Unscheduled inspection
Start date: 2017-12-15, end date: 2017-12-21, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of work on the installation of technological equipment with a gas pipeline with compliance with fire and sanitary epidemiological measures and building materials used during the construction of a capital construction facility, as well as the results of such work, with the requirements of technical regulations of project documentation2 Availability of construction permits 3 Compliance with the requirements of h 23 and 31 st 52 of the Urban Planning Code of the Russian Federation