Found 5 inspections:

# 662004323457
Unscheduled inspection
Start date: 2020-03-04, end date: —, duration:
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection:


# 661902510005
Unscheduled inspection
Start date: 2019-02-18, end date: 2019-03-15, duration:
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: The purpose is to implement the inspection program 29170113318 dated April 23, 2018. The task is to carry out regional state construction supervision. The subject is to verify the compliance of the work and applicable building materials during the construction of the capital construction facility "Stage 1 of the construction of a warehouse of light petroleum products with filling ramps, a platform for draining railway tanks 2 on ROM, a platform for draining automobile tanks 3 on ROM, a platform for filling automobile tanks 7 according to ROM, a product pumping station 8 according to ROM, a stormwater storage tank 9 according to ROM, local rainwater treatment plants 10 according to ROM, an underground double-walled steel tank kerosene 11 according to ROM, an underground double-walled steel tank gasoline 12 according to ROM, an underground double-walled steel tank diesel fuel 13 according to ROM, an underground double-walled steel tank emergency 14 according to ROM, an operator's room 19 according to ROM" located at 50a Front Brigades Street, Yekaterinburg, Sverdlovsk Region, the results of such work meet the requirements of project documentation, including energy efficiency requirements, with the exception of capital construction facilities for which energy efficiency requirements do not apply, and the requirements for equipping the capital construction facility with metering devices for energy resources used, as well as the availability of a construction permit and compliance with the requirements of Parts 2 3 and 31 Article 52 of the Urban Planning Code of the Russian Federation


# 661802071670
Unscheduled inspection
Start date: 2018-11-12, end date: —, duration:
Authority:
Purpose of inspection:


# 661800615592
Unscheduled inspection
Start date: 2018-08-13, end date: 2018-09-07, duration:
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: the purpose is to implement the inspection program 29170113318 dated April 23, 2018. The task is to carry out regional state construction supervision. The subject is to verify the compliance of the work and applicable building materials during the construction of the capital construction facility "Stage 1 of the construction of a warehouse of light petroleum products with filling ramps. the site for draining railway tanks 2 on ROM. the site for draining automobile tanks 3 on ROM. the site for filling automobile tanks 7 according to ROM, a product pumping station 8 according to ROM, a stormwater storage tank 9 according to ROM, local rainwater treatment plants 10 according to ROM, an underground double-walled steel tank kerosene 11 according to ROM, an underground double-walled steel tank gasoline 12 according to ROM, an underground double-walled steel tank diesel fuel 13 according to ROM, an underground double-walled steel tank emergency 14 according to ROM, an operator's room 19 according to ROM" located at 50a Front Brigades Street, Yekaterinburg, Sverdlovsk Region, the results of such work meet the requirements of technical regulations and project documentation, including energy efficiency requirements and requirements for equipping a capital construction facility with metering devices for energy resources used, as well as the availability of a construction permit and compliance with the requirements of Parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation


# 661800341733
Unscheduled inspection
Start date: 2018-05-07, end date: 2018-06-01, duration:
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: This inspection is carried out in order to implement the inspection program 29170113318 dated April 23, 2018. The objectives of this inspection are to carry out regional state construction supervision. The subject of this inspection is to verify the compliance of the work performed and the building materials used in the construction of the capital construction facility "Stage 1 of the construction of a warehouse of light petroleum products with draining ramps, the site of the discharge of railway tanks 2 according to ROM, the site of the discharge automobile tanks 3 on ROM filling site for automobile tanks 7 on ROM product pumping station 8 on ROM stormwater storage tank 9 on ROM local rainwater treatment plants 10 on ROM underground double-walled steel tank kerosene 11 on ROM underground double-walled steel tank gasoline 12 on ROM underground double-walled steel tank diesel fuel 13 on ROM underground double-walled steel tank emergency tank 14 according to ROM operator 19 according to ROM" located at 50a Front Brigades Street, Yekaterinburg, Sverdlovsk Region, the results of such work meet the requirements of technical regulations for project documentation, including energy efficiency requirements and requirements for equipping a capital construction facility with metering devices for energy resources used, as well as the availability of a construction permit and compliance with the requirements of Parts 2 3 and 31 Article 52 of the Urban Planning Code of the Russian Federation


Information about inspections

This section displays information about planned and carried out inspections of control (supervision) bodies in accordance with Federal Law No. 294-FZ. Detailed information about the inspection can be obtained from the Unified Register of Inspections of the Prosecutor General's Office.