline of 2004-2020.
# 002004340757
Unscheduled inspection
Start date: 2020-03-06, end date: 2020-04-03, duration: —
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: verification of the execution of regulation 575149P from 01112019
# 722004341026
Unscheduled inspection
Start date: 2020-03-11, end date: 2020-03-17, duration: —
Authority: Upravlenie gosudarstvennogo stroitelnogo nadzora po Tyumenskoi oblasti Glavnogo upravleniya stroitelstva Tyumenskoi oblasti
Purpose of inspection: Implementation of state construction supervision on the basis of the notice of the beginning of reconstruction of the capital construction facility dated 28022020 Prevention detection and suppression of violations of urban planning legislation committed by the developer, the customer, as well as by the person carrying out construction on the basis of a contract with the developer or the customer, including technical regulations and design documentation during the construction of the capital construction facility "Development of repair production of ETPP located at Russian Federation Tyumen region urban district Tobolsk city Tobolsk territory Vostochny industrial district block 1 house 4 building 1 Russian Federation Tyumen Region urban district Tobolsk city Tobolsk territory Vostochny Industrial district block 1 house 4 building 2
# 722004229415
Unscheduled inspection
Start date: 2020-01-28, end date: 2020-02-24, duration: —
Authority: Gosudarstvennaya inspekciya truda v Tyumenskoi oblasti
Purpose of inspection: protection of the rights and interests of an employee in connection with the consideration of the appeal of Andrey Vladimirovich Nikiforov 72711720OB dated 17012020 on violation of labor rights
# 001904053232
Unscheduled inspection
Start date: 2019-12-04, end date: 2019-12-18, duration: —
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This audit is conducted in order to verify the fulfillment by a legal entity, an individual entrepreneur, of the paragraphs of the regulation on the elimination of identified violations of mandatory requirements 570908019C dated September 3, 2019, previously issued by the state construction supervision authority, based on the notice on the elimination of violations 1 dated October 29, 2019. The objectives of this audit are to verify the elimination by a legal entity of the identified violation specified in paragraphs 570908019C dated September 3, 2019. September 2019, the purpose of this audit is to comply with the instructions of the state control and supervision authorities of the municipal control bodies
# 001904146644
Unscheduled inspection
Start date: 2019-12-23, end date: 2019-12-31, duration: —
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: The purpose is to comply with paragraphs 1 2 3 of the regulation dated June 28, 2019 574358P of the regulation dated August 16, 2019 575531P issued by the Severouralsky Administration of Rostechnadzor Tasks verification of the elimination of violations identified as part of an unscheduled on-site inspection conducted by the Severouralsky Administration of Rostechnadzor in relation to SIBUR Tobolsk LLC Subject to compliance with the regulations of the state control bodies of supervision of municipal control bodies
# 721904085157
Unscheduled inspection
Start date: 2019-12-11, end date: 2019-12-20, duration: —
Authority: Upravlenie gosudarstvennogo stroitelnogo nadzora po Tyumenskoi oblasti Glavnogo upravleniya stroitelstva Tyumenskoi oblasti
Purpose of inspection: implementation of state construction supervision on the basis of the notice of completion of construction dated 29112019 Prevention detection and suppression of violations of urban planning legislation committed by the developer, the customer, as well as by the person carrying out construction on the basis of a contract with the developer or the customer, including technical regulations and design documentation during the construction of the capital construction facility "Reconstruction of the ABK2 building of SIBUR Tobolsk LLC" for technical The Industrial Zone Training Center Tobolsk, Tyumen Region, located at the following address: Russian Federation, Tyumen region, Tobolsk, Vostochny Industrial District, block 1, building 6, building 1
# 721903992951
Unscheduled inspection
Start date: 2019-11-19, end date: 2019-12-16, duration: —
Authority: Gosudarstvennaya inspekciya truda v Tyumenskoi oblasti
Purpose of inspection: protection of labor rights
# 001903881151
Unscheduled inspection
Start date: 2019-10-22, end date: 2019-11-12, duration: —
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This audit is conducted in order to monitor the fulfillment by a legal entity, an individual entrepreneur, of the paragraphs of the regulation on the elimination of identified violations of mandatory requirements 570900319C dated March 1, 2019, previously issued by the state construction supervision authority. The objectives of this audit are to verify that the legal entity eliminates the violations identified in paragraphs 570900319C dated March 1, 2019.
# 001903917647
Unscheduled inspection
Start date: 2019-10-30, end date: 2019-12-11, duration: —
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Purpose verification of compliance with regulations dated September 28, 2018 577990P dated November 30, 2018 A572011300032018004P02 dated March 4, 2019 A572011300012019001P02 paragraphs 1 2 4 5 6 7 regulations dated March 4, 2019 A572011300012019001P01 issued by the Severouralsky Administration of Rostechnadzor Tasks verification of the elimination of violations identified as part of the verification of compliance with regulations of state control bodies supervision municipal control bodies permanent state supervision conducted By the North Ural Administration of Rostechnadzor in relation to SIBUR Tobolsk LLCThe subject is the fulfillment of the instructions of the state control bodies supervision of municipal control bodies
# 721903907926
Unscheduled inspection
Start date: 2019-10-31, end date: —, duration: —
Authority: —
Purpose of inspection:
# 001903021506
Unscheduled inspection
Start date: 2019-09-16, end date: 2019-09-24, duration: —
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This audit is conducted in order to monitor the fulfillment by a legal entity, an individual entrepreneur, of the paragraphs of the regulation on the elimination of identified violations of mandatory requirements 570900119C dated January 18, 2019, previously issued by the state construction supervision authority. The objectives of this audit are to verify that the legal entity eliminates the violations identified in the paragraphs of regulation 570900119C dated January 18, 2019.
