Found 18 inspections:

# 742004351039
Unscheduled inspection
Start date: 2020-03-23, end date: 2020-03-27, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work on the installation of external and internal engineering networks and the construction materials used during the construction reconstruction of a capital construction facility, as well as the results of such work, with the requirements of the design documentation approved in accordance with Parts 15 152 and 153 of Article 48 of this Code, taking into account the changes made to the design documentation in accordance with parts 38 and 39 of Article 49 of this Code. If the formation and maintenance of an information model are mandatory in accordance with the requirements of this Code, including energy efficiency requirements, with the exception of capital construction facilities for which energy efficiency requirements do not apply and the requirements for equipping the capital construction facility with metering devices for energy resources used2 The availability of a construction permit 3 Meeting the requirements of HR 23 and 31 st52 of the Urban Planning Code of the Russian Federation


# 742004351095
Unscheduled inspection
Start date: 2020-03-24, end date: —, duration:
Authority:
Purpose of inspection:


# 742004274305
Unscheduled inspection
Start date: 2020-02-17, end date: 2020-02-21, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work on the installation of internal engineering networks ventilation installation of translucent structures finishing and the construction materials used during the construction reconstruction of the capital construction facility as well as the results of such work with the requirements of the project documentation approved in accordance with Parts 15 152 and 153 of Article 48 of this Code, taking into account the changes made to the project documentation in accordance with Parts 38 and 39 article 49 of this Code and or an information model, if the formation and maintenance of an information model are mandatory in accordance with the requirements of this Code, including energy efficiency requirements, with the exception of capital construction facilities to which energy efficiency requirements do not apply and the requirements for equipping the capital construction facility with metering devices for used energy resources 2 The availability of a construction permit 3 The fulfillment of the requirements hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation


# 742004274345
Unscheduled inspection
Start date: 2020-02-14, end date: 2020-02-20, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work on the installation of external and internal engineering networks and the construction materials used during the construction reconstruction of a capital construction facility, as well as the results of such work, with the requirements of the project documentation approved in accordance with Parts 15 152 and 153 of Article 48 of this Code, taking into account the changes made to the project documentation in accordance with parts 38 and 39 of Article 49 of this Code. If the formation and maintenance of an information model are mandatory in accordance with the requirements of this Code, including energy efficiency requirements, with the exception of capital construction facilities for which energy efficiency requirements do not apply and the requirements for equipping the capital construction facility with metering devices for energy resources used2 The availability of a construction permit 3 Meeting the requirements of HR 23 and 31 st52 of the Urban Planning Code of the Russian Federation


# 742004158422
Unscheduled inspection
Start date: 2020-01-10, end date: 2020-01-16, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of exterior finishing works finishing of the basement finishing of internal engineering networks of the roof finishing of translucent structures installation of external engineering networks and construction materials used during the construction reconstruction of the capital construction facility as well as the results of such work with the requirements of the project documentation approved in accordance with parts 15 152 and 153 of Article 48 of this Code, taking into account the changes made to the design documentation documentation in accordance with parts 38 and 39 of Article 49 of this Code and or an information model, if the formation and maintenance of an information model are mandatory in accordance with the requirements of this Code, including energy efficiency requirements, with the exception of capital construction facilities for which energy efficiency requirements do not apply and the requirements for equipping the capital construction facility with metering devices used for energy resource 2 Availability of a building permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation


# 742004162548
Unscheduled inspection
Start date: 2020-01-13, end date: —, duration:
Authority:
Purpose of inspection:


# 741903992926
Unscheduled inspection
Start date: 2019-11-25, end date: —, duration:
Authority:
Purpose of inspection:


# 741903611889
Unscheduled inspection
Start date: 2019-09-30, end date: —, duration:
Authority:
Purpose of inspection:


# 741902934465
Unscheduled inspection
Start date: 2019-08-26, end date: —, duration:
Authority:
Purpose of inspection:


# 741902792232
Unscheduled inspection
Start date: 2019-06-17, end date: 2019-06-21, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of landscaping work prior to asphalt laying and landscaping of external engineering networks of water supply and sewerage of electricity supply completion of internal engineering networks of water supply completion of fire protection of building structures workshop ABC completion of the construction materials used during the construction of the capital construction facility as well as the results of project documentation2 Availability of construction permits 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation


# 741902690784
Unscheduled inspection
Start date: 2019-05-20, end date: 2019-05-24, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work on the installation of floors, the completion of foundations for equipment, the completion of low-current networks of external finishing works, ABK fire protection of building structures, the workshop of internal gas supply and heating networks, the completion of the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of technical regulations, project documentation, 2 Availability of a construction permit, 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation


# 741902626298
Unscheduled inspection
Start date: 2019-04-15, end date: 2019-04-19, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of finishing works of ventilation and air conditioning systems of internal drainage networks of household rain production and drainage sewerage networks completion of external gas supply networks completion of fire protection of building structures and applied building materials during the construction of a capital construction facility as well as the results of such work with the requirements of technical regulations of the project documentation 2 Availability of a construction permit 3 Fulfillment of the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation


# 741902570895
Unscheduled inspection
Start date: 2019-03-18, end date: 2019-03-22, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work on the installation of the boiler house floors and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation


# 741902512027
Unscheduled inspection
Start date: 2019-02-18, end date: —, duration:
Authority:
Purpose of inspection:


# 741902415920
Unscheduled inspection
Start date: 2019-01-16, end date: —, duration:
Authority:
Purpose of inspection:


# 741802215743
Unscheduled inspection
Start date: 2018-12-11, end date: 2018-12-17, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work on the installation of basement beams and foundations FO1 the installation of roofs and enclosing structures of internal engineering networks of gas supply, water supply, external engineering networks and building materials used during the construction of a capital construction facility, as well as the results of such work, with the requirements of technical regulations of the project documentation 2 Availability of a building permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation


# 74170701870587
Unscheduled inspection
Start date: 2017-08-10, end date: 2017-08-16, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Verification of compliance with the regulations of 07062017 g2 Availability of a building permit 3 Compliance with the requirements of hh 23 and 31 Art 52 of the Urban Planning Code of the Russian Federation


# 74170701661139
Unscheduled inspection
Start date: 2017-06-01, end date: 2017-06-07, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work on the installation of external and internal engineering networks, landscaping, fire and sanitary epidemiological standards and the construction materials used during the construction of a capital construction facility, as well as the results of such work, with the requirements of technical regulations of project documentation2 Availability of a construction permit3 Compliance with the requirements of hh 23 st52 of the Urban Planning Code of the Russian Federation