# 292101343198
Unscheduled inspection
Start date: 2021-11-15, end date: 2021-11-26, duration: 10
Authority: Agentstvo po tarifam i cenam Arhangelskoi oblasti
Purpose of inspection: verification of the fulfillment of the instruction of the Agency for Tariffs and Prices of the Arkhangelsk Region dated September 28, 2021 No. 06-17/1, prevention, detection and suppression of violations related to the illegality and unreasonableness of setting, changing and applying tariffs for electric energy transmission services, fees for technological connection to electric networks, compliance with the agency's instructions on tariffs and prices Arkhangelsk region
# 782100285513
Unscheduled inspection
Start date: 2021-06-08, end date: —, duration: 3
Authority: Severo-Zapadnoe upravlenie Federalnoi sluzhby po ekologicheskomu, tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: monitoring of measures taken by a legal entity (individual entrepreneur) to eliminate violations of mandatory requirements in connection with the expiration of the deadline for the execution of regulations (n/a No. 1-4) No. 58-6186-3012/PR dated 31.10.2019;
The objectives of this review are:
- taking measures provided for by the legislation of the Russian Federation to prevent and eliminate violations of mandatory requirements (if any) and to bring to justice those who have committed violations of the requirements of Federal laws and other regulatory legal acts.
# 002005171412
Unscheduled inspection
Start date: 2020-10-02, end date: 2020-10-29, duration: 20
Authority: SeveroZapadnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: this inspection is carried out in order to control the preparation of electric power facilities for operation in complex technological modes in accordance with the order of Rostechnadzor "On monitoring the progress of preparation of electric power and heat supply facilities for operation in the autumn-winter period 2020 2021" dated 08072020 267 issued in accordance with the instruction of the Government of the Russian Federation dated 03072020 YUBP97109 The tasks of this inspection are to monitor the legal decisions taken by a person, an individual entrepreneur, measures to comply with the requirements affecting the readiness of electric power facilities to work in the autumn-winter period of mandatory requirements, taking measures provided for by the legislation of the Russian Federation to prevent and eliminate violations of mandatory requirements if they are identified and to bring to justice persons who have violated the requirements of Federal laws and other regulatory legal acts
# 001903886322
Unscheduled inspection
Start date: 2019-10-29, end date: 2019-10-31, duration: —
Authority: SeveroZapadnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: control of the preparation of electric power facilities for the heating period in accordance with the Rostechnadzor Order "On monitoring the progress of preparation of electric Power facilities for operation in the autumn-winter period of 2019 2020" dated 04072019262 issued in accordance with the instruction of the Government of the Russian Federation dated 18062019 DKP94982THE tasks of this audit are to monitor the measures taken by a legal entity, an individual entrepreneur, to ensure that electric power entities comply with safety requirements in the field of electric power engineering affecting the fulfillment of requirements for readiness for the heating period of mandatory requirements