# 001903021489
Unscheduled inspection
Start date: 2019-09-17, end date: 2019-09-25, duration: —
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This inspection is carried out in order to verify the completed construction of a capital construction facility on the basis of the completion notice 003PHU dated August 16, 2019 in order to monitor the compliance of completed works with the mandatory requirements of technical regulations and other regulatory legal acts of project documentation with the requirements for energy conservation and energy efficiency improvement during the construction of a capital construction facility. The objectives of this inspection are to prevent identify and suppress violations of mandatory The subject of this audit is the compliance of the work performed and the building materials used during the construction reconstruction of the capital construction facility as well as the results of such work with the requirements of the technical regulations of the project documentation, including the requirements for energy efficiency and the requirements for equipping the capital construction facility with metering devices for energy resources used, the availability of a construction permit, and compliance with the requirements set out in Parts 2 3 and 3_1 of Article 52 of this Code
# 721903773828
Unscheduled inspection
Start date: 2019-09-26, end date: —, duration: —
Authority: —
Purpose of inspection:
# 001902956466
Unscheduled inspection
Start date: 2019-08-12, end date: 2019-08-16, duration: —
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: The purpose is to verify the implementation of paragraph 14 of regulation No. 574358P dated June 28, 2019 issued by the Severouralsky Rostechnadzor managementThe task is to verify the elimination of violations identified as part of an unscheduled on-site inspection conducted by the Severouralsky Rostechnadzor Management in relation to SIBUR Tobolsk LLCThe subject is the fulfillment of the instructions of the state control bodies supervision of municipal control bodies
# 721902924229
Unscheduled inspection
Start date: 2019-08-05, end date: 2019-08-30, duration: —
Authority: Glavnoe upravlenie MCHS Rossii po Tyumenskoi oblasti
Purpose of inspection: Control over the implementation of Regulation 3ot 04122019 on the elimination of violations of established requirements and measures in the field of civil defense
# 001902926077
Unscheduled inspection
Start date: 2019-08-07, end date: 2019-09-03, duration: —
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This audit is conducted in order to implement the audit program approved by 572759 dated April 22, 2019 in order to monitor the compliance of completed works with the mandatory requirements of technical regulations and other regulatory legal acts of project documentation with the requirements for energy conservation and energy efficiency improvement during the construction of a capital construction facility. The objectives of this audit are to prevent identify and suppress violations of mandatory requirements of regulatory documents and legislative acts. The purpose of the inspection is to note the necessary compliance of the work performed and the building materials used during the construction of the reconstruction of the capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation, including the requirements for energy efficiency and the requirements for equipping the capital construction facility with metering devices for energy resources used, the availability of a construction permit, and compliance with the requirements established by Parts 2 3 and 3_1 of Article 52 of this Code. The Code
# 721902932537
Unscheduled inspection
Start date: 2019-07-30, end date: 2019-08-26, duration: —
Authority: Upravlenie gosudarstvennogo stroitelnogo nadzora po Tyumenskoi oblasti Glavnogo upravleniya stroitelstva Tyumenskoi oblasti
Purpose of inspection: implementation of state construction supervision on the basis of the program of inspections for the capital construction facility from 06022019 Prevention detection and suppression of violations of the legislation on urban development, including technical regulations and design documentation during the construction of the capital construction facility "Reconstruction of the building ABK2 LLC SIBUR Tobolsk" committed by the developer, the customer and the person carrying out construction on the basis of an agreement with the developer or the customer" for the technical training center of the Industrial zone Tobolsk Tyumen region" located at the address Russian Federation Tyumen region city of Tobolsk territory Vostochny industrial district block 1 house 6 building 1
# 721902875100
Unscheduled inspection
Start date: 2019-07-15, end date: —, duration: —
Authority: —
Purpose of inspection:
# 001902833335
Unscheduled inspection
Start date: 2019-07-02, end date: 2019-07-29, duration: —
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This inspection is carried out in order to verify the completed construction of a capital construction facility on the basis of the completion notice 003OCT dated June 13, 2019 in order to monitor the compliance of completed works with the mandatory requirements of technical regulations and other regulatory legal acts of project documentation with the requirements for energy conservation and energy efficiency improvement during the construction of a capital construction facility. The objectives of this inspection are to prevent identify and suppress violations of mandatory The subject of this audit is the compliance of the work performed and the building materials used during the construction reconstruction of the capital construction facility as well as the results of such work with the requirements of the technical regulations of the project documentation, including the requirements for energy efficiency and the requirements for equipping the capital construction facility with metering devices for energy resources used, the availability of a construction permit, and compliance with the requirements set out in Parts 2 3 and 3_1 of Article 52 of this Code
