Found 1 inspection:

# 74170802977647
Unscheduled inspection
Start date: 2017-12-15, end date: 2017-12-21, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of work on the installation of technological equipment with a gas pipeline with compliance with fire and sanitary epidemiological measures and building materials used during the construction of a capital construction facility, as well as the results of such work, with the requirements of technical regulations of project documentation2 Availability of construction permits 3 Compliance with the requirements of h 23 and 31 st 52 of the Urban Planning Code of the Russian Federation


Information about inspections

This section displays information about planned and carried out inspections of control (supervision) bodies in accordance with Federal Law No. 294-FZ. Detailed information about the inspection can be obtained from the Unified Register of Inspections of the Prosecutor General's Office.