# 721902953350
Unscheduled inspection
Start date: 2019-07-29, end date: —, duration: —
Authority: —
Purpose of inspection:
# 001902819470
Unscheduled inspection
Start date: 2019-06-24, end date: 2019-06-28, duration: —
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: The purpose is to verify the implementation of paragraph 3 of the regulation dated March 4, 2019 A572011300012019001P01 regulations dated March 4, 2019 A572011300012019001P03 regulations dated August 10, 2018 576664P paragraphs 2 3 4 5 regulations dated June 26, 2018 572641P paragraphs 2 3 4 5 94 113 114 115 116 117 119 123 127 Regulations of June 26, 2018 572643P regulations dated April 23, 2019, 572348P issued by the North Ural Department of Rostechnadzor Tasks to verify the elimination of violations identified as part of planned unscheduled on-site and documentary inspections of the implementation of measures under permanent state supervision conducted by the North Ural Department of Rostechnadzor in relation to SIBUR Tobolsk LLCThe subject is the fulfillment of the instructions of the state control bodies supervision of municipal control bodies
# 721902609176
Unscheduled inspection
Start date: 2019-04-01, end date: 2019-04-29, duration: —
Authority: Upravlenie gosudarstvennogo stroitelnogo nadzora po Tyumenskoi oblasti Glavnogo upravleniya stroitelstva Tyumenskoi oblasti
Purpose of inspection: implementation of state construction supervision on the basis of the program of inspections of the capital construction facility from 18022019 Prevention detection and suppression of violations of legislation on urban development, including technical regulations and design documentation during the construction of the capital construction facility "Construction of the sludge treatment unit in the neutralization shop" committed by the developer, the customer, as well as the person carrying out construction on the basis of a contract with the developer or the customer and industrial wastewater treatment of SIBUR Tobolsk LLC located at the address Russian Federation Tyumen region city district Tobolsk city Tobolsk territory Vostochny Industrial district block 1 house 11 building 50
# 001902646616
Unscheduled inspection
Start date: 2019-04-09, end date: 2019-04-23, duration: —
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Purpose verification of compliance verification of compliance with the regulations dated November 30, 2018 A572011300032018004P01 regulations dated November 30, 2018 A572011300032018004P03 regulations dated November 30, 2018 A572011300032018004P04 issued by the North Ural Rostechnadzor Department Tasks verification of the elimination of violations identified as part of planned and unscheduled field inspections of regulations conducted by the North Ural Rostechnadzor Department in relation to SIBUR Tobolsk LLC Subject to compliance with the regulations of state control bodies supervision of municipal control bodies
# 001902586807
Unscheduled inspection
Start date: 2019-03-20, end date: 2019-04-16, duration: —
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This inspection is carried out in order to verify the completed construction of a capital construction facility on the basis of the completion notice 002OCT dated March 15, 2019 in order to monitor the compliance of completed works with the mandatory requirements of technical regulations and other regulatory legal acts of project documentation with the requirements for energy conservation and energy efficiency improvement during the construction of a capital construction facility. The objectives of this inspection are to prevent identify and suppress violations of mandatory requirements of regulatory documents and legislative acts The subject of this audit is the compliance of the work performed and the building materials used during the construction reconstruction of the capital construction facility as well as the results of such work with the requirements of the technical regulations of the project documentation, including the requirements for energy efficiency and the requirements for equipping the capital construction facility with metering devices for energy resources used, the availability of a construction permit, and compliance with the requirements set out in Parts 2 3 and 3_1 of Article 52 of this Code
# 721902546104
Unscheduled inspection
Start date: 2019-03-04, end date: —, duration: —
Authority: —
Purpose of inspection:
# 721902497982
Unscheduled inspection
Start date: 2019-02-12, end date: 2019-02-25, duration: —
Authority: Upravlenie gosudarstvennogo stroitelnogo nadzora po Tyumenskoi oblasti Glavnogo upravleniya stroitelstva Tyumenskoi oblasti
Purpose of inspection: Implementation of state construction supervision on the basis of the notice of the beginning of construction of the reconstruction of the capital construction facility dated January 29, 2019 1 prevention detection and suppression of violations of the legislation on urban development, including technical regulations and design documentation during the construction of the capital construction facility "Reconstruction of the building ABK2 LLC" committed by the developer, the customer, as well as by the person carrying out construction on the basis of a contract with the developer or the customerSIBUR Tobolsk" for the technical training center of the Tobolsk Industrial Zone, Tyumen Region, located at the address Russian Federation Tyumen region, Tobolsk city, Vostochny Industrial District, block 1, building 6, building 1conformity of the information contained in the notification of the commencement of certain types of business activities with mandatory requirements
# 721902515539
Unscheduled inspection
Start date: 2019-02-18, end date: 2019-03-18, duration: —
Authority: Upravlenie gosudarstvennogo stroitelnogo nadzora po Tyumenskoi oblasti Glavnogo upravleniya stroitelstva Tyumenskoi oblasti
Purpose of inspection: implementation of state construction supervision based on the program of inspections of the capital construction facility dated 01112018 Prevention detection and suppression of violations of urban planning legislation committed by the developer, the customer, as well as by the person carrying out construction on the basis of a contract with the developer or the customer, including technical regulations and design documentation during the construction of the capital construction facility "Construction of the cooling tower section B214 in the CFU workshop" located at the address Russian Federation Tyumen region, Tobolsk city, Vostochny Industrial District, block 5, building 45
# 721902526751
Unscheduled inspection
Start date: 2019-02-22, end date: 2019-03-15, duration: —
Authority: Upravlenie gosudarstvennogo stroitelnogo nadzora po Tyumenskoi oblasti Glavnogo upravleniya stroitelstva Tyumenskoi oblasti
Purpose of inspection: Implementation of state construction supervision on the basis of the notice of the beginning of construction of the reconstruction of the capital construction facility dated January 29, 2019 1 prevention detection and suppression of violations of urban planning legislation committed by the developer, the customer, as well as by the person carrying out construction on the basis of a contract with the developer or the customer, including technical regulations and design documentation during the construction of the capital construction facility "Construction of a sediment treatment unit in the workshop for the neutralization and treatment of industrial wastewater of SIBUR Tobolsk LLC located at the address Russian Federation Tyumen region, Tobolsk city district, Tobolsk territory, Vostochny Industrial District, block 1, building 11, building 50 compliance of the information contained in the notification of the commencement of certain types of business activities with mandatory requirements
# 001902471999
Unscheduled inspection
Start date: 2019-02-04, end date: 2019-03-01, duration: —
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This inspection is carried out in order to verify the completed construction of a capital construction facility on the basis of the completion notice 1 dated January 12, 2019, in order to monitor the compliance of completed works with the mandatory requirements of technical regulations and other regulatory legal acts of project documentation with the requirements for energy conservation and energy efficiency improvement during the construction of a capital construction facility. The objectives of this inspection are to prevent identify and suppress violations of mandatory The subject of this audit is the compliance of the work performed and the building materials used during the construction reconstruction of the capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation, including the requirements for energy efficiency and the requirements for equipping the capital construction facility with metering devices for energy resources used, the availability of a construction permit, and compliance with the requirements set out in Parts 2 3 and 3_1 of Article 52 of this Code
# 001902432269
Unscheduled inspection
Start date: 2019-01-14, end date: 2019-02-08, duration: —
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: In order to verify the fulfillment of the order dated September 8, 2017 578060P2 issued by the North Ural Rostechnadzor Department, the objectives of this audit are to prevent identify and suppress violations of mandatory requirements of regulatory documents and legislative acts in the field of safety of hydraulic structures and to take measures to eliminate violations of mandatory requirements if they are identified and to bring to justice persons who have committed violations of the requirements of federal laws and regulations. other regulatory legal acts
# 001802304190
Unscheduled inspection
Start date: 2018-12-14, end date: 2019-01-18, duration: —
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This inspection is carried out in order to verify the completed construction of a capital construction facility on the basis of completion notice 19802 dated November 30, 2018 in order to monitor the compliance of completed works with the mandatory requirements of technical regulations and other regulatory legal acts of project documentation with the requirements for energy conservation and energy efficiency improvement during the construction of a capital construction facility. The objectives of this inspection are to prevent identify and suppress violations of mandatory The subject of this audit is the compliance of the work performed and the building materials used during the construction reconstruction of the capital construction facility as well as the results of such work with the requirements of the technical regulations of the project documentation, including the requirements for energy efficiency and the requirements for equipping the capital construction facility with metering devices for energy resources used, the availability of a construction permit, and compliance with the requirements set out in Parts 2 3 and 3_1 of Article 52 of this Code
# 721802179334
Unscheduled inspection
Start date: 2018-11-27, end date: 2018-12-24, duration: —
Authority: Upravlenie gosudarstvennogo stroitelnogo nadzora po Tyumenskoi oblasti Glavnogo upravleniya stroitelstva Tyumenskoi oblasti
Purpose of inspection: Implementation of state construction supervision based on the program of inspections of the capital construction facility dated 16082018 Prevention detection and suppression of violations of urban planning legislation committed by the developer, the customer, as well as by the person carrying out construction on the basis of a contract with the developer or the customer, including technical regulations and design documentation during the construction of the capital construction facility "West Siberian Complex of Deep Processing of Hydrocarbon raw Materials in polyolefins with a capacity of 20 million tons per year with corresponding facilities of the OPCW general factory Packaging and packaging production in Tobolsk Infrastructure" located at the address Russian Federation Tyumen region city of Tobolsk territory Vostochny industrial district block 8 house 2 building 1 Russian Federation Tyumen region city of Tobolsk territory Vostochny Industrial district block 8 house 2 building 2
# 001802083522
Unscheduled inspection
Start date: 2018-11-12, end date: 2018-12-07, duration: —
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This audit is conducted in order to monitor the fulfillment by a legal entity, an individual entrepreneur, of the paragraphs of the order previously issued by the state construction supervision authority on the elimination of identified violations of mandatory requirements 5709105117C dated October 23, 2017. The objectives of this audit are to verify that the legal entity eliminates the identified violation specified in paragraphs 5709105117C dated October 23, 2017. The subject of this audit is the fulfillment of the instructions of state control bodies supervision of municipal control bodies
# 721802019493
Unscheduled inspection
Start date: 2018-10-05, end date: 2018-11-01, duration: —
Authority: Upravlenie gosudarstvennogo stroitelnogo nadzora po Tyumenskoi oblasti Glavnogo upravleniya stroitelstva Tyumenskoi oblasti
Purpose of inspection: Implementation of state construction supervision based on the program of inspections of the capital construction facility from 15082018 Prevention detection and suppression of violations of urban planning legislation committed by the developer, the customer, as well as by the person carrying out construction on the basis of a contract with the developer or the customer, including technical regulations and design documentation during the construction of the capital construction facility "Construction of the cooling tower section B214 in the CFU workshop" located at the address Russian Federation Tyumen region, Tobolsk city, Vostochny Industrial District, block 5, building 45
# 721802045205
Unscheduled inspection
Start date: 2018-10-30, end date: 2018-11-02, duration: —
Authority: SeveroUralskoe mezhregionalnoe upravlenie Federalnoi sluzhby po nadzoru v sfere prirodopolzovaniya
Purpose of inspection: the inspection is carried out in order to comply with the regulations on the elimination of violations of legislation in the field of environmental protection and violations of environmental protection requirements from 13072018 11 O with a deadline until 24102018
# 721802098965
Unscheduled inspection
Start date: 2018-10-18, end date: —, duration: —
Authority: —
Purpose of inspection:
# 001801596131
Unscheduled inspection
Start date: 2018-09-19, end date: 2018-09-28, duration: —
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: The purpose is to verify compliance with the regulations of the North Ural Rostechnadzor Department dated December 15, 2018 5712772P points 1 6 regulations of the North Ural Rostechnadzor Department dated June 26, 2018 572641P points 1 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80 81 82 83 84 85 86 87 88 89 90 91 92 93 95 96 97 98 99 100 101 102 103 104 105 106 107 108 109 110 111 112 118 120 121 122 124 125 126 128 129 regulations of the North Ural Department of Rostechnadzor dated June 26, 2018 572643P Tasks verification of the elimination of violations identified as part of unscheduled field inspections regulations conducted by the North Ural Department of Rostechnadzor in relation to SIBUR Tobolsk LLC Subject to compliance with the regulations of state bodies control supervision of municipal control bodies
# 721800631208
Unscheduled inspection
Start date: 2018-08-13, end date: —, duration: —
Authority: Upravlenie gosudarstvennogo stroitelnogo nadzora po Tyumenskoi oblasti Glavnogo upravleniya stroitelstva Tyumenskoi oblasti
Purpose of inspection:
# 721800663661
Unscheduled inspection
Start date: 2018-08-20, end date: 2018-08-31, duration: —
Authority: Upravlenie gosudarstvennogo stroitelnogo nadzora po Tyumenskoi oblasti Glavnogo upravleniya stroitelstva Tyumenskoi oblasti
Purpose of inspection: Implementation of state construction supervision on the basis of notification dated 09082018 1943603 on the completion dates of works subject to inspection during the construction reconstruction of a capital construction facility Prevention detection and suppression of violations of legislation on urban development, including technical regulations and design documentation during the construction of a capital construction facility, committed by the developer, the customer, as well as by the person carrying out construction on the basis of a contract with the developer or the customer "Construction of the cooling tower section B214 in the CFGU workshop located at the following address: Russian Federation Tyumen region, Tobolsk, Vostochny Industrial District, block 5, building 45
# 721800675297
Unscheduled inspection
Start date: 2018-08-21, end date: 2018-09-03, duration: —
Authority: Upravlenie gosudarstvennogo stroitelnogo nadzora po Tyumenskoi oblasti Glavnogo upravleniya stroitelstva Tyumenskoi oblasti
Purpose of inspection: Implementation of state construction supervision on the basis of notification dated 07082018 8451 on the start of construction of a capital construction facility Prevention detection and suppression of violations of urban planning legislation committed by the developer, the customer, as well as by the person carrying out construction on the basis of a contract with the developer or the customer, including technical regulations and design documentation during the construction of the capital construction facility "West Siberian Complex for Deep Processing of Hydrocarbons UVS raw materials into polyolefins with a capacity of 20 million tons per year with corresponding facilities of the OPCW general factory Packaging and packaging production in Tobolsk Infrastructure" located at the address Russian Federation Tyumen region city of Tobolsk territory Vostochny Industrial district block 8 house 2 building 1 Russian Federation Tyumen region city of Tobolsk territory Vostochny Industrial district block 8 house 2 building 2
# 001800597306
Unscheduled inspection
Start date: 2018-07-30, end date: 2018-08-10, duration: —
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: The purpose of checking the fulfillment of the points 1 2 3 4 5 6 7 8 9 10 regulations from 26062017 575588P paragraphs 2 3 7 9 12 20 21 regulations from 05072017 A572011300022017004014P01 paragraphs 4 5 regulations from 30032018 A572011300222018001P01 paragraph 1 regulations from 30032018 A572011300222018001P02 issued by the North Ural Rostechnadzor Department Tasks verification of elimination of violations identified as part of the verification of compliance with regulations for the implementation of permanent state supervision carried out by the Severouralsk Rostechnadzor Department in relation to SIBUR Tobolsk LLC is subject to compliance with the instructions of state control bodies and municipal control bodies
# 721800544784
Unscheduled inspection
Start date: 2018-07-09, end date: —, duration: —
Authority: —
Purpose of inspection:
# 001800533441
Unscheduled inspection
Start date: 2018-07-09, end date: 2018-08-03, duration: —
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This audit is conducted in order to implement the audit program approved by 5785 dated January 12, 2018 in order to monitor the compliance of completed works with the mandatory requirements of technical regulations and other regulatory legal acts of project documentation with the requirements for energy conservation and energy efficiency improvement during the construction of a capital construction facility. The objectives of this audit are to prevent identify and suppress violations of mandatory requirements of regulatory documents and legislative acts The subject of this audit is to note the necessary compliance of the work performed and the building materials used during the construction of the reconstruction of the capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation, including the requirements for energy efficiency and the requirements for equipping the capital construction facility with metering devices for energy resources used, the availability of a construction permit, and compliance with the requirements set out in Parts 2 3 and 3_1 of the article 52 of this Code
# 721800468086
Unscheduled inspection
Start date: 2018-06-18, end date: 2018-07-06, duration: —
Authority: Upravlenie gosudarstvennogo stroitelnogo nadzora po Tyumenskoi oblasti Glavnogo upravleniya stroitelstva Tyumenskoi oblasti
Purpose of inspection: Implementation of state construction supervision based on the program of inspections of the capital construction facility from 04062018 Prevention detection and suppression of violations of urban planning legislation committed by the developer, the customer, as well as by the person carrying out construction on the basis of a contract with the developer or the customer, including technical regulations and design documentation during the construction of the capital construction facility "Construction of the cooling tower section B214 in the CFU workshop" located at the address Russian Federation Tyumen region, Tobolsk city, Vostochny Industrial District, block 5, building 45
# 721800429492
Unscheduled inspection
Start date: 2018-06-04, end date: 2018-07-02, duration: —
Authority: Upravlenie gosudarstvennogo stroitelnogo nadzora po Tyumenskoi oblasti Glavnogo upravleniya stroitelstva Tyumenskoi oblasti
Purpose of inspection: Verification of the elimination of violations under the order of 13042018 356ptb during the construction of the reconstruction of the capital construction facility Prevention detection and suppression of violations of urban planning legislation committed by the developer, the customer, as well as by the person carrying out construction on the basis of a contract with the developer or the customer, including technical regulations and design documentation during the construction of the capital construction facility Reconstruction of the industrial wastewater treatment plant LLC SIBUR Tobolsk located at the address Russian Federation Tyumen region city of Tobolsk territory Vostochny industrial district block 1 building 1124 1116 1131 1126 1132 1117 1125 1120 1122 1146 building 1123 1127 1128 1118 1119 1121 1129 1130 1133 1134 1135 1136 1137 1138 1139 1140 1141 1142 1143 1144 1145
# 001800354116
Unscheduled inspection
Start date: 2018-05-14, end date: 2018-05-25, duration: —
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: The purpose is to verify the implementation of paragraphs 1 2 3 of the regulation dated 30032018 A582011300222018002P01 issued by the Severouralsky Rostechnadzor Department Tasks are to verify the elimination of violations identified as part of the audit of the implementation of permanent state supervision conducted by the Severouralsky Rostechnadzor Department in relation to SIBUR Tobolsk LLC Subject to compliance with the regulations of the state control bodies of supervision of municipal control bodies
# 721800277976
Unscheduled inspection
Start date: 2018-04-02, end date: 2018-04-20, duration: —
Authority: Upravlenie gosudarstvennogo stroitelnogo nadzora po Tyumenskoi oblasti Glavnogo upravleniya stroitelstva Tyumenskoi oblasti
Purpose of inspection: Implementation of state construction supervision based on the program of inspections for the capital construction project dated 01032018 Prevention detection and suppression of violations of urban planning legislation committed by the developer, the customer, as well as by the person carrying out construction on the basis of a contract with the developer or the customer, including technical regulations and design documentation during the construction of the capital construction facility "Construction of the cooling tower section B214 in the CFU workshop" located at the address Russian Federation Tyumen region, Tobolsk city, Vostochny Industrial District, block 5, building 45
# 721800254307
Unscheduled inspection
Start date: 2018-03-19, end date: —, duration: —
Authority: —
Purpose of inspection:
# 721800169424
Unscheduled inspection
Start date: 2018-03-19, end date: —, duration: —
Authority: —
Purpose of inspection:
# 721800253184
Unscheduled inspection
Start date: 2018-03-12, end date: —, duration: —
Authority: Upravlenie gosudarstvennogo stroitelnogo nadzora po Tyumenskoi oblasti Glavnogo upravleniya stroitelstva Tyumenskoi oblasti
Purpose of inspection:
# 721800253135
Unscheduled inspection
Start date: 2018-03-12, end date: —, duration: —
Authority: —
Purpose of inspection:
# 721800073265
Unscheduled inspection
Start date: 2018-02-12, end date: 2018-02-16, duration: —
Authority: SeveroUralskoe mezhregionalnoe upravlenie Federalnoi sluzhby po nadzoru v sfere prirodopolzovaniya
Purpose of inspection: review of information
# 721800191844
Unscheduled inspection
Start date: 2018-01-30, end date: 2018-02-12, duration: —
Authority: Upravlenie gosudarstvennogo stroitelnogo nadzora po Tyumenskoi oblasti Glavnogo upravleniya stroitelstva Tyumenskoi oblasti
Purpose of inspection: Implementation of state construction supervision on the basis of the notification dated 22.012018 19751 on the start of construction of the reconstruction of the capital construction facility Prevention detection and suppression of violations of the legislation on urban development, including technical regulations and design documentation during the construction of the capital construction facility Reconstruction of the neutralization and purification shop of industrial SIBUR Tobolsk LLC located at the address Russian Federation Tyumen region Tobolsk territory Vostochny industrial district block 1 building 1124 1116 1131 1126 1132 1117 1125 1120 1122 1146 building 1123 1127 1128 1118 1119 1121 1129 1130 1133 1134 1135 1136 1137 1138 1139 1140 1141 1142 1143 1144 1145
# 00170802913589
Unscheduled inspection
Start date: 2017-12-07, end date: 2017-12-22, duration: —
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: To establish that this audit is being conducted in order to verify the implementation of paragraphs 910 20 29 of Regulation No. 578060P1 of September 8, 2017 issued by the Severouralsky Administration of Rostechnadzor. The objectives of this audit are to verify the elimination of violations identified by the Severouralsky Administration of Rostechnadzor during the audit of the Limited Liability Company SIBUR TobolskThe subject of this audit is the fulfillment of the instructions of the state control bodies of supervision of municipal control bodies
# 00170803019584
Unscheduled inspection
Start date: 2017-11-22, end date: 2017-12-15, duration: —
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: The purpose is to verify compliance with the regulation of 21062016 573761P items 3 4 5 6 7 10 11 regulations of 21062016 573820P items 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 21 22 23 24 25 26 48 49 50 51 52 56 57 59 67 Regulations from 27022017 A572011300012017001P01 points 13 14 15 19 regulations from 27022017 A572011300012017002P01 items 11 12 13 14 15 16 17 18 regulations from 26062017 575588P items 1 4 5 6 8 10 11 13 14 15 16 17 18 19 22 23 24 regulations from 05072017 A572011300022017004014P01 issued by the Severouralsky Administration of Rostechnadzor Tasks verification of the elimination of violations compliance with industrial safety requirements during the elimination of violations identified by the Severouralsky Administration Rostechnadzor during the audit in relation to SIBUR Tobolsk LLCThe subject is the fulfillment of the instructions of the state control bodies supervision of municipal control bodies
# 72170802830881
Unscheduled inspection
Start date: 2017-11-13, end date: —, duration: —
Authority: —
Purpose of inspection:
# 00170802630431
Unscheduled inspection
Start date: 2017-10-09, end date: 2017-11-20, duration: —
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: In order to verify the fulfillment of paragraphs 2 and 6 of the regulation dated 08092017 578060P21 issued by the Severouralsky Administration of Rostechnadzor, the tasks of this audit are to verify the elimination of violations of mandatory requirements identified by the Severouralsky Administration of the Federal Environmental Technological and Nuclear Supervision Service during an audit of the LIMITED LIABILITY COMPANY SIBUR TOBOLSK. The subject of this audit is the fulfillment of the instructions of the state control and supervision authorities of municipal control
# 00170802733448
Unscheduled inspection
Start date: 2017-10-05, end date: 2017-10-25, duration: —
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: To establish that this audit is being conducted in order to verify the implementation of paragraphs 18 1119 2128 3065 of the letter dated September 08, 2017 578060P1 issued by the Northern Ural Directorate of Rostechnadzor. The objectives of this audit are to verify the elimination of violations identified by the Northern Ural Directorate of Rostechnadzor and to verify the relationship of the Limited Liability Company SIBUR TobolskThe subject of this audit is the fulfillment of the instructions of the state control and supervision authorities of the municipal control authorities
# 00170802413261
Unscheduled inspection
Start date: 2017-09-26, end date: 2017-10-23, duration: —
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This inspection is carried out in order to implement the inspection program 576798 dated 28062017 for the Reservoir P49 facility at the non-recyclable waste disposal site P10 Workshop of NOPSV LLC TobolsknEftekhim. The objectives of this inspection are to prevent, identify and suppress violations of mandatory requirements of regulatory documents and legislative acts. The purpose of this inspection is to note the necessary compliance of the work and the construction materials used in the construction process, reconstruction of the capital construction facility, as well as the results of such work, the requirements of the technical regulations of the project documentation, including the requirements for energy efficiency and the requirements for equipping the capital construction facility with metering devices for used energy resources, the availability of a construction permit, and compliance with the requirements established by Parts 2 3 and 3_1 of Article 52 of this Code
# 00170701854813
Unscheduled inspection
Start date: 2017-08-14, end date: 2017-09-08, duration: —
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: this inspection is carried out in order to verify the progress of preparation of electric and heat supply organizations for work in the autumn-winter period 2017-2018 Order of the Federal Service for Environmental Technological and Nuclear Supervision dated 10072017 256 the objectives of this inspection are to prevent identify and suppress violations of mandatory requirements of regulatory documents and legislative acts The subject of this inspection is to ensure compliance with mandatory requirements or requirements established by legal acts
# 00170701705167
Unscheduled inspection
Start date: 2017-06-05, end date: 2017-06-26, duration: —
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Goals checking the fulfillment of points 6 8 11 12 13 14 17 18 19 20 21 Regulations from 14082015 573867P points 20 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 54 46 47 53 54 55 58 60 61 62 63 64 65 66 68 69 70 71 72 73 74 75 76 77 78 79 80 81 Regulations from 27022017 A572011300012017001P01 points 3 4 5 6 7 8 910 11 12 16 17 18 20 Regulations from 27022017 A572011300012017002P01 issued by the North Ural Department of Rostechnadzor Tasks verification of the elimination of violations compliance with industrial safety requirements during the elimination of violations Subject to compliance with the regulations of state control bodies supervision of municipal control bodies
# 72170701534571
Unscheduled inspection
Start date: 2017-04-13, end date: 2017-04-25, duration: —
Authority: SeveroUralskoe mezhregionalnoe upravlenie Federalnoi sluzhby po nadzoru v sfere prirodopolzovaniya
Purpose of inspection: The purpose is to conduct an audit on the basis of appeals and statements received by Rosprirodnadzor from citizens, including legal entities, information from state authorities, local self-government bodies from the mass media, tasks to prevent identify and suppress violations by legal entities, their managers and other officials of mandatory requirements in the field of environmental protection, Subject to compliance by legal entities with mandatory requirements in the field of environmental protection
# 00170701585664
Unscheduled inspection
Start date: 2017-04-26, end date: 2017-04-28, duration: —
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Objectives verification of the implementation of paragraphs 1 to 2 of the regulation dated 27022017 A572011300012017002P1 issued by the North Ural Department of Rostechnadzor Tasks verification of the elimination of violations compliance with industrial safety requirements during the elimination of violations Subject to compliance with the regulations of state control bodies supervision of municipal control bodies
# 72170701356747
Unscheduled inspection
Start date: 2017-02-02, end date: —, duration: —
Authority: —
Purpose of inspection:
# 72170701309261
Unscheduled inspection
Start date: 2017-01-19, end date: 2017-01-24, duration: —
Authority: SeveroUralskoe mezhregionalnoe upravlenie Federalnoi sluzhby po nadzoru v sfere prirodopolzovaniya
Purpose of inspection: The purpose is to conduct an audit on the basis of appeals and statements received by Rosprirodnadzor from citizens, including legal entities, information from state authorities, local self-government bodies from the mass media, tasks to prevent identify and suppress violations by legal entities, their managers and other officials of mandatory requirements in the field of environmental protection, Subject to compliance by legal entities with mandatory requirements in the field of environmental protection
# 00160701192883
Unscheduled inspection
Start date: 2016-12-05, end date: 2016-12-16, duration: —
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Verification of compliance with paragraph 1 of Regulation No. 29062016 A572011300022016117119P of paragraph 12 of Regulation No. 21062016 573820P
# 72160701074070
Unscheduled inspection
Start date: 2016-11-07, end date: 2016-11-18, duration: —
Authority: Upravlenie gosudarstvennogo stroitelnogo nadzora po Tyumenskoi oblasti Glavnogo upravleniya stroitelstva Tyumenskoi oblasti
Purpose of inspection: Verification of the elimination of violations in accordance with the order of 16092016 7816TB Verification of the compliance of work with the requirements of technical regulations and other regulatory legal acts of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used during the construction of the capital construction facility West Siberian Complex for deep processing of hydrocarbons UVS polyolefins with a capacity of 20 million per year with the corresponding facilities of the general factory OPC Facilities of TobolsknEftekhim LLC and Tobolskpolymer LLC Reconstruction of the PTOL building at Denisovka station with the installation of a viewing platform located at the address Tyumen region city of Tobolsk Vostochny Industrial district block 7 24 building 19
# 00160701187465
Unscheduled inspection
Start date: 2016-11-21, end date: 2016-11-25, duration: —
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Verification of compliance with paragraphs 1 2 8 9 13 14 15 of Regulation No. 21062016 573820P of regulation No. 29062016 A572011300032016120P of Regulation No. 29062016 A572011300012016119P of paragraph 2 of Regulation No. 29062016 A572011300022016117119P
# 00160700915983
Unscheduled inspection
Start date: 2016-09-20, end date: 2016-09-27, duration: —
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Verification of compliance with paragraphs 3 7 9 10 15 of the regulation dated 14082015 573867P
# 72160700046705
Unscheduled inspection
Start date: 2016-08-22, end date: —, duration: —
Authority: —
Purpose of inspection: